Line 24: Line 24:
=== Pumpdown Prep ===
 * Prepare BS Chamber
  * --(Remove non-vacuum-compatible ballast from LBB.)--
  * --(Check for lost tools.)--
  * Wipe down all accessible areas inside tank with Vector Alpha wipes and ethanol.
 * Help Type Bp Team
  * --(Add screws to cables at PR2 feedthroughs.)--
 * Calibrate LEN OL
  * Ask commissioning team for window of opportunity.
  * Turn off TILT OL control.
  * Uncover breadboard.
  * Scan LEN QPD in horizontal and vertical while noting output.
  * Recenter LEN QPD.
  * Re-cover breadboard.
  * Re-engage TILT control.

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

ASAP

  • Calibrate LEN OL
    • Ask commissioning team for window of opportunity.
    • Turn off TILT OL control.
    • Uncover breadboard.
    • Scan LEN QPD in horizontal and vertical while noting output.
    • Recenter LEN QPD.
    • Re-cover breadboard.
    • Re-engage TILT control.

Main Assembly Sequence

  • Necessary for phase-I★★★
    • Modify IP LVDT damping filters to include set point.

    • TFs.

    • EXCHANGE YAW/VERT FRs at F0

    • Check IP BIO is working or not.
  • Necessary for phase-II★★
    • Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)

    • Design PI Sensor blending filter.
    • Re-calibrate F0 GAS LVDT
    • Tune the LVDT sensitivity
    • Measure IP period; adjust ballast mass.
  • At some point (remotely)★
    • Improve OL offloading.
    • Improve GAS offloading.
    • Spectral analysis of Oplev.
    • Design, install angular lock servo using OL. (Almost done for phase-I)
    • Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I)
    • Subtract DC level of Geophones.
    • Spectra analysis of PI sensors (PI LVDTs and Geophones).
    • Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
    • Set all EQ stops to TBD clearance.
    • Modify the model for IP coil driver control

Documentation and Operation Manual

  • Add useful info from Enzo's notebook to BSData.

Tasks Not To Forget

Major Tasks

  • Move safety bars from BS AF area to SR2 area.
  • Close hole in floor above BS AF area.
  • Update circuit diagram.
  • (Time permitting) Try adding mass to IP.
  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Figure out how to make PI yaw adjustment reliable.

Minor Tasks

Mechanical

  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Temporary ballast mass (dog clamps) in BF.

Electrical

  • Update BS Circuit diagram, D1503600
    • Make generic for BS+SRx???
    • Note removal of LED/PD on TM OSEMs.
    • Include information on assignment of channels to feedthrough positions.
    • Reflect gender-changers and non-flipping feedthrough adapters.
    • Reflect actual cable lengths.
    • Include LVDT pin size (1 mm).
    • Undo renumbering of IP items.

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.