= VIS Type B Near Term To-Do List = | = VIS Type B BS Near Term To-Do List = |
Line 3: | Line 3: |
[[../ToDoOld|Archived To-Do Items]] | This list has been merged into the common Type B list: [[../ToDo]]. |
Line 5: | Line 5: |
[[../BSTestHangIssues|Issues to fix after BS Test Hang]] == Every Week == === Facilities === * Vacuum and roll floor. * Wipe ladders. * Tidy tools, parts. == 2017-05-29 == === Facilities === === Design/Purchasing === * Order longer threaded rods for arc weights on PI. * Get more cable ties. * Get another D-Sub breakout. === Main Assembly === * Reinstall blades in LBB blade units. * Do load test on LBB blade units. * Try rearranging arc weights to make room for magic wand. * === Electronics === * Route BF/... cabling up past SF to PI. * Route SF cabling up to PI. * Add Type 3 extensions to SF/... cables. * Move vacuum flanges to positions on assembly frame more convenient for next stage (accessible from second floor, one on each corner of frame). * Move in-air cabling to match flange positions. * Cable and test PI vertical LVDT. * Calibrate PI vertical LVDT. * Set yoke on PI vertical LVDT (if necessary). * Cable and test PI yaw stepper. * Cable and test PI vertical stepper. * Cable and test PI horizontal steppers. * Cable and test PI horizontal LVDTs. * Calibrate PI horizontal LVDTs. == Real-time and SUMCON models == * Check PI section of k1visbs model. * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark) * Understand/document/debug Kokeyama-san's DIO stuff. * Measure LPCD and HPCD output filter response. * Design and install software compensation filters for LPCD and HPCD output filters. * Design and install GAS drift compensation filters. * Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. |
[[../ToDoOldBS|Archived BS To-Do Items]] |