Line 17: Line 17:
 * Design, order modifications to LBB blade springs.  * --(Design, order modifications to LBB blade springs.)--
Line 23: Line 23:
 * Ultrasonically clean geophone adapter plates and screws.
 * Install geophone adapter plates.
 *
Get more PEEK clamp pieces from Sato-san and install.
 *
Lift PI and hang LBB damper ring.
 *
Crane PI back in.
 *
Install rod, this time with hex cable clamp.
 *
Re-hook SF/... section.
 *
Trim SF/... section.
 * Install geophones.
 * --(Ultrasonically clean geophone adapter plates and screws.)--
 * --(Install geophone adapter plates.)--
 * --(
Get more PEEK clamp pieces from Sato-san and install.)--
 * --(
Lift PI and hang LBB damper ring.)--
 * --(
Crane PI back in.)--
 * --(
Install rod, this time with hex cable clamp.)--
 * --(
Re-hook SF/... section.)--
 * --(
Trim SF/... section.)--
 * --(Install geophones.)--
Line 34: Line 34:
 * Debug and calibrate SF LVDT.
 * Debug stepper motors.
 * Make two more (in-air) geophone unscrambler cables per E1503600-v13 Sheet 8.
 * --(Debug and calibrate SF LVDT.)--
 * --(Debug stepper motors.)--
 * --(Make two more (in-air) geophone unscrambler cables per E1503600-v13 Sheet 8.)--

VIS Type B Near Term To-Do List

../ToDoOld

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.

2017-05-22

Facilities

Design/Purchasing

  • Order longer threaded rods for arc weights on PI.
  • Design, order modifications to LBB blade springs.

  • Get more cable ties.
  • Get more duckboards.

Main Assembly

  • Find geophone adapter plates.

  • Ultrasonically clean geophone adapter plates and screws.

  • Install geophone adapter plates.

  • Get more PEEK clamp pieces from Sato-san and install.

  • Lift PI and hang LBB damper ring.

  • Crane PI back in.

  • Install rod, this time with hex cable clamp.

  • Re-hook SF/... section.

  • Trim SF/... section.

  • Install geophones.

Electronics

  • Debug and calibrate SF LVDT.

  • Debug stepper motors.

  • Make two more (in-air) geophone unscrambler cables per E1503600-v13 Sheet 8.

  • Complete cabling of PI stuff (steppers, LVDTs, geophones) through to rack and test.
  • Send cable spreadsheet to Sato-san.
  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)

Real-time and SUMCON models

  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.
  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.