Line 3: | Line 3: |
2017-03-13 | 2017-03-21 |
Line 6: | Line 6: |
* ''Vacuum and roll floor.'' * ''Wipe ladders.'' * ''Tidy tools, parts.'' * ''Find missing light lent to Kokeyama-san.'' * ''Mark/photograph/count peeling patches on the floor.'' * ''Mark/photograph/count pillars with bare concrete bases.'' |
* Vacuum and roll floor. * Wipe ladders. * Tidy tools, parts. |
Line 14: | Line 11: |
* ''Weigh SF.'' * ''Crane in SF.'' * ''Adjust orientation of SF cap.'' * ''Adjust orientation of SF.'' * ''Find/attach cable clamps for SF.'' * ''Hook SF-BF rod (with hex cable clamp).'' * Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary. * Suspend BF/IRM/IM/RM/BS; re-ballast and re-trim as necessary. * ''Confirm weight of BF/IRM/IM/RM/BS.'' * ''Complete final ballast mass design.'' * ''Install new security structure stuff for BS/RM.'' * ''Install L-brackets under SF.'' |
* Reroute in-vacuum cables up to SF level; remove 40-cm extensions if possible; add in-vacuum extension cables if necessary. |
Line 28: | Line 14: |
* ''Add retaining screws to cables at feedthroughs.'' | * Make more anti-feedthrough adapters. * Add retaining screws to cables at feedthroughs (mostly done, needs finishing). * Run final 10-m section of cables from third and fourth feedthroughs to rack. |
Line 30: | Line 18: |
* Wire up SF LVDT. * Wire up SF fishing rod stepper. |
|
Line 32: | Line 22: |
* Run cables from third and fourth feedthroughs to rack | |
Line 36: | Line 25: |
* ''Debug 900 Hz noise on BF LVDT output.'' * ''Debug excess noise on TM-H3 OSEM.'' |
|
Line 47: | Line 34: |
* Find LBB blade bases and cable clamps. * Find LBB blades. |
* Find table, weights, etc for use with LBB blade bending jigs. |
Line 54: | Line 40: |
* Update SUMCON model of full BS (Perry?, Okutomi?, Mark?) * Do cut-down SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?) * Compare measured TFs to cut-down model * Create a proper DAC Monitor MEDM screen * Improve ADC Monitor MEDM screen |
* Get Perry (and Enzo) set up with SUMCON. * Update SUMCON model of full BS. * Do cut-down SUMCON model of just payload hanging from fixed BS. * Compare measured TFs to cut-down model(s). * Create a proper DAC Monitor MEDM screen. * Improve ADC Monitor MEDM screen. |
VIS Type B Near Term To-Do List
2017-03-21
Facilities (mostly full team)
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)
- Reroute in-vacuum cables up to SF level; remove 40-cm extensions if possible; add in-vacuum extension cables if necessary.
Electronics (mostly Enzo, Mark)
- Make more anti-feedthrough adapters.
- Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
- Run final 10-m section of cables from third and fourth feedthroughs to rack.
- Wire up BF roll/pitch picos
- Wire up SF LVDT.
- Wire up SF fishing rod stepper.
- Work with Miyo-kun to get pico drivers added to BS rack and screens
- Grab remaining cables etc per E1605111 and update document
- Update E1503600 with DIO card for HPCDs, etc, etc.
- Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
- Send list of required in-vacuum cables to Takahashi-san
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)
PI Prep (mostly Hirata-san, Mark)
- Inspect PI, compare to CAD and 2D drawings (Hirata, Mark)
- Identify missing PI parts (Hirata, Mark)
- Find and reattach repaired LVDT coil(s) (Enzo, Hirata, Mark)
- Find and install fishing rod.
- Remove and pack away the accelerometers.
- Find table, weights, etc for use with LBB blade bending jigs.
- Install LLB blades.
- Install LLB modules.
- Check length/gender of connectors against E1503600 (Enzo)
Real-time and SUMCON models (mostly Perry, Mark)
- Get Perry (and Enzo) set up with SUMCON.
- Update SUMCON model of full BS.
- Do cut-down SUMCON model of just payload hanging from fixed BS.
- Compare measured TFs to cut-down model(s).
- Create a proper DAC Monitor MEDM screen.
- Improve ADC Monitor MEDM screen.