2017-03-13 2017-03-21
Line 6: Line 6:
 * Vacuum and roll floor
 * Wipe ladders
 * Tidy tools, parts
 * Find missing light lent to Kokeyama-san (Mark)
 * ''Mark/photograph/count peeling patches on the floor.''
 * ''Mark/photograph/count pillars with bare concrete bases.''
 * Vacuum and roll floor.
 * Wipe ladders.
 * Tidy tools, parts.
Line 14: Line 11:
 * ''Weigh SF.''
 * ''Adjust orientation of SF cap.''
 * ''Adjust orientation of SF.''
 * ''Find/attach cable clamps for SF.''
 * Hook SF-BF rod (with hex cable clamp).
 * Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
 * Suspend BF/IRM/IM/RM/BS; re-ballast and re-trim as necessary.
 * Confirm weight of BF/IRM/IM/RM/BS; complete final ballast mass design.
 * Install new security structure stuff for BS/RM.
 * Reroute in-vacuum cables up to SF level; remove 40-cm extensions if possible; add in-vacuum extension cables if necessary.
Line 25: Line 14:
 * ''Add retaining screws to cables at feedthroughs.''  * Make more anti-feedthrough adapters.
 * Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
 * Run final 10-m section of cables from third and fourth feedthroughs to rack.
Line 27: Line 18:
 * Wire up SF LVDT.
 * Wire up SF fishing rod stepper.
Line 29: Line 22:
 * Run cables from third and fourth feedthroughs to rack
Line 33: Line 25:
 * Debug 900 Hz noise on BF LVDT output
 * Debug excess noise on TM-H3 OSEM
Line 42: Line 32:
 * Find and install fishing rod.
 * Remove and pack away the accelerometers.
 * Find table, weights, etc for use with LBB blade bending jigs.
 * Install LLB blades.
 * Install LLB modules.
Line 45: Line 40:
 * Update SUMCON model of full BS (Perry?, Okutomi?, Mark?)
 * Do cut-down
SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?)
 * Compare measured TFs to cut-down model
 * Create a proper DAC Monitor MEDM screen
 * Improve ADC Monitor MEDM screen
 * Get Perry (and Enzo) set up with SUMCON.
 * Update
SUMCON model of full BS.
 * Do cut-down SUMCON model of
just payload hanging from fixed BS.
 * Compare measured TFs to cut-down model(s).
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.

VIS Type B Near Term To-Do List

2017-03-21

Facilities (mostly full team)

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.

Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)

  • Reroute in-vacuum cables up to SF level; remove 40-cm extensions if possible; add in-vacuum extension cables if necessary.

Electronics (mostly Enzo, Mark)

  • Make more anti-feedthrough adapters.
  • Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
  • Run final 10-m section of cables from third and fourth feedthroughs to rack.
  • Wire up BF roll/pitch picos
  • Wire up SF LVDT.
  • Wire up SF fishing rod stepper.
  • Work with Miyo-kun to get pico drivers added to BS rack and screens
  • Grab remaining cables etc per E1605111 and update document
  • Update E1503600 with DIO card for HPCDs, etc, etc.
  • Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
  • Send list of required in-vacuum cables to Takahashi-san
  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
  • Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

PI Prep (mostly Hirata-san, Mark)

  • Inspect PI, compare to CAD and 2D drawings (Hirata, Mark)
  • Identify missing PI parts (Hirata, Mark)
  • Find and reattach repaired LVDT coil(s) (Enzo, Hirata, Mark)
  • Find and install fishing rod.
  • Remove and pack away the accelerometers.
  • Find table, weights, etc for use with LBB blade bending jigs.
  • Install LLB blades.
  • Install LLB modules.
  • Check length/gender of connectors against E1503600 (Enzo)

Real-time and SUMCON models (mostly Perry, Mark)

  • Get Perry (and Enzo) set up with SUMCON.
  • Update SUMCON model of full BS.
  • Do cut-down SUMCON model of just payload hanging from fixed BS.
  • Compare measured TFs to cut-down model(s).
  • Create a proper DAC Monitor MEDM screen.
  • Improve ADC Monitor MEDM screen.