2524
Comment:
|
← Revision 210 as of 2019-01-04 15:21:23 ⇥
155
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= VIS Type B Near Term To-Do List = | = VIS Type B BS Near Term To-Do List = |
Line 3: | Line 3: |
2017-03-13 | This list has been merged into the common Type B list: [[../ToDo]]. |
Line 5: | Line 5: |
== Facilities (mostly full team) == * ''Vacuum and roll floor.'' * ''Wipe ladders.'' * ''Tidy tools, parts.'' * ''Find missing light lent to Kokeyama-san.'' * ''Mark/photograph/count peeling patches on the floor.'' * ''Mark/photograph/count pillars with bare concrete bases.'' == Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) == * ''Weigh SF.'' * ''Crane in SF.'' * ''Adjust orientation of SF cap.'' * ''Adjust orientation of SF.'' * ''Find/attach cable clamps for SF.'' * ''Hook SF-BF rod (with hex cable clamp).'' * Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary. * Suspend BF/IRM/IM/RM/BS; re-ballast and re-trim as necessary. * ''Confirm weight of BF/IRM/IM/RM/BS.'' * ''Complete final ballast mass design.'' * ''Install new security structure stuff for BS/RM.'' * ''Install L-brackets under SF.'' == Electronics (mostly Enzo, Mark) == * ''Add retaining screws to cables at feedthroughs.'' * Wire up BF roll/pitch picos * Work with Miyo-kun to get pico drivers added to BS rack and screens * Grab remaining cables etc per E1605111 and update document * Run cables from third and fourth feedthroughs to rack * Update E1503600 with DIO card for HPCDs, etc, etc. * Decide final length for BS OSEM cables (Enzo, Mark, Fabian) * Send list of required in-vacuum cables to Takahashi-san * ''Debug 900 Hz noise on BF LVDT output.'' * ''Debug excess noise on TM-H3 OSEM.'' * Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark) * Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata) == PI Prep (mostly Hirata-san, Mark) == * Inspect PI, compare to CAD and 2D drawings (Hirata, Mark) * Identify missing PI parts (Hirata, Mark) * Find and reattach repaired LVDT coil(s) (Enzo, Hirata, Mark) * Find and install fishing rod. * Remove and pack away the accelerometers. * Find LBB blade bases and cable clamps. * Find LBB blades. * Install LLB blades. * Install LLB modules. * Check length/gender of connectors against E1503600 (Enzo) == Real-time and SUMCON models (mostly Perry, Mark) == * Update SUMCON model of full BS (Perry?, Okutomi?, Mark?) * Do cut-down SUMCON model of just payload hanging from fixed BS (Perry?, Okitomi?, Mark?) * Compare measured TFs to cut-down model * Create a proper DAC Monitor MEDM screen * Improve ADC Monitor MEDM screen |
[[../ToDoOldBS|Archived BS To-Do Items]] |