1756
Comment:
|
1799
|
Deletions are marked like this. | Additions are marked like this. |
Line 19: | Line 19: |
* Get more cable ties. | * --(Get more cable ties.)-- |
Line 23: | Line 23: |
* Reinstall blades in LBB blade units. * Do load test on LBB blade units. |
* --(Reinstall blades in LBB blade units.)-- * --(Do load test on LBB blade units.)-- |
Line 26: | Line 26: |
* | |
Line 29: | Line 28: |
* Route BF/... cabling up past SF to PI. * Route SF cabling up to PI. * Add Type 3 extensions to SF/... cables. * Move vacuum flanges to positions on assembly frame more convenient for next stage (accessible from second floor, one on each corner of frame). * Move in-air cabling to match flange positions. |
* --(Route BF/... cabling up past SF to PI.)-- * --(Route SF cabling up to PI.)-- * --(Add Type 3 extensions to SF/... cables.)-- * --(Move vacuum flanges to positions on assembly frame more convenient for next stage (accessible from second floor, one on each corner of frame).)-- * --(Move in-air cabling to match flange positions.)-- |
VIS Type B Near Term To-Do List
Issues to fix after BS Test Hang
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
2017-05-29
Facilities
Design/Purchasing
- Order longer threaded rods for arc weights on PI.
Get more cable ties.
- Get another D-Sub breakout.
Main Assembly
Reinstall blades in LBB blade units.
Do load test on LBB blade units.
- Try rearranging arc weights to make room for magic wand.
Electronics
Route BF/... cabling up past SF to PI.
Route SF cabling up to PI.
Add Type 3 extensions to SF/... cables.
Move vacuum flanges to positions on assembly frame more convenient for next stage (accessible from second floor, one on each corner of frame).
Move in-air cabling to match flange positions.
- Cable and test PI vertical LVDT.
- Calibrate PI vertical LVDT.
- Set yoke on PI vertical LVDT (if necessary).
- Cable and test PI yaw stepper.
- Cable and test PI vertical stepper.
- Cable and test PI horizontal steppers.
- Cable and test PI horizontal LVDTs.
- Calibrate PI horizontal LVDTs.
Real-time and SUMCON models
- Check PI section of k1visbs model.
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.
- Design and install GAS drift compensation filters.
- Create a proper DAC Monitor MEDM screen.
- Improve ADC Monitor MEDM screen.