2072
Comment:
|
3460
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= VIS Type B Near Term To-Do List = | = VIS Type B BS Near Term To-Do List = |
Line 3: | Line 3: |
../ToDoOld | [[../ToDoOldBS|Archived BS To-Do Items]] [[../ToDoSR|SR To-Do Items]] [[#EveryWeek |Every Week]] [[#ComingWeeks |Coming Weeks]] <<Anchor(EveryWeek)>> |
Line 10: | Line 18: |
* Get stuff from [[../WishList]] | |
Line 11: | Line 20: |
== 2017-05-15 == | <<Anchor(ComingWeeks)>> |
Line 13: | Line 22: |
== Facilities == * --(Clear spaces for PR2 bellows work and SR2 ladder installation on 5/15.)-- * --(Fix safety bar on -X side of assembly frame (move to other side of pillars and attach more securely).)-- |
== 2017-10-16 == |
Line 17: | Line 24: |
== Design/Purchasing == * Order longer threaded rods for arc weights on PI. * Design, order modifications to LBB blade springs. * Get more UHV foil. |
=== Main Assembly Sequence === * --(Borrow portable hard drive.)-- * --(Remove sticker residue and permanent marker writing on PI.)-- * --(Fix broken and unreliable connections on IP LVDTs.)-- * --(Reconfigure the stepper motor cables for Miyo-kun.)-- * Wipe any rust from around IP LVDTs. * --(Add IP LVDT gains and offsets to IP_LVDTINF filter blocks.)-- * Calibrate IP LVDT actuation against IP LVDT sensing. * --(Install damping filters for IP LVDTs.)-- * Adjust gains and debug damping for IM OSEMs and GAS LVDTs. * Modify IP LVDT damping filters to include set point. * --(Install and debug IP LVDT and geophone diagonalization matrices.)-- * --(Work with alignment team.)-- * --(Work with Mirapro on SR LBB and tank installation (Hirata-san, from Wed))-- * --(Work with Miyo-kun to get user interface for stepper motors.)-- * --(Calibrate IP FR actuation against IP LVDT sensing.)-- * SR procurement. * --(Lower LBB by 17.5 mm; suspend and rebalance after removing table KOACH filters.)-- * --(Reroute cable to eliminate need for fifth feedthrough.)-- * Set all EQ stops to TBD clearance. * Measure IP period; adjust ballast mass. * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs. * TFs. |
Line 22: | Line 48: |
=== Main Assembly === * --(Secure arc weights with M8 nuts.)-- * --(Remove PI.)-- * --(Unjam PI-SF rod.)-- * --(Remove SF cap.)-- * --(Remove blades from LBB blade units)-- and send off for rework. * Install remaining cable clamps on PI. * --(Remove one Cu damper segment from SF cap and reconfigure remaining two to be symmetrical.)-- * Decide pattern of SF damper ring magnets (72 pieces in 2/3 of the original ring). * Install magnets on SF damper ring. * Lift PI and hang LBB damper ring. * Crane PI back in. * Install rod, this time with hex cable clamp. * Re-hook SF/... section. * Install geophones. |
=== Etc === * Move stuff out of PR2 area. * Tidy/label parts. * Move safety bars from BS AF area to SR2 area. * (Put up safety bars in SR3 area.) * Close hole in floor above BS AF area. |
Line 38: | Line 55: |
=== Electronics === * Debug and calibrate SF LVDT. * Put connector on PI vertical LVDT wires per E1503600-v13 Sheet 5. * Make PI vertical/yaw stepper in-air adapter cable per E1503600-v13 Sheet 7. * Make (in-air) geophone unscrambler cables per E1503600-v13 Sheet 8. * Complete cabling of PI stuff (steppers, LVDTs, geophones) through to rack and test. * Review cable spreadsheet; send to Sato-san. |
=== Software === * --(Enter new IP matrices and do safe.snap.)-- * --(Send stepper driver info to Miyo-kun)--. * Update real-time model to number channels from #0. * Remove old OL stuff; add link to new OL stuff. * Remove unused screens. * Sort out SVN. * --(Add support for comments to SUMCON.)-- * Create SUMCON model with values commented. * --(Derive matrices for IP FRs.)-- === Design === * Finalize redesign of IP yaw adjuster. * Design better F0 FR adjuster. <<Anchor(RealBSHang)>> == Tasks Not To Forget == === Major Tasks === * (Time permitting) Try adding mass to IP. * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD. * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san). * Figure out how to make PI yaw adjustment reliable. === Minor Tasks === ==== Mechanical ==== * Put pointy-tipped screw in RM trolley for BS * Return/replace borrowed parts: * Temporary ballast mass (dog clamps) in BF. ==== Electrical ==== ==== Real-time and SUMCON models ==== * Create SUMCON models for full BS and major installation milestones. * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]). |
Line 46: | Line 90: |
== Real-time and SUMCON models == |
|
Line 52: | Line 94: |
* Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. |
VIS Type B BS Near Term To-Do List
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2017-10-16
Main Assembly Sequence
Borrow portable hard drive.
Remove sticker residue and permanent marker writing on PI.
Fix broken and unreliable connections on IP LVDTs.
Reconfigure the stepper motor cables for Miyo-kun.
- Wipe any rust from around IP LVDTs.
Add IP LVDT gains and offsets to IP_LVDTINF filter blocks.
- Calibrate IP LVDT actuation against IP LVDT sensing.
Install damping filters for IP LVDTs.
- Adjust gains and debug damping for IM OSEMs and GAS LVDTs.
- Modify IP LVDT damping filters to include set point.
Install and debug IP LVDT and geophone diagonalization matrices.
Work with alignment team.
Work with Mirapro on SR LBB and tank installation (Hirata-san, from Wed)
Work with Miyo-kun to get user interface for stepper motors.
Calibrate IP FR actuation against IP LVDT sensing.
- SR procurement.
Lower LBB by 17.5 mm; suspend and rebalance after removing table KOACH filters.
Reroute cable to eliminate need for fifth feedthrough.
- Set all EQ stops to TBD clearance.
- Measure IP period; adjust ballast mass.
- Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
- TFs.
Etc
- Move stuff out of PR2 area.
- Tidy/label parts.
- Move safety bars from BS AF area to SR2 area.
- (Put up safety bars in SR3 area.)
- Close hole in floor above BS AF area.
Software
Enter new IP matrices and do safe.snap.
Send stepper driver info to Miyo-kun.
- Update real-time model to number channels from #0.
- Remove old OL stuff; add link to new OL stuff.
- Remove unused screens.
- Sort out SVN.
Add support for comments to SUMCON.
- Create SUMCON model with values commented.
Derive matrices for IP FRs.
Design
- Finalize redesign of IP yaw adjuster.
- Design better F0 FR adjuster.
Tasks Not To Forget
Major Tasks
- (Time permitting) Try adding mass to IP.
- Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
- Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
- Figure out how to make PI yaw adjustment reliable.
Minor Tasks
Mechanical
- Put pointy-tipped screw in RM trolley for BS
- Return/replace borrowed parts:
- Temporary ballast mass (dog clamps) in BF.
Electrical
Real-time and SUMCON models
- Create SUMCON models for full BS and major installation milestones.
Create controls design description (cf LIGO-T1100378).
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.
- Design and install GAS drift compensation filters.