VIS Type B Near Term To-Do List
Every Week
Facilities (mostly full team)
- Clean up after floor work.
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
2017-04-03
SF/BF/...
- Trim BF to correct pitch/roll.
- Install temporary ballast mass in SF.
- Lift SF/BF/... and check SF pitch/roll balance and overall weight.
Continue PI Prep
- Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender.
- Install fishing rod.
- Enlarge ring of crane adapter.
- Find table, weights, etc for use with LBB blade bending jigs.
- Set up LBB blade tensioning jig.
- Install LLB blades.
- Install LLB blade units in PI.
Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)
- Test SF LVDT.
- Test SF fishing rod stepper.
- Debug TM-H4.
Electronics (mostly Enzo, Mark)
- Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
- Work with Miyo-kun to get pico drivers added to BS rack and screens
- Update E1503600 with DIO card for HPCDs, etc, etc.
- Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
- Send list of required in-vacuum cables to Takahashi-san
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)
Real-time and SUMCON models (mostly Perry, Mark)
- Create a proper DAC Monitor MEDM screen.
- Improve ADC Monitor MEDM screen.