To-Do List 2017-03-13 2017-03-13

VIS Type B Near Term To-Do List

2017-03-13

Facilities

  • Vacuum and roll floor (All)
  • Wipe ladders (All)
  • Tidy tools, parts (All)
  • Find missing light lent to Kokeyama-san (Mark)
  • Mark/photograph/count peeling patches on the floor.
  • Mark/photograph/count pillars with bare concrete bases.

Electronics

  • Wire up BF roll/pitch picos (Enzo)
  • Work with Miyo-kun to get pico drivers added to BS rack and screens (Enzo, Mark)
  • Grab remaining cables etc per E1605111 and update document (Enzo)
  • Update E1503600 with DIO card for HPCDs, etc, etc. (Enzo)
  • Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
  • Send list of required in-vacuum cables to Takahashi-san (Enzo, Mark)
  • Debug 900 Hz noise on BF LVDT output (Enzo, Mark)
  • Debug excess noise on TM-H3 OSEM (Enzo, Mark)
  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

PI Prep

  • Inspect PI, compare to CAD and 2D drawings (Hirata, Mark)
  • Identify missing PI parts (Hirata, Mark)
  • Find and reattach repaired LVDT coil(s) (???)

Hanging BF/IRM/IM/RM/BS

  • Correct orientation of SF cap (Mark, Fabian, Perry)
  • Correct orientation of SF (Mark, Fabian, Perry)
  • Find/attach cable clamps for SF (Fabian)

Real-time and SUMCON models

  • Update SUMCON model of full BS (Perry?, Okutomi?, Mark?)
  • Do cut-down SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?)
  • Compare measured TFs to cut-down model
  • Create a proper DAC Monitor MEDM screen
  • Improve ADC Monitor MEDM screen