* Vacuum and roll floor * Wipe ladders * Tidy tools, parts * Find missing light lent to Kokeyama-san (Mark) |
* ''Vacuum and roll floor.'' * ''Wipe ladders.'' * ''Tidy tools, parts.'' * ''Find missing light lent to Kokeyama-san.'' |
Line 15: | Line 15: |
* ''Crane in SF.'' | |
Line 18: | Line 19: |
* Hook SF-BF rod (with hex cable clamp). | * ''Hook SF-BF rod (with hex cable clamp).'' |
Line 21: | Line 22: |
* Confirm weight of BF/IRM/IM/RM/BS; complete final ballast mass design. * Install new security structure stuff for BS/RM. |
* ''Confirm weight of BF/IRM/IM/RM/BS.'' * ''Complete final ballast mass design.'' * ''Install new security structure stuff for BS/RM.'' * ''Install L-brackets under SF.'' |
Line 33: | Line 36: |
* Debug 900 Hz noise on BF LVDT output * Debug excess noise on TM-H3 OSEM |
* ''Debug 900 Hz noise on BF LVDT output.'' * ''Debug excess noise on TM-H3 OSEM.'' |
VIS Type B Near Term To-Do List
2017-03-13
Facilities (mostly full team)
Vacuum and roll floor.
Wipe ladders.
Tidy tools, parts.
Find missing light lent to Kokeyama-san.
Mark/photograph/count peeling patches on the floor.
Mark/photograph/count pillars with bare concrete bases.
Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)
Weigh SF.
Crane in SF.
Adjust orientation of SF cap.
Adjust orientation of SF.
Find/attach cable clamps for SF.
Hook SF-BF rod (with hex cable clamp).
- Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
- Suspend BF/IRM/IM/RM/BS; re-ballast and re-trim as necessary.
Confirm weight of BF/IRM/IM/RM/BS.
Complete final ballast mass design.
Install new security structure stuff for BS/RM.
Install L-brackets under SF.
Electronics (mostly Enzo, Mark)
Add retaining screws to cables at feedthroughs.
- Wire up BF roll/pitch picos
- Work with Miyo-kun to get pico drivers added to BS rack and screens
- Grab remaining cables etc per E1605111 and update document
- Run cables from third and fourth feedthroughs to rack
- Update E1503600 with DIO card for HPCDs, etc, etc.
- Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
- Send list of required in-vacuum cables to Takahashi-san
Debug 900 Hz noise on BF LVDT output.
Debug excess noise on TM-H3 OSEM.
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)
PI Prep (mostly Hirata-san, Mark)
- Inspect PI, compare to CAD and 2D drawings (Hirata, Mark)
- Identify missing PI parts (Hirata, Mark)
- Find and reattach repaired LVDT coil(s) (Enzo, Hirata, Mark)
- Check length/gender of connectors against E1503600 (Enzo)
Real-time and SUMCON models (mostly Perry, Mark)
- Update SUMCON model of full BS (Perry?, Okutomi?, Mark?)
- Do cut-down SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?)
- Compare measured TFs to cut-down model
- Create a proper DAC Monitor MEDM screen
- Improve ADC Monitor MEDM screen