= VIS Type B Near Term To-Do List = | = VIS Type B BS Near Term To-Do List = |
Line 3: | Line 3: |
../ToDoOld | This list has been merged into the common Type B list: [[../ToDo]]. |
Line 5: | Line 5: |
== Every Week == === Facilities === * Vacuum and roll floor. * Wipe ladders. * Tidy tools, parts. == 2017-05-22 == == Facilities == == Design/Purchasing == * Order longer threaded rods for arc weights on PI. * Design, order modifications to LBB blade springs. * Get more cable ties. * Get more duckboards. === Main Assembly === * --(Find geophone adapter plates.)-- * Ultrasonically clean geophone adapter plates and screws. * Install geophone adapter plates. * Get more PEEK clamp pieces from Sato-san and install. * Lift PI and hang LBB damper ring. * Crane PI back in. * Install rod, this time with hex cable clamp. * Re-hook SF/... section. * Trim SF/... section. * Install geophones. === Electronics === * Debug and calibrate SF LVDT. * Debug stepper motors. * Make two more (in-air) geophone unscrambler cables per E1503600-v13 Sheet 8. * Complete cabling of PI stuff (steppers, LVDTs, geophones) through to rack and test. * Send cable spreadsheet to Sato-san. * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark) == Real-time and SUMCON models == * Understand/document/debug Kokeyama-san's DIO stuff. * Measure LPCD and HPCD output filter response. * Design and install software compensation filters for LPCD and HPCD output filters. * Design and install GAS drift compensation filters. * Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. |
[[../ToDoOldBS|Archived BS To-Do Items]] |