1799
Comment:
|
2935
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= VIS Type B Near Term To-Do List = | = VIS Type B BS Near Term To-Do List = |
Line 3: | Line 3: |
[[../ToDoOld|Archived To-Do Items]] | [[../ToDoOldBS|Archived BS To-Do Items]] |
Line 5: | Line 5: |
[[../BSTestHangIssues|Issues to fix after BS Test Hang]] | [[../ToDoSR|SR To-Do Items]] [[#EveryWeek |Every Week]] [[#ComingWeeks |Coming Weeks]] <<Anchor(EveryWeek)>> |
Line 12: | Line 18: |
* Get stuff from [[../WishList]] | |
Line 13: | Line 20: |
== 2017-05-29 == | <<Anchor(ComingWeeks)>> |
Line 15: | Line 22: |
=== Facilities === | == 2017-10-10 == |
Line 17: | Line 24: |
=== Design/Purchasing === * Order longer threaded rods for arc weights on PI. * --(Get more cable ties.)-- * Get another D-Sub breakout. |
=== Main Assembly Sequence === * --(Account for second bubble level (might be on BF))--. * Borrow portable hard drive. * Clean up sticker residue and magic marker writing. * Remove LVDT modules; identify and replace screws. * --(Check that all in-air cables are labeled)--. * If possible, reroute cable to eliminate need for fifth feedthrough. * Debug all electronics, especially actuation. * Measure IP period; adjust ballast mass. * Calibrate all LVDTs. --(BF)--, --(SF)--, --(PI-GAS)--, PI-H1, PI-H2, PI-H3 * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs. * Set all EQ stops to TBD clearance. * Install small KOACH filters on LBB. * Remove First Contact. * Cable optical lever (Simon, Enzo) * Align optical lever (Simon) * Get ready for full TFs. |
Line 22: | Line 42: |
=== Main Assembly === * --(Reinstall blades in LBB blade units.)-- * --(Do load test on LBB blade units.)-- * Try rearranging arc weights to make room for magic wand. |
=== Etc === * Move stuff out of PR2 area. * Tidy/label parts. * Move safety bars from BS AF area to SR2 area. * (Put up safety bars in SR3 area.) * Close hole in floor above BS AF area. |
Line 27: | Line 49: |
=== Electronics === * --(Route BF/... cabling up past SF to PI.)-- * --(Route SF cabling up to PI.)-- * --(Add Type 3 extensions to SF/... cables.)-- * --(Move vacuum flanges to positions on assembly frame more convenient for next stage (accessible from second floor, one on each corner of frame).)-- * --(Move in-air cabling to match flange positions.)-- * Cable and test PI vertical LVDT. * Calibrate PI vertical LVDT. * Set yoke on PI vertical LVDT (if necessary). * Cable and test PI yaw stepper. * Cable and test PI vertical stepper. * Cable and test PI horizontal steppers. * Cable and test PI horizontal LVDTs. * Calibrate PI horizontal LVDTs. |
=== Software === * Enter new IP matrices and do safe.snap. * Send stepper driver info to Miyo-kun. * Update real-time model to number channels from #0. * Remove old OL stuff; add link to new OL stuff. * Remove unused screens. * Sort out SVN. * Add support for comments to SUMCON. * Create SUMCON model with values commented. * Derive matrices for IP FRs. |
Line 42: | Line 60: |
=== Real-time and SUMCON models === * Check PI section of k1visbs model. |
=== Design === * Finalize redesign of IP yaw adjuster. * Design better F0 FR adjuster. <<Anchor(RealBSHang)>> == Tasks Not To Forget == === Major Tasks === * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD. * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san). * Figure out how to make PI yaw adjustment reliable. === Minor Tasks === ==== Mechanical ==== * Put pointy-tipped screw in RM trolley for BS * Return/replace borrowed parts: * Temporary ballast mass (dog clamps) in BF. ==== Electrical ==== ==== Real-time and SUMCON models ==== * Create SUMCON models for full BS and major installation milestones. * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]). |
Line 49: | Line 87: |
* Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. |
VIS Type B BS Near Term To-Do List
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2017-10-10
Main Assembly Sequence
Account for second bubble level (might be on BF).
- Borrow portable hard drive.
- Clean up sticker residue and magic marker writing.
- Remove LVDT modules; identify and replace screws.
Check that all in-air cables are labeled.
- If possible, reroute cable to eliminate need for fifth feedthrough.
- Debug all electronics, especially actuation.
- Measure IP period; adjust ballast mass.
Calibrate all LVDTs. BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3
- Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
- Set all EQ stops to TBD clearance.
- Install small KOACH filters on LBB.
- Remove First Contact.
- Cable optical lever (Simon, Enzo)
- Align optical lever (Simon)
- Get ready for full TFs.
Etc
- Move stuff out of PR2 area.
- Tidy/label parts.
- Move safety bars from BS AF area to SR2 area.
- (Put up safety bars in SR3 area.)
- Close hole in floor above BS AF area.
Software
- Enter new IP matrices and do safe.snap.
- Send stepper driver info to Miyo-kun.
- Update real-time model to number channels from #0.
- Remove old OL stuff; add link to new OL stuff.
- Remove unused screens.
- Sort out SVN.
- Add support for comments to SUMCON.
- Create SUMCON model with values commented.
- Derive matrices for IP FRs.
Design
- Finalize redesign of IP yaw adjuster.
- Design better F0 FR adjuster.
Tasks Not To Forget
Major Tasks
- Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
- Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
- Figure out how to make PI yaw adjustment reliable.
Minor Tasks
Mechanical
- Put pointy-tipped screw in RM trolley for BS
- Return/replace borrowed parts:
- Temporary ballast mass (dog clamps) in BF.
Electrical
Real-time and SUMCON models
- Create SUMCON models for full BS and major installation milestones.
Create controls design description (cf LIGO-T1100378).
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.
- Design and install GAS drift compensation filters.