= VIS Type B Near Term To-Do List = = VIS Type B BS Near Term To-Do List =
Line 3: Line 3:
2017-03-13 This list has been merged into the common Type B list: [[../ToDo]].
Line 5: Line 5:
== Facilities (mostly full team) ==
 * Vacuum and roll floor
 * Wipe ladders
 * Tidy tools, parts
 * Find missing light lent to Kokeyama-san (Mark)
 * ''Mark/photograph/count peeling patches on the floor.''
 * ''Mark/photograph/count pillars with bare concrete bases.''

== Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) ==
 * ''Weigh SF.''
 * ''Adjust orientation of SF cap.''
 * ''Adjust orientation of SF.''
 * ''Find/attach cable clamps for SF.''
 * Hook SF-BF rod (with hex cable clamp).
 * Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
 * Suspend BF/IRM/IM/RM/BS; re-ballast and re-trim as necessary.
 * Confirm weight of BF/IRM/IM/RM/BS; complete final ballast mass design.
 * Install new security structure stuff for BS/RM.

== Electronics (mostly Enzo, Mark) ==
 * ''Add retaining screws to cables at feedthroughs.''
 * Wire up BF roll/pitch picos
 * Work with Miyo-kun to get pico drivers added to BS rack and screens
 * Grab remaining cables etc per E1605111 and update document
 * Run cables from third and fourth feedthroughs to rack
 * Update E1503600 with DIO card for HPCDs, etc, etc.
 * Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
 * Send list of required in-vacuum cables to Takahashi-san
 * Debug 900 Hz noise on BF LVDT output
 * Debug excess noise on TM-H3 OSEM
 * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
 * Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)

== PI Prep (mostly Hirata-san, Mark) ==
 * Inspect PI, compare to CAD and 2D drawings (Hirata, Mark)
 * Identify missing PI parts (Hirata, Mark)
 * Find and reattach repaired LVDT coil(s) (Enzo, Hirata, Mark)
 * Check length/gender of connectors against E1503600 (Enzo)

== Real-time and SUMCON models (mostly Perry, Mark) ==
 * Update SUMCON model of full BS (Perry?, Okutomi?, Mark?)
 * Do cut-down SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?)
 * Compare measured TFs to cut-down model
 * Create a proper DAC Monitor MEDM screen
 * Improve ADC Monitor MEDM screen
[[../ToDoOldBS|Archived BS To-Do Items]]

VIS Type B BS Near Term To-Do List

This list has been merged into the common Type B list: ../ToDo.

Archived BS To-Do Items

KAGRA/Subgroups/VIS/TypeB/ToDoBS (last edited 2019-01-04 15:21:23 by MarkBarton)