VIS Type B Near Term To-Do List
Every Week
Facilities (mostly full team)
- Clean up after floor work.
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
2017-04-24
Continue PI Prep
- Install LLB blades.
- Install LLB blade units in PI.
Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)
- Crane in PI.
- Connect up SF/... .
- Measure overweight if any.
- Try removing some/all Cu dampers.
- Remove PI again.
- Do final trim of SF, fix LVDT if needed.
- Crane PI back in.
Electronics (mostly Enzo, Mark)
- Debug SF LVDT.
- Add retaining screws to cables at feedthroughs (mostly done, needs finishing).
- Work with Miyo-kun to get pico drivers added to BS rack and screens
- Update E1503600 with DIO card for HPCDs, etc, etc.
- Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
- Send list of required in-vacuum cables to Takahashi-san
- Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)
- Make spreadsheet on Google Docs or the like with in-vacuum cable inventory (Hirata)
- Count used, unused and broken in-vac cables and send data to Sato-san.
Real-time and SUMCON models (mostly Perry, Mark)
- Understand/document/debug Kokeyama-san's DIO stuff.
- Measure LPCD and HPCD output filter response.
- Design and install software compensation filters for LPCD and HPCD output filters.
- Create a proper DAC Monitor MEDM screen.
- Improve ADC Monitor MEDM screen.