1979
Comment:
|
← Revision 210 as of 2019-01-04 15:21:23 ⇥
155
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= VIS Type B Near Term To-Do List = | = VIS Type B BS Near Term To-Do List = |
Line 3: | Line 3: |
../ToDoOld | This list has been merged into the common Type B list: [[../ToDo]]. |
Line 5: | Line 5: |
== Every Week == === Facilities === * Vacuum and roll floor. * Wipe ladders. * Tidy tools, parts. == 2017-05-15 == == Facilities == * --(Clear spaces for PR2 bellows work and SR2 ladder installation on 5/15.)-- * --(Fix safety bar on -X side of assembly frame (move to other side of pillars and attach more securely).)-- == Design/Purchasing == * Order longer threaded rods for arc weights on PI. * Design, order modifications to LBB blade springs. === Main Assembly === * Remove PI. * Fix jammed PI-SF rod. * Remove SF cap. * Remove blades from LBB blade units and send off for rework. * Install remaining cable clamps on PI. * Remove one Cu damper segment from SF cap and reconfigure remaining two to be symmetrical. * Decide pattern of SF damper ring magnets (72 pieces in 2/3 of the original ring). * Install magnets on SF damper ring. * Lift PI and hang LBB damper ring. * Crane PI back in. * Install rod, this time with hex cable clamp. * Re-hook SF/... section. * Install geophones. === Electronics === * Debug and calibrate SF LVDT. * Put connector on PI vertical LVDT wires per E1503600-v13 Sheet 5. * Make PI vertical/yaw stepper in-air adapter cable per E1503600-v13 Sheet 7. * Make (in-air) geophone unscrambler cables per E1503600-v13 Sheet 8. * Complete cabling of PI stuff (steppers, LVDTs, geophones) through to rack and test. * Decide final length for BS OSEM cables. * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark) == Real-time and SUMCON models == * Understand/document/debug Kokeyama-san's DIO stuff. * Measure LPCD and HPCD output filter response. * Design and install software compensation filters for LPCD and HPCD output filters. * Design and install GAS drift compensation filters. * Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. |
[[../ToDoOldBS|Archived BS To-Do Items]] |