1704
Comment:
|
← Revision 210 as of 2019-01-04 15:21:23 ⇥
155
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= VIS Type B Near Term To-Do List = | = VIS Type B BS Near Term To-Do List = |
Line 3: | Line 3: |
../ToDoOld | This list has been merged into the common Type B list: [[../ToDo]]. |
Line 5: | Line 5: |
== Every Week == === Facilities (mostly full team) === * Clean up after floor work. * Vacuum and roll floor. * Wipe ladders. * Tidy tools, parts. == 2017-05-09 == === Continue PI Prep === * ''Find, install'' and wire up PI yaw stepper and bracket. * Decide pattern of SF damper ring magnets (48 pieces). * Install magnets on SF damper ring. * Wire up PI vertical fishing rod stepper. * Wire up PI horizontal fishing rod steppers. * Install and wire up geophones. === Hanging SF/BF/IRM/IM/RM/BS === * Fix centering of SF/... section. * Remove PI again. * Do final trim of SF, fix LVDT if needed. * Remove Cu damper segment if necessary. * Lift PI and hang LBB damper ring. * Crane PI back in. * Install hex cable clamp on rod. * Re-hook SF/... section. === Electronics === * Count used, unused, broken and needed in-vacuum cables and send data to Sato-san. * Debug SF LVDT. * Make PI vertical/yaw stepper in-air adapter cable. * Finish adding retaining screws to cables at feedthroughs. * ''Check connections in new geophone adapters'' and make unscrambler cables if necessary. * Decide final length for BS OSEM cables. * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark) == Real-time and SUMCON models == * Understand/document/debug Kokeyama-san's DIO stuff. * Measure LPCD and HPCD output filter response. * Design and install software compensation filters for LPCD and HPCD output filters. * Design and install GAS drift compensation filters. * Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. |
[[../ToDoOldBS|Archived BS To-Do Items]] |