= VIS Type B Near Term To-Do List = = VIS Type B BS Near Term To-Do List =
Line 3: Line 3:
../ToDoOld [[../ToDoOldBS|Archived BS To-Do Items]]

[[../ToDoSR|SR To-Do Items]]

[[#EveryWeek |Every Week]]

[[#ComingWeeks |Coming Weeks]]

<<Anchor(EveryWeek)>>
Line 6: Line 14:
=== Facilities (mostly full team) ===
 * Clean up after floor work.
=== Facilities ===
Line 11: Line 18:
 * Get stuff from [[../WishList]]
Line 12: Line 20:
== 2017-05-09 == <<Anchor(ComingWeeks)>>
== 2017-09-04 ==
Line 14: Line 23:
=== Continue PI Prep ===
 * ''Find, install'' and wire up PI yaw stepper and bracket.
 * Decide pattern of SF damper ring magnets (48 pieces).
 * Install magnets on SF damper ring.
 * Wire up PI vertical fishing rod stepper.
 * Wire up PI horizontal fishing rod steppers.
 * Install and wire up geophones.
=== Main Assembly Sequence ===
 * --(Crane out SF.)--
 * --(Raise BF cap and retrieve lost hex cable clamp PEEK piece.)--
 * --(Crane in SF.)--
 * --(Install SF-BF rod with hex cable clamp.)--
 * --(Route cables via hex cable clamp up to below SF.)--
 * --(Adjust BF ballast mass for total weight and pitch/roll.)--
 * --(Look for missing screw from SF damper Cu segment in washed screws bag and reinstall.)--
 * --(Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).)--
 * Calibrate SF LVDT.
 * Install SF main ballast mass.
 * --(Cable and test SF fishing rod stepper.)--
 * Add SF cap.
 * Lift and weigh SF/... section.
 
Line 22: Line 39:
=== Hanging SF/BF/IRM/IM/RM/BS ===
 * Fix centering of SF/... section.
 * Remove PI again.
 * Do final trim of SF, fix LVDT if needed.
 * Remove Cu damper segment if necessary.
 * Lift PI and hang LBB damper ring.
 * Crane PI back in.
 * Install hex cable clamp on rod.
 * Re-hook SF/... section.
=== In parallel, time permitting ===
 * --(Rearrange arc weights on PI to allow installation of magic wand.)--
 * Install magic wand on PI.
 * Check that we still have all LBB parts (there was an issue with borrowed lock nuts).
 * Rearrange magnets on SF damper magnet ring for full three Cu segments.
 * --(Find Ni-plated rods for SF damper magnet ring and do fit check.)--
 * --(Find PI-SF rod with 8 mm heads and matching receptacles and do fit check.)--
 * Lay more new in-air cabling.
 * Wipe LLB damper parts with ethanol.
 * Get Cu O-rings for feedthroughs.
 * Figure out how to tighten PI yaw return spring.
 * --(Recalibrate remachined LBB springs and choose best three.)--
Line 32: Line 52:
=== Electronics ===
 * Count used, unused, broken and needed in-vacuum cables and send data to Sato-san.
 * Debug SF LVDT.
 * Make PI vertical/yaw stepper in-air adapter cable.
 * Finish adding retaining screws to cables at feedthroughs.
 * ''Check connections in new geophone adapters'' and make unscrambler cables if necessary.
 * Decide final length for BS OSEM cables.
<<Anchor(RealBSHang)>>
== Tasks Not To Forget ==
=== Major Tasks ===
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
 * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
 * Get pico drive screens fixed (Miyo-kun)
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.

=== Minor Tasks ===
==== Mechanical ====
 * Get clean bag laundered.
 * Put pointy-tipped screw in RM trolley for BS
 * Return/replace borrowed parts:
  * Lock washers for LBB dampers
  * Temporary ballast mass (dog clamps) in BF.
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

==== Electrical ====
 * Decide final in-vacuum and in-air cable routing (Enzo).
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, SF, PI-GAS, PI-H1, PI-H2, PI-H3
 * Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

==== Real-time and SUMCON models ====
 * Create SUMCON models for full BS and major installation milestones.
 * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]).
Line 40: Line 80:

== Real-time and SUMCON models ==
Line 46: Line 84:
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.
 * --(Create a proper DAC Monitor MEDM screen.)--
 * --(Improve ADC Monitor MEDM screen.)--

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-09-04

Main Assembly Sequence

  • Crane out SF.

  • Raise BF cap and retrieve lost hex cable clamp PEEK piece.

  • Crane in SF.

  • Install SF-BF rod with hex cable clamp.

  • Route cables via hex cable clamp up to below SF.

  • Adjust BF ballast mass for total weight and pitch/roll.

  • Look for missing screw from SF damper Cu segment in washed screws bag and reinstall.

  • Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).

  • Calibrate SF LVDT.
  • Install SF main ballast mass.
  • Cable and test SF fishing rod stepper.

  • Add SF cap.
  • Lift and weigh SF/... section.

In parallel, time permitting

  • Rearrange arc weights on PI to allow installation of magic wand.

  • Install magic wand on PI.
  • Check that we still have all LBB parts (there was an issue with borrowed lock nuts).
  • Rearrange magnets on SF damper magnet ring for full three Cu segments.
  • Find Ni-plated rods for SF damper magnet ring and do fit check.

  • Find PI-SF rod with 8 mm heads and matching receptacles and do fit check.

  • Lay more new in-air cabling.
  • Wipe LLB damper parts with ethanol.
  • Get Cu O-rings for feedthroughs.
  • Figure out how to tighten PI yaw return spring.
  • Recalibrate remachined LBB springs and choose best three.

Tasks Not To Forget

Major Tasks

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Get pico drive screens fixed (Miyo-kun)
  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Calibrate PI horizontal LVDTs.

Minor Tasks

Mechanical

  • Get clean bag laundered.
  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

Electrical

  • Decide final in-vacuum and in-air cable routing (Enzo).
  • Calibrate all LVDTs (Enzo, Mark). BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3

  • Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.
  • Create a proper DAC Monitor MEDM screen.

  • Improve ADC Monitor MEDM screen.