= VIS Type B Near Term To-Do List = = VIS Type B BS Near Term To-Do List =
Line 3: Line 3:
[[../ToDoOld|Archived To-Do Items]] This list has been merged into the common Type B list: [[../ToDo]].
Line 5: Line 5:
[[#EveryWeek |Every Week]]

[[#ComingWeeks |Coming Weeks]]

[[#RealBSHang|Preparation for Real BS Hang]]

[[#SRPrepTasks|Preparation for SR Installation]]

<<Anchor(EveryWeek)>>

== Every Week ==
=== Facilities ===
 * Vacuum and roll floor.
 * Wipe ladders.
 * Tidy tools, parts.
 * Get stuff from [[../WishList]]

<<Anchor(ComingWeeks)>>
== Coming Weeks 2017-07-03 ==
=== Facilities ===

=== Design/Documentation/Planning ===
 * Solve magic wand problem.
   * Try rearranging arc weights to make room for magic wand (3D CAD or actual weights; Fabian or Hirata-san).
   * If needed based on previous, order longer threaded rods for arc weights on PI (Hirata-san).
   * Alternatively, have magic wand cut down (Hirata-san).
 * Final ballast mass design for BF and SF.
  * --(Revised design (Fabian).)--
  * Do revised drawings (Hirata-san).
  * Decide final numbers.
  * Get quote.
  * Place order.
 * Final ballast mass for IM.
  * Final design (Fabian).
  * Drawings (Hirata-san).
  * Get quotes (Hirata-san)
  * Place order (Hirata-san).
 * --(Do version of 3D CAD with test-hang arrangement of suspension and LBB damper stuff (Hirata-san).)--
 * Do version of 3D CAD with final-hang arrangement of suspension and LBB damper stuff (Hirata-san).
 * Finish assembly drawing for LBB and LBB damper ring and post on JGWDoc (Hirata-san).
 * LBB ballast mass.
  * Research real payload.
  * Measure total load capacity (see Main Assembly section).
  * Do improved mass budget.

== BS Prism/Flag gluing ==
 * --(Organize transport company for Kashiwa->Kamioka)--
 * --(Collect mirror, mirror box, tools etc from Kashiwa.)--
 * --(Ship mirror to Kamioka via Akabou.)--
 * --(Ship gluing tools to Kamioka via Yu-Pack.)--
 * --(Get 5 mm prisms cut down to 3 mm (ATC, Hirata-san).)--
 * --(Get magnet jigs remade (ATC).)--
 * Clean magnet jigs, prisms (Hirata).
 * Assemble (with glue) magnet jigs. (Mark)
 * Glue flags/prisms.
  
=== Electronics ===
 * Document LVDT driver rebuild and other changes.
 * --(Fix #0 LVDT actuator coil.)--
 * Get pico drive screens fixed (Miyo-kun)

=== Main Assembly ===
 * Do TFs.
 * Experiment with rearranging arc weights to accommodate magic wand.
 * Remove arc weights; load onto LBB; measure total load capacity.
 * Unload arc weights and store.
 * Dismantle LBB and rings.
  * Remove screw feet.
  * Replace blocks.
  * Unhook.
 * Reinstall spacers and clamps on LBB damper rings.
 * Unhook rods supporting LBB intermediate ring.


<<Anchor(RealBSHang)>>
== Real BS Hang Tasks ==
=== Major Tasks ===
 * Final ballast mass production for BF and SF (Hirata-san). (have quotes)
 * Design of receptacles for rods with 8 mm heads.
 * --(Get final OSEM cables (six of 1.7 m, two of 2.2 m, two of 2.4 m; Sato-san).)--
 * Possible rebuild of BF and/or SF
  * Set up build/test stand for filters.
  * Get filter test weights.
  * Find spare BF blade(s).
 * Reclean stuff:
  * PI (remove Kapton tape etc, etc).
  * LLB damper stuff, especially Cu segments.
 * Calibrate PI vertical LVDT.
 * Set yoke on PI vertical LVDT (if necessary).
 * Calibrate PI horizontal LVDTs.
 * Unlock BF keystone and try running BF fishing rod to fix sag problem.

=== Minor Tasks ===
==== Mechanical ====
 * Get clean bag laundered.
 * Put pointy-tipped screw in RM trolley for BS
 * Swap out temporary ballast mass in BF, SF.
 * Return/replace borrowed parts:
  * Lock washers for LBB dampers
  * Temporary ballast mass (dog clamps) in BF.
  * Wide-mouth OSEMs from RM to Akutsu-san
 * Adjust height of crossbars below BF.
 * If possible, fix galled pole in BF level of EQ stop.
 * Swap in new F0-SF maraging rod (with 8-mm heads) and new receptacles to match.
 * Check inside SF for lost ruler.
 * Tighten PI yaw return spring.
 * Get Cu O-rings for feedthroughs.

==== Electrical ====
 * Decide final in-vacuum and in-air cable routing (Enzo).
 * Calibrate all LVDTs (Enzo, Mark).
 * Remove cling wrap in BF and install vacuum-compatible heat shrink.
 * Remove cling wrap on connections for PI vertical stepper and install vacuum-compatible heat shrink (needs wider diameter heat shrink or smaller pins).
 * Rewire PI horizontal steppers with vacuum-compatible cable.
 * Adjust yoke on BF to put top of secondary at 6 mm above top of baseplate (or to give ≈0 counts at nominal height).

==== Real-time and SUMCON models ====
 * Create SUMCON models for full BS and major installation milestones.
 * Create controls design description (cf [[https://dcc.ligo.org/LIGO-T1100378/public|LIGO-T1100378]]).
 * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
 * Understand/document/debug Kokeyama-san's DIO stuff.
 * Measure LPCD and HPCD output filter response.
 * Design and install software compensation filters for LPCD and HPCD output filters.
 * Design and install GAS drift compensation filters.
 * Create a proper DAC Monitor MEDM screen.
 * Improve ADC Monitor MEDM screen.

<<Anchor(SRPrepTasks)>>

== SR Prep Tasks ==
=== Design/Purchasing ===
 * Do rough mass budget for SR2/SR3/SRM.
 * Design SR assembly frame.
 * Design final SF ballast masses (Fabian).
[[../ToDoOldBS|Archived BS To-Do Items]]

VIS Type B BS Near Term To-Do List

This list has been merged into the common Type B list: ../ToDo.