../ToDoOld This list has been merged into the common Type B list: [[../ToDo]].
Line 5: Line 5:
== Every Week ==
=== Facilities ===
 * Vacuum and roll floor.
 * Wipe ladders.
 * Tidy tools, parts.

== 2017-05-15 ==

== Facilities ==
 * --(Clear spaces for PR2 bellows work and SR2 ladder installation on 5/15.)--
 * --(Fix safety bar on -X side of assembly frame (move to other side of pillars and attach more securely).)--

== Design/Purchasing ==
 * Order longer threaded rods for arc weights on PI.
 * Design, order modifications to LBB blade springs.
 * Get more UHV foil.
 * Get more cable ties.
 * Get more duckboards.

=== Main Assembly ===
 * --(Secure arc weights with M8 nuts.)--
 * --(Remove PI.)--
 * --(Unjam PI-SF rod.)--
 * --(Remove SF cap.)--
 * --(Remove blades from LBB blade units)-- and send off for rework.
 * Install remaining cable clamps on PI.
 * --(Remove one Cu damper segment from SF cap and reconfigure remaining two to be symmetrical.)--
 * --(Decide pattern of SF damper ring magnets (72 pieces in 2/3 of the original ring).)--
 * --(Install magnets on SF damper ring.)--
 * Lift PI and hang LBB damper ring.
 * Crane PI back in.
 * Install rod, this time with hex cable clamp.
 * Re-hook SF/... section.
 * Install geophones.

=== Electronics ===
 * Debug and calibrate SF LVDT.
 * Debug stepper motors.
 * Put connector on PI vertical LVDT wires per E1503600-v13 Sheet 5.
 * Make PI vertical/yaw stepper in-air adapter cable per E1503600-v13 Sheet 7.
 * Make (in-air) geophone unscrambler cables per E1503600-v13 Sheet 8.
 * Complete cabling of PI stuff (steppers, LVDTs, geophones) through to rack and test.
 * Review cable spreadsheet; send to Sato-san.
 * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)

== Real-time and SUMCON models ==
 * Understand/document/debug Kokeyama-san's DIO stuff.
 * Measure LPCD and HPCD output filter response.
 * Design and install software compensation filters for LPCD and HPCD output filters.
 * Design and install GAS drift compensation filters.
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.
[[../ToDoOldBS|Archived BS To-Do Items]]

VIS Type B BS Near Term To-Do List

This list has been merged into the common Type B list: ../ToDo.

Archived BS To-Do Items

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)