Differences between revisions 19 and 138 (spanning 119 versions)
Revision 19 as of 2017-05-09 10:58:42
Size: 1696
Editor: MarkBarton
Comment:
Revision 138 as of 2017-09-19 10:34:55
Size: 4042
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= VIS Type B Near Term To-Do List = = VIS Type B BS Near Term To-Do List =
Line 3: Line 3:
../ToDoOld [[../ToDoOldBS|Archived BS To-Do Items]]

[[../ToDoSR|SR To-Do Items]]

[[#EveryWeek |Every Week]]

[[#ComingWeeks |Coming Weeks]]

<<Anchor(EveryWeek)>>
Line 6: Line 14:
=== Facilities (mostly full team) ===
 * Clean up after floor work.
=== Facilities ===
Line 11: Line 18:
 * Get stuff from [[../WishList]]
Line 12: Line 20:
== 2017-05-09 == <<Anchor(ComingWeeks)>>
Line 14: Line 22:
=== Continue PI Prep ===
 * Find, install and wire up PI yaw stepper and bracket.
 * Decide pattern of SF damper ring magnets (48 pieces).
 * Install magnets on SF damper ring.
 * Wire up PI vertical fishing rod stepper.
 * Wire up PI horizontal fishing rod steppers.
 * Install and wire up geophones.
== 2017-09-19 ==
(No work Monday 9/18)
=== Main Assembly Sequence ===
 * Debug BF LVDT actuation.
 * Check F0 yoke height (top of coil former should be 37.5 mm above bottom of recess in top of baseplate).
 * Test all PI items:
  * Yaw stepper (tested, not clearly working).
  * F0 LVDT sensing
  * F0 LVDT actuation
  * Horizontal LVDT sensing
  * Horizontal LVDT actuation
  * Geophones (issues with driver, cables, descramblers)
 * Lock the F0 and SF keystones and measure the resonance frequency of the BF GAS.
 * Lock the SF and BF keystones and measure the resonance frequency of the F0 GAS.
 * Double check BS pitch with OL.
 * Adjust SF damper ring to correct gap.
 * Install lock nuts on F0 GAS FR at TBD positions.
 * Lock BF and F0 keystones (but ''not'' SF keystone).
 * Lock RM to BS and IRM to IM.
 * Lock RM, IRM and BF (but not SF) to security structure.
 * Lock IP.
 * Remove F0 keystone top plate (including yaw stepper) and immobilize SF/... in yaw.
 * Attach lifting fixture.
 * Remove BF- and SF-level crossbars.
 * Remove geophones for craning.
 * Disconnect in-vacuum cables from feedthrough and coil neatly for craning.
 * Attach lifting plates.
=== Tank Preparation Sequence ===
 * Attach Cu segments to LBB damper ring.
 * Pass halves of LBB magnet ring into tank, join, and make sandwich for craning.
 * Crane tank lid off.
 * Crane LBB damper rings to top of tank and suspend.
 * Crane suspension out of assembly frame.
 * Attach LBB upper rods to LBB blade tips and rotate suspension 45° clockwise.
 * Crane suspension into tank and connect upper rods to LBB Cu ring.
 * Unclamp LBB ring "sandwich" so LBB Cu ring is suspended on upper rods.
 * Install LBB lower rods and hook LBB.
 * Measure required ballast for LBB.
 * Unlock suspension and readjust.
 * Move in-air cabling and feedthroughs and reconnect in-vacuum cables (through Cu O-rings).
Line 22: Line 63:
=== Hanging SF/BF/IRM/IM/RM/BS ===
 * Fix centering of SF/... section.
 * Remove PI again.
 * Do final trim of SF, fix LVDT if needed.
 * Remove Cu damper segment if necessary.
 * Lift PI and hang LBB damper ring.
 * Crane PI back in.
 * Install hex cable clamp on rod.
 * Re-hook SF/... section.
=== In parallel, time permitting ===
 * Fix issue with geophone distributor.
 * Fix #1 geophone adapter cable (and replace borrowed one).
 * Fix broken pico adapter cable.
 * Figure out how to tighten PI yaw return spring or otherwise make yaw adjustment reliable.
Line 32: Line 69:
=== Electronics ===
 * Count used, unused, broken and needed in-vacuum cables and send data to Sato-san.
 * Debug SF LVDT.
 * Make PI vertical/yaw stepper in-air adapter cable.
 * Finish adding retaining screws to cables at feedthroughs.
 * Check connections in new geophone adapters and make unscrambler cables if necessary.
 * Decide final length for BS OSEM cables.
<<Anchor(RealBSHang)>>
== Tasks Not To Forget ==
=== Major Tasks ===
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
 * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
 * Get pico drive screens fixed (Miyo-kun)

=== Minor Tasks ===
==== Mechanical ====
 * Get clean bag laundered.
 * Put pointy-tipped screw in RM trolley for BS
 * Return/replace borrowed parts:
  * Lock washers for LBB dampers
  * Temporary ballast mass (dog clamps) in BF.
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

==== Electrical ====
 * Decide final in-vacuum and in-air cable routing (Enzo).
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, PI-GAS, PI-H1, PI-H2, PI-H3
 * Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

==== Real-time and SUMCON models ====
 * Create SUMCON models for full BS and major installation milestones.
 * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]).
Line 40: Line 94:

== Real-time and SUMCON models ==
Line 46: Line 98:
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-09-19

(No work Monday 9/18)

Main Assembly Sequence

  • Debug BF LVDT actuation.
  • Check F0 yoke height (top of coil former should be 37.5 mm above bottom of recess in top of baseplate).
  • Test all PI items:
    • Yaw stepper (tested, not clearly working).
    • F0 LVDT sensing
    • F0 LVDT actuation
    • Horizontal LVDT sensing
    • Horizontal LVDT actuation
    • Geophones (issues with driver, cables, descramblers)
  • Lock the F0 and SF keystones and measure the resonance frequency of the BF GAS.
  • Lock the SF and BF keystones and measure the resonance frequency of the F0 GAS.
  • Double check BS pitch with OL.
  • Adjust SF damper ring to correct gap.
  • Install lock nuts on F0 GAS FR at TBD positions.
  • Lock BF and F0 keystones (but not SF keystone).

  • Lock RM to BS and IRM to IM.
  • Lock RM, IRM and BF (but not SF) to security structure.
  • Lock IP.
  • Remove F0 keystone top plate (including yaw stepper) and immobilize SF/... in yaw.
  • Attach lifting fixture.
  • Remove BF- and SF-level crossbars.
  • Remove geophones for craning.
  • Disconnect in-vacuum cables from feedthrough and coil neatly for craning.
  • Attach lifting plates.

Tank Preparation Sequence

  • Attach Cu segments to LBB damper ring.
  • Pass halves of LBB magnet ring into tank, join, and make sandwich for craning.
  • Crane tank lid off.
  • Crane LBB damper rings to top of tank and suspend.
  • Crane suspension out of assembly frame.
  • Attach LBB upper rods to LBB blade tips and rotate suspension 45° clockwise.
  • Crane suspension into tank and connect upper rods to LBB Cu ring.
  • Unclamp LBB ring "sandwich" so LBB Cu ring is suspended on upper rods.
  • Install LBB lower rods and hook LBB.
  • Measure required ballast for LBB.
  • Unlock suspension and readjust.
  • Move in-air cabling and feedthroughs and reconnect in-vacuum cables (through Cu O-rings).

In parallel, time permitting

  • Fix issue with geophone distributor.
  • Fix #1 geophone adapter cable (and replace borrowed one).
  • Fix broken pico adapter cable.
  • Figure out how to tighten PI yaw return spring or otherwise make yaw adjustment reliable.

Tasks Not To Forget

Major Tasks

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Get pico drive screens fixed (Miyo-kun)

Minor Tasks

Mechanical

  • Get clean bag laundered.
  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

Electrical

  • Decide final in-vacuum and in-air cable routing (Enzo).
  • Calibrate all LVDTs (Enzo, Mark). BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3

  • Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)