Line 5: | Line 5: |
[[../BSTestHangIssues|Issues to fix after BS Test Hang]] | [[../ToDoSR|SR To-Do Items]] [[#EveryWeek |Every Week]] [[#ComingWeeks |Coming Weeks]] <<Anchor(EveryWeek)>> |
Line 12: | Line 18: |
* Get stuff from [[../WishList]] | |
Line 13: | Line 20: |
== Longer Term == | <<Anchor(ComingWeeks)>> |
Line 15: | Line 22: |
=== Design/Purchasing === * Do rough mass budget for SR2/SR3/SRM. * Design SR assembly frame. * Get another D-Sub breakout (Hirata). * Design final SF ballast masses (Fabian). * Finish/post assembly drawing for LBB and LBB damper ring (Hirata). * Try rearranging arc weights to make room for magic wand (3D CAD or actual weights; Fabian or Hirata). * If needed based on previous, order longer threaded rods for arc weights on PI (Hirata). |
== ASAP == * Get picomotor drivers back on line. * Debug BS BIO connections, especially PI IP. |
Line 24: | Line 26: |
=== Real-time and SUMCON models === * --(Adjust OSEM ADC and DAC channel assignments to match cabling changes.)-- * --(Check PI section of k1visbs model.)-- |
=== Main Assembly Sequence === * Necessary for phase-I★★★ * --(Modify IP LVDT damping filters to include set point.)-- * --(TFs.)-- * '''''EXCHANGE YAW/VERT FRs at F0''''' * Necessary for phase-II★★ * Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553) * Design PI Sensor blending filter. * Re-calibrate F0 GAS LVDT * Tune the LVDT sensitivity * Measure IP period; adjust ballast mass. * At some point (remotely)★ * Improve OL offloading. * Improve GAS offloading. * Spectral analysis of Oplev. * Design, install angular lock servo using OL. (Almost done for phase-I) * Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I) * Subtract DC level of Geophones. * Spectra analysis of PI sensors (PI LVDTs and Geophones). * Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs. * Set all EQ stops to TBD clearance. * Modify the model for IP coil driver control === Documentation and Operation Manual === * Add useful info from Enzo's notebook to BSData. <<Anchor(RealBSHang)>> == Tasks Not To Forget == === Major Tasks === * Move safety bars from BS AF area to SR2 area. * Close hole in floor above BS AF area. * Update circuit diagram. * (Time permitting) Try adding mass to IP. * Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD. * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san). * Figure out how to make PI yaw adjustment reliable. === Minor Tasks === ==== Mechanical ==== * Put pointy-tipped screw in RM trolley for BS * Return/replace borrowed parts: * Temporary ballast mass (dog clamps) in BF. <<Anchor(elec)>> ==== Electrical ==== * Update BS Circuit diagram, D1503600 * Make generic for BS+SRx??? No, there are some differences. Still we need to summarize. * --(Note removal of LED/PD on TM OSEMs.)-- * Include information on assignment of channels to feedthrough positions. * Reflect gender-changers and non-flipping feedthrough adapters. * Reflect actual cable lengths. * Include LVDT pin size (1 mm). * Include Stepper pin size (1.6 mm). * --(Undo renumbering of IP items.)-- * --(Page 10: "DIO Card # 0" should be "DIO Card # 1")-- * --(Include OutConfigBoards on OL page (Sheet 18).)-- ==== Real-time and SUMCON models ==== * Create SUMCON models for full BS and major installation milestones. * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]). |
Line 31: | Line 92: |
* Design and install GAS drift compensation filters. * Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. == 2017-06-12 == === Facilities === === Main Assembly === * Unlock BF keystone and try running BF fishing rod to fix sag problem. * --(Check pitch/roll of SF and adjust trim as required.)-- * --(Prepare LBB.)-- * --(Attach LBB outriggers and rod receptacles.)-- * --(Prepare LBB Cu ring.)-- * --(Remove from tank, fix incompletely threaded holes, reinstall in tank.)-- * --(Lay down spacers to protect magnets (in next step).)-- * --(Prepare LBB magnet ring.)-- * --(Disassemble.)-- * --(Pass pieces into tank.)-- * --(Reassemble on top of Cu ring.)-- * --(Install LBB damper.)-- * --(Bind LBB damper rings together with slings.)-- * --(Remove vacuum tank lid and ring.)-- * --(Crane rings up to install height, hook LBB magnet ring and support LBB Cu ring by TBD method.)-- * Crane suspension into tank. * Hook LBB Cu ring. * Hook LBB. * Crane vacuum tank lid+ring black on. * Remove vacuum tank lid (only). * Remove port covers where feedthroughs will go, move feedthroughs from assembly frame and install on vacuum tank ring. * Reconnect in-air cables. === Electronics === * Cabling: * Calibrate PI vertical LVDT. * Set yoke on PI vertical LVDT (if necessary). * --(Cable and test PI yaw stepper.)-- * --(Cable and test PI vertical stepper.)-- * --(Cable and test PI horizontal steppers.)-- * --(Cable and test PI horizontal LVDTs.)-- * Calibrate PI horizontal LVDTs. * --(Finalize OSEM cable lengths and update D1503600, E1503091 and Sato-san's spreadsheet.)-- * --(Recount cables in box and in test hang, and update Sato-san's spreadsheet.)-- * --(Cable and test PI vertical LVDT.)-- * --(Debug/fix PI vertical LVDTs #0 and #2.)-- * --(Debug/fix geophone #1.)-- * Calibrate PI vertical LVDT. * Set yoke on PI vertical LVDT (if necessary). * --(Cable and test PI horizontal LVDTs.)-- * Calibrate PI horizontal LVDTs. |
VIS Type B BS Near Term To-Do List
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
ASAP
- Get picomotor drivers back on line.
- Debug BS BIO connections, especially PI IP.
Main Assembly Sequence
- Necessary for phase-I★★★
Modify IP LVDT damping filters to include set point.
TFs.
EXCHANGE YAW/VERT FRs at F0
- Necessary for phase-II★★
Calibrate IP LVDT actuation against IP LVDT sensing. (Klog 3553? http://klog.icrr.u-tokyo.ac.jp/osl/?r=3553)
- Design PI Sensor blending filter.
- Re-calibrate F0 GAS LVDT
- Tune the LVDT sensitivity
- Measure IP period; adjust ballast mass.
- At some point (remotely)★
- Improve OL offloading.
- Improve GAS offloading.
- Spectral analysis of Oplev.
- Design, install angular lock servo using OL. (Almost done for phase-I)
- Adjust gains and debug damping for IM OSEMs and GAS LVDTs. (Almost done for phase-I)
- Subtract DC level of Geophones.
- Spectra analysis of PI sensors (PI LVDTs and Geophones).
- Calibrate IP LVDT sensing against IP LVDT actuation, IP FRs.
- Set all EQ stops to TBD clearance.
- Modify the model for IP coil driver control
Documentation and Operation Manual
- Add useful info from Enzo's notebook to BSData.
Tasks Not To Forget
Major Tasks
- Move safety bars from BS AF area to SR2 area.
- Close hole in floor above BS AF area.
- Update circuit diagram.
- (Time permitting) Try adding mass to IP.
- Update BS Install Procedure with screenshots from new on-assembly-frame 3D CAD.
- Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
- Figure out how to make PI yaw adjustment reliable.
Minor Tasks
Mechanical
- Put pointy-tipped screw in RM trolley for BS
- Return/replace borrowed parts:
- Temporary ballast mass (dog clamps) in BF.
Electrical
- Update BS Circuit diagram, D1503600
- Make generic for BS+SRx??? No, there are some differences. Still we need to summarize.
Note removal of LED/PD on TM OSEMs.
- Include information on assignment of channels to feedthrough positions.
- Reflect gender-changers and non-flipping feedthrough adapters.
- Reflect actual cable lengths.
- Include LVDT pin size (1 mm).
- Include Stepper pin size (1.6 mm).
Undo renumbering of IP items.
Page 10: "DIO Card # 0" should be "DIO Card # 1"
Include OutConfigBoards on OL page (Sheet 18).
Real-time and SUMCON models
- Create SUMCON models for full BS and major installation milestones.
Create controls design description (cf LIGO-T1100378).
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.