Differences between revisions 20 and 22 (spanning 2 versions)
Revision 20 as of 2017-05-09 16:46:26
Size: 1704
Editor: MarkBarton
Comment:
Revision 22 as of 2017-05-16 10:13:44
Size: 1979
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
=== Facilities (mostly full team) ===
 * Clean up after floor work.
=== Facilities ===
Line 12: Line 11:
== 2017-05-09 == == 2017-05-15 ==
Line 14: Line 13:
=== Continue PI Prep ===
 * ''Find, install'' and wire up PI yaw stepper and bracket.
 * Decide pattern of SF damper ring magnets (48 pieces).
== Facilities ==
 * --(Clear spaces for PR2 bellows work and SR2 ladder installation on 5/15.)--
 * --(Fix safety bar on -X side of assembly frame (move to other side of pillars and attach more securely).)--

== Design/Purchasing ==
 * Order longer threaded rods for arc weights on PI.
 * Design, order modifications to LBB blade springs.

=== Main Assembly ===
 * Remove PI.
 * Fix jammed PI-SF rod.
 * Remove SF cap.
 * Remove blades from LBB blade units and send off for rework.
 * Install remaining cable clamps on PI.
 * Remove one Cu damper segment from SF cap and reconfigure remaining two to be symmetrical.
 * Decide pattern of SF damper ring magnets (72 pieces in 2/3 of the original ring).
Line 18: Line 30:
 * Wire up PI vertical fishing rod stepper.
 * Wire up PI horizontal fishing rod steppers.
 * Install and wire up geophones.

=== Hanging SF/BF/IRM/IM/RM/BS ===
 * Fix centering of SF/... section.
 * Remove PI again.
 * Do final trim of SF, fix LVDT if needed.
 * Remove Cu damper segment if necessary.
Line 29: Line 32:
 * Install hex cable clamp on rod.  * Install rod, this time with hex cable clamp.
Line 31: Line 34:
 * Install geophones.
Line 33: Line 37:
 * Count used, unused, broken and needed in-vacuum cables and send data to Sato-san.
 * Debug SF LVDT.
 * Make PI vertical/yaw stepper in-air adapter cable.
 * Finish adding retaining screws to cables at feedthroughs.
 * ''Check connections in new geophone adapters'' and make unscrambler cables if necessary.
 * Debug and calibrate SF LVDT.
 * Put connector on PI vertical LVDT wires per E1503600-v13 Sheet 5.
 * Make PI vertical/yaw stepper in-air adapter cable per E1503600-v13 Sheet 7.
 * Make (in-air) geophone unscrambler cables per E1503600-v13 Sheet 8.
 * Complete cabling of PI stuff (steppers, LVDTs, geophones) through to rack and test.

VIS Type B Near Term To-Do List

../ToDoOld

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.

2017-05-15

Facilities

  • Clear spaces for PR2 bellows work and SR2 ladder installation on 5/15.

  • Fix safety bar on -X side of assembly frame (move to other side of pillars and attach more securely).

Design/Purchasing

  • Order longer threaded rods for arc weights on PI.
  • Design, order modifications to LBB blade springs.

Main Assembly

  • Remove PI.
  • Fix jammed PI-SF rod.
  • Remove SF cap.
  • Remove blades from LBB blade units and send off for rework.
  • Install remaining cable clamps on PI.
  • Remove one Cu damper segment from SF cap and reconfigure remaining two to be symmetrical.
  • Decide pattern of SF damper ring magnets (72 pieces in 2/3 of the original ring).
  • Install magnets on SF damper ring.
  • Lift PI and hang LBB damper ring.
  • Crane PI back in.
  • Install rod, this time with hex cable clamp.
  • Re-hook SF/... section.
  • Install geophones.

Electronics

  • Debug and calibrate SF LVDT.
  • Put connector on PI vertical LVDT wires per E1503600-v13 Sheet 5.
  • Make PI vertical/yaw stepper in-air adapter cable per E1503600-v13 Sheet 7.
  • Make (in-air) geophone unscrambler cables per E1503600-v13 Sheet 8.
  • Complete cabling of PI stuff (steppers, LVDTs, geophones) through to rack and test.
  • Decide final length for BS OSEM cables.
  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)

Real-time and SUMCON models

  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.
  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.