VIS Type B Near Term To-Do List
2017-03-21
Facilities (mostly full team)
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)
- Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
Electronics (mostly Enzo, Mark)
- Make more anti-feedthrough adapters.
- Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
- Run final 10-m section of cables from third and fourth feedthroughs to rack.
- Wire up BF roll/pitch picos
- Wire up SF LVDT.
- Wire up SF fishing rod stepper.
- Work with Miyo-kun to get pico drivers added to BS rack and screens
- Grab remaining cables etc per E1605111 and update document
- Update E1503600 with DIO card for HPCDs, etc, etc.
- Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
- Send list of required in-vacuum cables to Takahashi-san
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)
PI Prep (mostly Hirata-san, Mark)
- Prepare PI for moving.
- Remove accelerometers.
- Remove large weights.
- Remove arc weights.
- Attach lifting plates.
- Wrap with clingwrap, cover with spare cleanbag.
- Clear path to remove PI with forklift.
- Move worktables.
- Move portable cleanroom.
- Shutdown rack and move electrical cables.
- Prepare second floor for receiving PI.
- Clean and clingwrap pallet.
- Double-check dimensions.
- Disconnect fan cables, curtain.
- Crane PI into clean booth.
- Find and reattach repaired LVDT coil(s) (Enzo, Hirata, Mark)
- Find and install fishing rod.
- Remove and pack away the accelerometers.
- Find table, weights, etc for use with LBB blade bending jigs.
- Install LLB blades.
- Install LLB modules.
- Check length/gender of connectors against E1503600 (Enzo)
- Clean up after floor work.
Real-time and SUMCON models (mostly Perry, Mark)
- Get Perry (and Enzo) set up with SUMCON.
- Update SUMCON model of full BS.
- Do cut-down SUMCON model of just payload hanging from fixed BS.
- Compare measured TFs to cut-down model(s).
- Create a proper DAC Monitor MEDM screen.
- Improve ADC Monitor MEDM screen.