3238
Comment:
|
3533
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= VIS Type B Near Term To-Do List = | = VIS Type B BS Near Term To-Do List = |
Line 3: | Line 3: |
[[../ToDoOld|Archived To-Do Items]] | [[../ToDoOldBS|Archived BS To-Do Items]] |
Line 5: | Line 5: |
[[../BSTestHangIssues|Issues to fix after BS Test Hang]] | [[../ToDoSR|SR To-Do Items]] [[#EveryWeek |Every Week]] [[#ComingWeeks |Coming Weeks]] <<Anchor(EveryWeek)>> |
Line 12: | Line 18: |
* Get stuff from [[../WishList]] | |
Line 13: | Line 20: |
== Longer Term == | <<Anchor(ComingWeeks)>> |
Line 15: | Line 22: |
=== Design/Purchasing === * Do rough mass budget for SR2/SR3/SRM. * Design SR assembly frame. * Get another D-Sub breakout (Hirata). * Design final SF ballast masses (Fabian). * Finish/post assembly drawing for LBB and LBB damper ring (Hirata). * Try rearranging arc weights to make room for magic wand (3D CAD or actual weights; Fabian or Hirata). * If needed based on previous, order longer threaded rods for arc weights on PI (Hirata). |
== 2017-10-16 == |
Line 24: | Line 24: |
=== Real-time and SUMCON models === * --(Adjust OSEM ADC and DAC channel assignments to match cabling changes.)-- * --(Check PI section of k1visbs model.)-- |
=== Main Assembly Sequence === * --(Borrow portable hard drive.)-- * Remove sticker residue --(and permanent marker writing on PI.)-- * --(Fix broken and unreliable connections on IP LVDTs.)-- * --(Reconfigure the stepper motor cables for Miyo-kun.)-- * Wipe any rust from around IP LVDTs. * (If Enzo thinks it necessary and there's time) adjust IP LVDT mechanical offsets to maximize usable range and recalibrate. * Add IP LVDT gains and offsets to IP_LVDTINF filter blocks. * Calibrate IP LVDT actuation against IP LVDT sensing. * Install damping filters for IP LVDTs. * Adjust gains and debug damping for IM OSEMs and GAS LVDTs. * Modify IP LVDT damping filters to include set point. * Install and debug IP LVDT and geophone diagonalization matrices. * (Time permitting) Try adding mass to IP. * Work with alignment team. * Work with Mirapro on SR LBB and tank installation (Hirata-san, from Wed) * Work with Miyo-kun to get user interface for stepper motors. * Calibrate IP FR actuation against IP LVDT sensing. * SR procurement. * Lower LBB by 17.5 mm; suspend and rebalance after removing table KOACH filters. * --(Reroute cable to eliminate need for fifth feedthrough.)-- * Set all EQ stops to TBD clearance. * Measure IP period; adjust ballast mass. * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs. * TFs. === Etc === * Move stuff out of PR2 area. * Tidy/label parts. * Move safety bars from BS AF area to SR2 area. * (Put up safety bars in SR3 area.) * Close hole in floor above BS AF area. === Software === * --(Enter new IP matrices and do safe.snap.)-- * --(Send stepper driver info to Miyo-kun)--. * Update real-time model to number channels from #0. * Remove old OL stuff; add link to new OL stuff. * Remove unused screens. * Sort out SVN. * --(Add support for comments to SUMCON.)-- * Create SUMCON model with values commented. * Derive matrices for IP FRs. === Design === * Finalize redesign of IP yaw adjuster. * Design better F0 FR adjuster. <<Anchor(RealBSHang)>> == Tasks Not To Forget == === Major Tasks === * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD. * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san). * Figure out how to make PI yaw adjustment reliable. === Minor Tasks === ==== Mechanical ==== * Put pointy-tipped screw in RM trolley for BS * Return/replace borrowed parts: * Temporary ballast mass (dog clamps) in BF. ==== Electrical ==== ==== Real-time and SUMCON models ==== * Create SUMCON models for full BS and major installation milestones. * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]). |
Line 32: | Line 95: |
* Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. == 2017-06-12 == === Facilities === === Main Assembly === * Unlock BF keystone and try running BF fishing rod to fix sag problem. * --(Check pitch/roll of SF and adjust trim as required.)-- * --(Prepare LBB.)-- * --(Attach LBB outriggers and rod receptacles.)-- * --(Prepare LBB Cu ring.)-- * --(Remove from tank, fix incompletely threaded holes, reinstall in tank.)-- * --(Lay down spacers to protect magnets (in next step).)-- * --(Prepare LBB magnet ring.)-- * --(Disassemble.)-- * --(Pass pieces into tank.)-- * --(Reassemble on top of Cu ring.)-- * --(Install LBB damper.)-- * --(Bind LBB damper rings together with slings.)-- * --(Remove vacuum tank lid and ring.)-- * --(Crane rings up to install height, hook LBB magnet ring and support LBB Cu ring by TBD method.)-- * Crane suspension into tank. * Hook LBB Cu ring. * Hook LBB. * Crane vacuum tank lid+ring black on. * Remove vacuum tank lid (only). * Remove port covers where feedthroughs will go, move feedthroughs from assembly frame and install on vacuum tank ring. * Reconnect in-air cables. === Electronics === * Cabling: * Calibrate PI vertical LVDT. * Set yoke on PI vertical LVDT (if necessary). * --(Cable and test PI yaw stepper.)-- * --(Cable and test PI vertical stepper.)-- * --(Cable and test PI horizontal steppers.)-- * --(Cable and test PI horizontal LVDTs.)-- * Calibrate PI horizontal LVDTs. * --(Finalize OSEM cable lengths and update D1503600, E1503091 and Sato-san's spreadsheet.)-- * --(Recount cables in box and in test hang, and update Sato-san's spreadsheet.)-- * --(Cable and test PI vertical LVDT.)-- * --(Debug/fix PI vertical LVDTs #0 and #2.)-- * --(Debug/fix geophone #1.)-- * Calibrate PI vertical LVDT. * Set yoke on PI vertical LVDT (if necessary). * --(Cable and test PI horizontal LVDTs.)-- * Calibrate PI horizontal LVDTs. |
VIS Type B BS Near Term To-Do List
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2017-10-16
Main Assembly Sequence
Borrow portable hard drive.
Remove sticker residue and permanent marker writing on PI.
Fix broken and unreliable connections on IP LVDTs.
Reconfigure the stepper motor cables for Miyo-kun.
- Wipe any rust from around IP LVDTs.
- (If Enzo thinks it necessary and there's time) adjust IP LVDT mechanical offsets to maximize usable range and recalibrate.
- Add IP LVDT gains and offsets to IP_LVDTINF filter blocks.
- Calibrate IP LVDT actuation against IP LVDT sensing.
- Install damping filters for IP LVDTs.
- Adjust gains and debug damping for IM OSEMs and GAS LVDTs.
- Modify IP LVDT damping filters to include set point.
- Install and debug IP LVDT and geophone diagonalization matrices.
- (Time permitting) Try adding mass to IP.
- Work with alignment team.
- Work with Mirapro on SR LBB and tank installation (Hirata-san, from Wed)
- Work with Miyo-kun to get user interface for stepper motors.
- Calibrate IP FR actuation against IP LVDT sensing.
- SR procurement.
- Lower LBB by 17.5 mm; suspend and rebalance after removing table KOACH filters.
Reroute cable to eliminate need for fifth feedthrough.
- Set all EQ stops to TBD clearance.
- Measure IP period; adjust ballast mass.
- Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
- TFs.
Etc
- Move stuff out of PR2 area.
- Tidy/label parts.
- Move safety bars from BS AF area to SR2 area.
- (Put up safety bars in SR3 area.)
- Close hole in floor above BS AF area.
Software
Enter new IP matrices and do safe.snap.
Send stepper driver info to Miyo-kun.
- Update real-time model to number channels from #0.
- Remove old OL stuff; add link to new OL stuff.
- Remove unused screens.
- Sort out SVN.
Add support for comments to SUMCON.
- Create SUMCON model with values commented.
- Derive matrices for IP FRs.
Design
- Finalize redesign of IP yaw adjuster.
- Design better F0 FR adjuster.
Tasks Not To Forget
Major Tasks
- Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
- Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
- Figure out how to make PI yaw adjustment reliable.
Minor Tasks
Mechanical
- Put pointy-tipped screw in RM trolley for BS
- Return/replace borrowed parts:
- Temporary ballast mass (dog clamps) in BF.
Electrical
Real-time and SUMCON models
- Create SUMCON models for full BS and major installation milestones.
Create controls design description (cf LIGO-T1100378).
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.
- Design and install GAS drift compensation filters.