 * Mark/photograph/count peeling patches on the floor. 
 * Mark/photograph/count pillars with bare concrete bases.
 * ''Mark/photograph/count peeling patches on the floor.''
 * ''Mark/photograph/count pillars with bare concrete bases.''
Line 14: Line 14:
 * Weigh SF.
 * Adjust orientation of SF cap.
 * Adjust orientation of SF.
 * Find/attach cable clamps for SF 
 * ''Weigh SF.''
 * ''Adjust orientation of SF cap.''
 * ''Adjust orientation of SF.''
 * ''Find/attach cable clamps for SF.''

VIS Type B Near Term To-Do List

2017-03-13

Facilities (mostly full team)

  • Vacuum and roll floor
  • Wipe ladders
  • Tidy tools, parts
  • Find missing light lent to Kokeyama-san (Mark)
  • Mark/photograph/count peeling patches on the floor.

  • Mark/photograph/count pillars with bare concrete bases.

Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)

  • Weigh SF.

  • Adjust orientation of SF cap.

  • Adjust orientation of SF.

  • Find/attach cable clamps for SF.

  • Hook SF-BF rod (with hex cable clamp).
  • Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
  • Suspend BF/IRM/IM/RM/BS; re-ballast and re-trim as necessary.
  • Confirm weight of BF/IRM/IM/RM/BS; complete final ballast mass design.
  • Install new security structure stuff for BS/RM.

Electronics (mostly Enzo, Mark)

  • Add retaining screws to cables at feedthroughs.

  • Wire up BF roll/pitch picos
  • Work with Miyo-kun to get pico drivers added to BS rack and screens
  • Grab remaining cables etc per E1605111 and update document
  • Run cables from third and fourth feedthroughs to rack
  • Update E1503600 with DIO card for HPCDs, etc, etc.
  • Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
  • Send list of required in-vacuum cables to Takahashi-san
  • Debug 900 Hz noise on BF LVDT output
  • Debug excess noise on TM-H3 OSEM
  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

PI Prep (mostly Hirata-san, Mark)

  • Inspect PI, compare to CAD and 2D drawings (Hirata, Mark)
  • Identify missing PI parts (Hirata, Mark)
  • Find and reattach repaired LVDT coil(s) (Enzo, Hirata, Mark)
  • Check length/gender of connectors against E1503600 (Enzo)

Real-time and SUMCON models (mostly Perry, Mark)

  • Update SUMCON model of full BS (Perry?, Okutomi?, Mark?)
  • Do cut-down SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?)
  • Compare measured TFs to cut-down model
  • Create a proper DAC Monitor MEDM screen
  • Improve ADC Monitor MEDM screen