= VIS Type B Near Term To-Do List = = VIS Type B BS Near Term To-Do List =
Line 3: Line 3:
[[../ToDoOld|Archived To-Do Items]] [[../ToDoOldBS|Archived BS To-Do Items]]
Line 5: Line 5:
[[../BSTestHangIssues|Issues to fix after BS Test Hang]] [[#EveryWeek |Every Week]]

[[#ComingWeeks |Coming Weeks]]

[[#RealBSHang|Preparation for Real BS Hang]]

<<Anchor(EveryWeek)>>
Line 12: Line 18:
 * Get stuff from [[../WishList]]
Line 13: Line 20:
== Longer Term == <<Anchor(ComingWeeks)>>
== 2017-08-21 ==
=== Design/Documentation/Planning ===
 * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
Line 15: Line 25:
=== Design/Purchasing ===
 * Do rough mass budget for SR2/SR3/SRM.
 * Design SR assembly frame.
 * Get another D-Sub breakout (Hirata).
 * Design final SF ballast masses (Fabian).
 * Finish/post assembly drawing for LBB and LBB damper ring (Hirata).
 * Try rearranging arc weights to make room for magic wand (3D CAD or actual weights; Fabian or Hirata).
 * If needed based on previous, order longer threaded rods for arc weights on PI (Hirata).
=== Main Assembly ===
 * --(Wrap new IM bottom ballast masses (Mozumi).)--
 * --(Install new IM masses.)--
 * --(Set up optical level.)--
 * --(Adjust IM ballast mass to give desired roll/pitch/vertical.)--
 * --(Level BF.)--
 * --(Cable BF LVDT, test and calibrate.)--
 * --(Adjust top of IRM to level.)--
 * --(Install IRM side panels.)--
 * --(Install IRM OSEMs.)--
 * --(Cable IRM OSEMs)-- and test.
 * --(Adjust IRM and IRM OSEMs to get good alignment of IRM OSEMs and IM-IRM stops.)--
 * Add extra ballast mass to BF.
 * Add BF cap but don't anchor cables.
 * Cable and test BF cap picos.
 * Lift BF/IRM/IM/RM/BS and weigh.
 * Adjust BF ballast if necessary.
 * Crane in SF.
 * Hook up BF/IRM/IM/RM/BS.
 * Route cables up to SF.
 * Adjust BF ballast if necessary.
Line 24: Line 47:
=== Real-time and SUMCON models ===
 * --(Adjust OSEM ADC and DAC channel assignments to match cabling changes.)--
 * --(Check PI section of k1visbs model.)--
=== Time permitting ===
  * Lay more new in-air cabling.

<<Anchor(RealBSHang)>>
== Real BS Hang Tasks ==
=== Major Tasks ===
 * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
 * Get pico drive screens fixed (Miyo-kun)
 * --(Final ballast mass production for BF and SF (Hirata-san). )--
 * --(Design of receptacles for rods with 8 mm heads.)--
 * --(Possible rebuild of BF)--
  * --(Set up build/test stand for filters.)--
  * --(Get filter test weights.)--
  * --(Find spare BF blade(s).)--
 * Reclean stuff:
  * PI (remove Kapton tape etc, etc).
  * LLB damper stuff, especially Cu segments.
 * Calibrate SF LVDT.
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.

=== Minor Tasks ===
==== Mechanical ====
 * Get clean bag laundered.
 * Put pointy-tipped screw in RM trolley for BS
 * --(Swap out temporary ballast mass in BF)--, SF.
 * Return/replace borrowed parts:
  * Lock washers for LBB dampers
  * Temporary ballast mass (dog clamps) in BF.
  * --(Wide-mouth OSEMs from RM to Akutsu-san)--
 * --(Adjust height of crossbars below BF.)--
 * --(If possible, fix galled pole in BF level of EQ stop.)--
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
 * --(Check inside SF for lost ruler.)--
 * Tighten PI yaw return spring.
 * Get Cu O-rings for feedthroughs.

==== Electrical ====
 * Decide final in-vacuum and in-air cable routing (Enzo).
 * Calibrate all LVDTs (Enzo, Mark). --(BF)--, SF, PI-GAS, PI-H1, PI-H2, PI-H3
 * --(Remove cling wrap in BF and install vacuum-compatible heat shrink.)--
 * Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter heat shrink or smaller pins).
 * Rewire PI horizontal steppers with vacuum-compatible cable.
 * Adjust yoke on BF to put top of secondary at 3.5 mm above top of baseplate (or to give ≈0 counts at nominal height).
 * Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).
 * Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

==== Real-time and SUMCON models ====
 * Create SUMCON models for full BS and major installation milestones.
 * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]).
Line 34: Line 105:

== 2017-06-12 ==

=== Facilities ===

=== Main Assembly ===
 * Unlock BF keystone and try running BF fishing rod to fix sag problem.
 * --(Check pitch/roll of SF and adjust trim as required.)--
 * --(Prepare LBB.)--
  * --(Attach LBB outriggers and rod receptacles.)--
 * --(Prepare LBB Cu ring.)--
  * --(Remove from tank, fix incompletely threaded holes, reinstall in tank.)--
  * --(Lay down spacers to protect magnets (in next step).)--
 * --(Prepare LBB magnet ring.)--
  * --(Disassemble.)--
  * --(Pass pieces into tank.)--
  * --(Reassemble on top of Cu ring.)--
 * --(Install LBB damper.)--
  * --(Bind LBB damper rings together with slings.)--
  * --(Remove vacuum tank lid and ring.)--
  * --(Crane rings up to install height, hook LBB magnet ring and support LBB Cu ring by TBD method.)--
 * Crane suspension into tank.
 * Hook LBB Cu ring.
 * Hook LBB.
 * Crane vacuum tank lid+ring black on.
 * Remove vacuum tank lid (only).
 * Remove port covers where feedthroughs will go, move feedthroughs from assembly frame and install on vacuum tank ring.
 * Reconnect in-air cables.

=== Electronics ===
 * Cabling:
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * --(Cable and test PI yaw stepper.)--
 * --(Cable and test PI vertical stepper.)--
 * --(Cable and test PI horizontal steppers.)--
 * --(Cable and test PI horizontal LVDTs.)--
 * Calibrate PI horizontal LVDTs.
 * --(Finalize OSEM cable lengths and update D1503600, E1503091 and Sato-san's spreadsheet.)--
 * --(Recount cables in box and in test hang, and update Sato-san's spreadsheet.)--
 * --(Cable and test PI vertical LVDT.)--
 * --(Debug/fix PI vertical LVDTs #0 and #2.)--
 * --(Debug/fix geophone #1.)--
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * --(Cable and test PI horizontal LVDTs.)--
 * Calibrate PI horizontal LVDTs.

VIS Type B BS Near Term To-Do List

Archived BS To-Do Items

Every Week

Coming Weeks

Preparation for Real BS Hang

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-08-21

Design/Documentation/Planning

  • Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.

Main Assembly

  • Wrap new IM bottom ballast masses (Mozumi).

  • Install new IM masses.

  • Set up optical level.

  • Adjust IM ballast mass to give desired roll/pitch/vertical.

  • Level BF.

  • Cable BF LVDT, test and calibrate.

  • Adjust top of IRM to level.

  • Install IRM side panels.

  • Install IRM OSEMs.

  • Cable IRM OSEMs and test.

  • Adjust IRM and IRM OSEMs to get good alignment of IRM OSEMs and IM-IRM stops.

  • Add extra ballast mass to BF.
  • Add BF cap but don't anchor cables.
  • Cable and test BF cap picos.
  • Lift BF/IRM/IM/RM/BS and weigh.
  • Adjust BF ballast if necessary.
  • Crane in SF.
  • Hook up BF/IRM/IM/RM/BS.
  • Route cables up to SF.
  • Adjust BF ballast if necessary.

Time permitting

  • Lay more new in-air cabling.

Real BS Hang Tasks

Major Tasks

  • Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
  • Get pico drive screens fixed (Miyo-kun)
  • Final ballast mass production for BF and SF (Hirata-san).

  • Design of receptacles for rods with 8 mm heads.

  • Possible rebuild of BF

    • Set up build/test stand for filters.

    • Get filter test weights.

    • Find spare BF blade(s).

  • Reclean stuff:
    • PI (remove Kapton tape etc, etc).
    • LLB damper stuff, especially Cu segments.
  • Calibrate SF LVDT.
  • Calibrate PI vertical LVDT.
  • Set yoke on PI vertical LVDT (if necessary).
  • Calibrate PI horizontal LVDTs.

Minor Tasks

Mechanical

  • Get clean bag laundered.
  • Put pointy-tipped screw in RM trolley for BS
  • Swap out temporary ballast mass in BF, SF.

  • Return/replace borrowed parts:
    • Lock washers for LBB dampers
    • Temporary ballast mass (dog clamps) in BF.
    • Wide-mouth OSEMs from RM to Akutsu-san

  • Adjust height of crossbars below BF.

  • If possible, fix galled pole in BF level of EQ stop.

  • Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
  • Check inside SF for lost ruler.

  • Tighten PI yaw return spring.
  • Get Cu O-rings for feedthroughs.

Electrical

  • Decide final in-vacuum and in-air cable routing (Enzo).
  • Calibrate all LVDTs (Enzo, Mark). BF, SF, PI-GAS, PI-H1, PI-H2, PI-H3

  • Remove cling wrap in BF and install vacuum-compatible heat shrink.

  • Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter heat shrink or smaller pins).
  • Rewire PI horizontal steppers with vacuum-compatible cable.
  • Adjust yoke on BF to put top of secondary at 3.5 mm above top of baseplate (or to give ≈0 counts at nominal height).
  • Adjust yoke on SF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).
  • Adjust yoke on PI to put top of secondary at TBD mm above top of baseplate (or to give ≈0 counts at nominal height).

Real-time and SUMCON models

  • Create SUMCON models for full BS and major installation milestones.
  • Create controls design description (cf LIGO-T1100378).

  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.
  • Design and install GAS drift compensation filters.
  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.