= VIS Type B Near Term To-Do List = | = VIS Type B BS Near Term To-Do List = |
Line 3: | Line 3: |
../ToDoOld | [[../ToDoOldBS|Archived BS To-Do Items]] [[../ToDoSR|SR To-Do Items]] [[#EveryWeek |Every Week]] [[#ComingWeeks |Coming Weeks]] <<Anchor(EveryWeek)>> |
Line 10: | Line 18: |
* Get stuff from [[../WishList]] | |
Line 11: | Line 20: |
== 2017-05-22 == | <<Anchor(ComingWeeks)>> |
Line 13: | Line 22: |
== Facilities == | == 2017-10-30 == |
Line 15: | Line 24: |
== Design/Purchasing == * Order longer threaded rods for arc weights on PI. * --(Design, order modifications to LBB blade springs.)-- * Get more cable ties. * Get more duckboards. |
=== Main Assembly Sequence === * --(Realign OL.)-- * Cover OL with foil. * Offload IP P&Y offsets to picos. * Diagonalize OL. * Design, install angular lock servo using OL. * Calibrate IP LVDT actuation against IP LVDT sensing. * Adjust gains and debug damping for IM OSEMs and GAS LVDTs. * Modify IP LVDT damping filters to include set point. * Set all EQ stops to TBD clearance. * Measure IP period; adjust ballast mass. * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs. * TFs. |
Line 21: | Line 38: |
=== Main Assembly === * --(Find geophone adapter plates.)-- * --(Ultrasonically clean geophone adapter plates and screws.)-- * --(Install geophone adapter plates.)-- * --(Get more PEEK clamp pieces from Sato-san and install.)-- * --(Lift PI and hang LBB damper ring.)-- * --(Crane PI back in.)-- * --(Install rod, this time with hex cable clamp.)-- * --(Re-hook SF/... section.)-- * --(Trim SF/... section.)-- * --(Install geophones.)-- |
=== Etc === * Move stuff out of PR2 area. * Tidy/label parts. * Move safety bars from BS AF area to SR2 area. * Close hole in floor above BS AF area. |
Line 33: | Line 44: |
=== Electronics === * --(Debug and calibrate SF LVDT.)-- * --(Debug stepper motors.)-- * --(Make two more (in-air) geophone unscrambler cables per E1503600-v13 Sheet 8.)-- * Complete cabling of PI stuff (steppers, LVDTs, geophones) through to rack and test. * Send cable spreadsheet to Sato-san. |
=== Software === * Update real-time model to number channels from #0. * Remove old OL stuff; add link to new OL stuff. * Do better interface to IP steppers (make a wrapper for Miyo-kun's driver which includes geometry matrix). * Remove unused screens. * Sort out SVN. * Add support for comments to SUMCON. * Create SUMCON model with values commented. * Publish matrices for IP FRs. === Design === * Finalize redesign of IP yaw adjuster. * Design better F0 FR adjuster. * Design LBB ballast mass. <<Anchor(RealBSHang)>> == Tasks Not To Forget == === Major Tasks === * Wipe any rust from around IP LVDTs. * Update circuit diagram. * (Time permitting) Try adding mass to IP. * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD. * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san). * Figure out how to make PI yaw adjustment reliable. === Minor Tasks === ==== Mechanical ==== * Put pointy-tipped screw in RM trolley for BS * Return/replace borrowed parts: * Temporary ballast mass (dog clamps) in BF. ==== Electrical ==== ==== Real-time and SUMCON models ==== * Create SUMCON models for full BS and major installation milestones. * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]). |
Line 40: | Line 81: |
== Real-time and SUMCON models == |
|
Line 46: | Line 85: |
* Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. |
VIS Type B BS Near Term To-Do List
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2017-10-30
Main Assembly Sequence
Realign OL.
- Cover OL with foil.
Offload IP P&Y offsets to picos.
- Diagonalize OL.
- Design, install angular lock servo using OL.
- Calibrate IP LVDT actuation against IP LVDT sensing.
- Adjust gains and debug damping for IM OSEMs and GAS LVDTs.
- Modify IP LVDT damping filters to include set point.
- Set all EQ stops to TBD clearance.
- Measure IP period; adjust ballast mass.
- Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
- TFs.
Etc
- Move stuff out of PR2 area.
- Tidy/label parts.
- Move safety bars from BS AF area to SR2 area.
- Close hole in floor above BS AF area.
Software
- Update real-time model to number channels from #0.
- Remove old OL stuff; add link to new OL stuff.
- Do better interface to IP steppers (make a wrapper for Miyo-kun's driver which includes geometry matrix).
- Remove unused screens.
- Sort out SVN.
- Add support for comments to SUMCON.
- Create SUMCON model with values commented.
- Publish matrices for IP FRs.
Design
- Finalize redesign of IP yaw adjuster.
- Design better F0 FR adjuster.
- Design LBB ballast mass.
Tasks Not To Forget
Major Tasks
- Wipe any rust from around IP LVDTs.
- Update circuit diagram.
- (Time permitting) Try adding mass to IP.
- Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
- Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
- Figure out how to make PI yaw adjustment reliable.
Minor Tasks
Mechanical
- Put pointy-tipped screw in RM trolley for BS
- Return/replace borrowed parts:
- Temporary ballast mass (dog clamps) in BF.
Electrical
Real-time and SUMCON models
- Create SUMCON models for full BS and major installation milestones.
Create controls design description (cf LIGO-T1100378).
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.
- Design and install GAS drift compensation filters.