Differences between revisions 4 and 131 (spanning 127 versions)
Revision 4 as of 2017-03-13 08:13:34
Size: 2063
Editor: MarkBarton
Comment:
Revision 131 as of 2017-09-14 12:15:31
Size: 3754
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= VIS Type B Near Term To-Do List = = VIS Type B BS Near Term To-Do List =
Line 3: Line 3:
2017-03-13 [[../ToDoOldBS|Archived BS To-Do Items]]
Line 5: Line 5:
== Facilities (mostly full team) ==
 * Vacuum and roll floor
 * Wipe ladders
 * Tidy tools, parts
 * Find missing light lent to Kokeyama-san (Mark)
 * Mark/photograph/count peeling patches on the floor.
 * Mark/photograph/count pillars with bare concrete bases.
[[../ToDoSR|SR To-Do Items]]
Line 13: Line 7:
== Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) ==
 * Adjust orientation of SF cap
 * Adjust orientation of SF
 * Find/attach cable clamps for SF
 * Hook SF-BF rod (with hex cable clamp).
 * Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
 * Suspend BF/IRM/IM/RM/BS; re-ballast and re-trim as necessary.
 * Install new security structure stuff for BS/RM.
[[#EveryWeek |Every Week]]
Line 22: Line 9:
== Electronics (mostly Enzo, Mark) == [[#ComingWeeks |Coming Weeks]]
Line 24: Line 11:
 * Wire up BF roll/pitch picos
 * Work with Miyo-kun to get pico drivers added to BS rack and screens
 * Grab remaining cables etc per E1605111 and update document
 * Run cables from third and fourth feedthroughs to rack
 * Update E1503600 with DIO card for HPCDs, etc, etc.
 * Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
 * Send list of required in-vacuum cables to Takahashi-san
 * Debug 900 Hz noise on BF LVDT output
 * Debug excess noise on TM-H3 OSEM
<<Anchor(EveryWeek)>>

== Every Week ==
=== Facilities ===
 * Vacuum and roll floor.
 * Wipe ladders.
 * Tidy tools, parts.
 * Get stuff from [[../WishList]]

<<Anchor(ComingWeeks)>>
== 2017-09-11 ==

=== Main Assembly Sequence ===
 * Debug BF LVDT actuation.
 * --(Debug other actuation.)--
 * --(Remove F-0 rod and reinstall with hex cable clamp.)--
 * --(Route cables up past hex cable clamps.)--
 * --(Adjust SF trim mass for pitch/roll/vertical.)--
 * --(Route all SF/... cables through to the flange and test.)--
 * --(Cable all PI items through to the flange.)--
 * --(Disconnect the SS from the AF.)--
 * --(Roughly level the PI so as to make the SS vertical.)--
 * --(Unlock the IP and adjust the level of the PI and the horizontal FRs to center the IP.)--
 * Test all PI items:
  * Yaw stepper.
  * F0 LVDT sensing
  * F0 LVDT actuation
  * --(Horizontal steppers)--
  * Horizontal LVDT sensing
  * Horizontal LVDT actuation
  * --(Geophones)-- (except one cable broken: #1)
 * Lock the F0 and SF keystones and measure the resonance frequency of the BF GAS.
 * --(Lock the F0 and BF keystones and measure the resonance frequency of the SF GAS.)-- 425 mHz
 * Lock the SF and BF keystones and measure the resonance frequency of the F0 GAS.


=== In parallel, time permitting ===
 * --(Fix links to ADC_MONITOR screens.)--
 * --(Check that all Take/Restore Safe.snap buttons work.)--
 * --(Check that we still have all LBB parts (there was an issue with borrowed lock nuts).)--
 * --(Wipe LLB damper parts with ethanol.)--
 * Figure out how to tighten PI yaw return spring.
 * --(Install LBB Cu damper ring in tank (less Cu for now).)--
 * Fix #1 geophone adapter cable.
 * Fix broken pico adapter cable

== 2017-09-11 ==

=== Main Assembly Sequence ===

== Dates ==
 * BUMAX countersunk screws for LBB Cu (by 9/20)
 * SDC screws for LBB half rings: 9/15 (Fri) (have Ag-coated as backup)
 * LBB Cu segments: 9/19-20

<<Anchor(RealBSHang)>>
== Tasks Not To Forget ==
=== Major Tasks ===
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
 * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
 * Get pico drive screens fixed (Miyo-kun)
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.

=== Minor Tasks ===
==== Mechanical ====
 * Get clean bag laundered.
 * Put pointy-tipped screw in RM trolley for BS
 * Return/replace borrowed parts:
  * Lock washers for LBB dampers
  * Temporary ballast mass (dog clamps) in BF.
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

==== Electrical ====
 * Decide final in-vacuum and in-air cable routing (Enzo).
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, --(SF)--, PI-GAS, PI-H1, PI-H2, PI-H3
 * Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

==== Real-time and SUMCON models ====
 * Create SUMCON models for full BS and major installation milestones.
 * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]).
Line 34: Line 94:
 * Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

== PI Prep (mostly Hirata-san, Mark) ==
 * Inspect PI, compare to CAD and 2D drawings (Hirata, Mark)
 * Identify missing PI parts (Hirata, Mark)
 * Find and reattach repaired LVDT coil(s) (Enzo, Hirata, Mark)
 * Check length/gender of connectors against E1503600 (Enzo)

== Real-time and SUMCON models (mostly Perry, Mark) ==
 * Update SUMCON model of full BS (Perry?, Okutomi?, Mark?)
 * Do cut-down SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?)
 * Compare measured TFs to cut-down model
 * Create a proper DAC Monitor MEDM screen
 * Improve ADC Monitor MEDM screen
 * Understand/document/debug Kokeyama-san's DIO stuff.
 * Measure LPCD and HPCD output filter response.
 * Design and install software compensation filters for LPCD and HPCD output filters.
 * Design and install GAS drift compensation filters.

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

SR To-Do Items

Every Week

Coming Weeks

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-09-11

Main Assembly Sequence

  • Debug BF LVDT actuation.
  • Debug other actuation.

  • Remove F-0 rod and reinstall with hex cable clamp.

  • Route cables up past hex cable clamps.

  • Adjust SF trim mass for pitch/roll/vertical.

  • Route all SF/... cables through to the flange and test.

  • Cable all PI items through to the flange.

  • Disconnect the SS from the AF.

  • Roughly level the PI so as to make the SS vertical.

  • Unlock the IP and adjust the level of the PI and the horizontal FRs to center the IP.

  • Test all PI items:
    • Yaw stepper.
    • F0 LVDT sensing
    • F0 LVDT actuation
    • Horizontal steppers

    • Horizontal LVDT sensing
    • Horizontal LVDT actuation
    • Geophones (except one cable broken: #1)

  • Lock the F0 and SF keystones and measure the resonance frequency of the BF GAS.
  • Lock the F0 and BF keystones and measure the resonance frequency of the SF GAS. 425 mHz

  • Lock the SF and BF keystones and measure the resonance frequency of the F0 GAS.

In parallel, time permitting

  • Fix links to ADC_MONITOR screens.

  • Check that all Take/Restore Safe.snap buttons work.

  • Check that we still have all LBB parts (there was an issue with borrowed lock nuts).

  • Wipe LLB damper parts with ethanol.

  • Figure out how to tighten PI yaw return spring.
  • Install LBB Cu damper ring in tank (less Cu for now).

  • Fix #1 geophone adapter cable.
  • Fix broken pico adapter cable

2017-09-11

Main Assembly Sequence

Dates

  • BUMAX countersunk screws for LBB Cu (by 9/20)
  • SDC screws for LBB half rings: 9/15 (Fri) (have Ag-coated as backup)
  • LBB Cu segments: 9/19-20

Tasks Not To Forget

Major Tasks

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Get pico drive screens fixed (Miyo-kun)
  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Calibrate PI horizontal LVDTs.

Minor Tasks

Mechanical

  • Get clean bag laundered.
  • Put pointy-tipped screw in RM trolley for BS
  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.

Electrical

  • Decide final in-vacuum and in-air cable routing (Enzo).
  • Calibrate all LVDTs (Enzo, Mark). BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3

  • Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)