Line 4: Line 4:

== 2017-06-26 ==
== BS Prism/Flag gluing ==
 * Push Hirose-san to set exact date.
 * Organize NAOJ vehicle for Mitaka->Kashiwa
 * Collect all items required.
  * Mirror box.
  * ''Prisms.'' (not found!)
  * Stub flags.
  * Magnets: SmCo, 2 mm diameter, 3 mm long
  * Prism jigs
  * Flag jigs
 * Glue magnets to flags, 2 N, 2 S.
 * Organize clean suits.
  * Make a list of people's sizes
  * Get Mark/Enzo to bring from Kamioka.

=== Main Assembly ===
 * Adjust pitch/yaw/vertical of dummy optic.
 * Crane tank lid on.
 * Start TFs.

=== Electronics ===
 * Wash extra F-F gender benders.
 * Fix broken picomotor cable.
 * Sort out naming convention for PI LVDTs, geophones and horizontal steppers.

=== LSOL ===
 * Assist Simon with hardware installation of LSOL.
 * Assist Simon with modifications to realtime model for LSOL.

=== Real-time and SUMCON models ===
 * Derive and install PI LVDT matrices.
 * Check LSOL section of k1visbs model.

VIS Type B To-Do List - Archived Items

../ToDo

2017-06-26

BS Prism/Flag gluing

  • Push Hirose-san to set exact date.
  • Organize NAOJ vehicle for Mitaka->Kashiwa

  • Collect all items required.
    • Mirror box.
    • Prisms. (not found!)

    • Stub flags.
    • Magnets: SmCo, 2 mm diameter, 3 mm long

    • Prism jigs
    • Flag jigs
  • Glue magnets to flags, 2 N, 2 S.
  • Organize clean suits.
    • Make a list of people's sizes
    • Get Mark/Enzo to bring from Kamioka.

Main Assembly

  • Adjust pitch/yaw/vertical of dummy optic.
  • Crane tank lid on.
  • Start TFs.

Electronics

  • Wash extra F-F gender benders.
  • Fix broken picomotor cable.
  • Sort out naming convention for PI LVDTs, geophones and horizontal steppers.

LSOL

  • Assist Simon with hardware installation of LSOL.
  • Assist Simon with modifications to realtime model for LSOL.

Real-time and SUMCON models

  • Derive and install PI LVDT matrices.
  • Check LSOL section of k1visbs model.

2017-06-19

Facilities

  • Remove cling wrap from stuff.
  • Plug stuff back in (charging station, KOACH filters, OL etc).
  • Power up rack.

Main Assembly

  • Remove crossbars below BF and SF.
  • Set SF damper to 4 mm clearance.
  • Find wrenches for vacuum tank jacks (41 mm and possibly 75 mm).
  • Adjust jacks to nominal height.
  • Do up all EQ stops etc (except SF).
  • Remove geophones (temporarily, for craning).
  • Crane suspension into tank.
  • Hook LBB Cu ring.
  • Hook LBB.
  • Crane vacuum tank lid+ring back on.
  • Remove vacuum tank lid (only) and store on pallet.
  • Add ballast to LBB.
  • Replace geophones.
  • Unlock all but IP and check pendulum is centered in security structure. Adjust with jacks.
  • Unlock IP and adjust to center with jacks.

Electronics

  • Disconnect in-vacuum and in-air cabling from feedthroughs (label in-vacuum ones).
  • Remove port covers where feedthroughs will go, move feedthroughs from assembly frame and install on vacuum tank ring.
  • Reconnect in-vacuum cabling.
  • Adjust in-air cabling to match 135° rotation of BS.
  • Reconnect in-air cables. (all but 4)

2017-06-12

Main Assembly

  • Check pitch/roll of SF and adjust trim as required.
  • Prepare LBB.
    • Attach LBB outriggers and rod receptacles.
  • Prepare LBB Cu ring.
    • Remove from tank, fix incompletely threaded holes, reinstall in tank.
    • Lay down spacers to protect magnets (in next step).
  • Prepare LBB magnet ring.
    • Disassemble.
    • Pass pieces into tank.
    • Reassemble on top of Cu ring.
  • Install LBB damper.
    • Bind LBB damper rings together with slings.
    • Remove vacuum tank lid and ring.
    • Crane rings up to install height, hook LBB magnet ring and support LBB Cu ring by TBD method.

Electronics

  • Cable and test PI yaw stepper.
  • Cable and test PI vertical stepper.
  • Cable and test PI horizontal steppers.
  • Cable and test PI horizontal LVDTs.
  • Finalize OSEM cable lengths and update D1503600, E1503091 and Sato-san's spreadsheet.
  • Recount cables in box and in test hang, and update Sato-san's spreadsheet.
  • Cable and test PI vertical LVDT.
  • Debug/fix PI vertical LVDTs #0 and #2.
  • Debug/fix geophone #1.

2017-05-29

Facilities

Design/Purchasing

  • Get more cable ties.

Main Assembly

  • Reinstall blades in LBB blade units.
  • Do load test on LBB blade units.

Electronics

  • Route BF/... cabling up past SF to PI.
  • Route SF cabling up to PI.
  • Add Type 3 extensions to SF/... cables.
  • Move vacuum flanges to positions on assembly frame more convenient for next stage (accessible from second floor, one on each corner of frame).
  • Move in-air cabling to match flange positions.

2017-05-22

Facilities

Design/Purchasing

  • Design, order modifications to LBB blade springs.
  • Get more duckboards.

Main Assembly

  • Find geophone adapter plates.
  • Ultrasonically clean geophone adapter plates and screws.
  • Install geophone adapter plates.
  • Get more PEEK clamp pieces from Sato-san and install.
  • Lift PI and hang LBB damper ring.
  • Crane PI back in.
  • Install rod, this time with hex cable clamp.
  • Re-hook SF/... section.
  • Trim SF/... section.
  • Install geophones.

Electronics

  • Debug and calibrate SF LVDT.
  • Debug stepper motors.
  • Make two more (in-air) geophone unscrambler cables per E1503600-v13 Sheet 8.

2017-05-15

Facilities

  • Get more UHV foil.
  • Clear spaces for PR2 bellows work and SR2 ladder installation on 5/15.
  • Fix safety bar on -X side of assembly frame (move to other side of pillars and attach more securely).

Main Assembly

  • Secure arc weights with M8 nuts.
  • Remove PI.
  • Unjam PI-SF rod.
  • Remove SF cap.
  • Remove blades from LBB blade units and send off for rework.
  • Install remaining cable clamps on PI.
  • Remove one Cu damper segment from SF cap and reconfigure remaining two to be symmetrical.
  • Decide pattern of SF damper ring magnets (72 pieces in 2/3 of the original ring).
  • Install magnets on SF damper ring.

Electronics

  • Make PI vertical/yaw stepper in-air adapter cable per E1503600-v13 Sheet 7.

2017-05-09

Safety

  • Install safety bars

Continue PI Prep

  • Find, install and wire up PI yaw stepper and bracket.
  • Test IP.
  • Install LBB blades in blade units.
  • Check LBB blade unit alignment (was off by 21 mm due to blades being too long).

Hanging SF/BF/IRM/IM/RM/BS

  • Fix centering of SF/... section.

Electronics

  • Count used, unused, broken and needed in-vacuum cables and send data to Sato-san.
  • Check connections in new geophone adapters (they turned out to be new-style).
  • Decide final length for BS OSEM cables.

2017-04-24

Continue PI Prep

  • Install LLB blades.
  • Install LLB blade units in PI.

Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)

  • Crane in PI.
  • Connect up SF/... .
  • Measure overweight if any.

Electronics (mostly Enzo, Mark)

  • Update E1503600 with DIO card for HPCDs, etc, etc.
  • Decide final length for BS OSEM cables (Enzo, Mark, Fabian)

Real-time and SUMCON models (mostly Perry, Mark)

  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.

2017-04-17

SF/BF/...

  • Trim BF to correct pitch/roll.
  • Install temporary ballast mass in SF.
  • Lift SF/BF/... and check SF pitch/roll balance and overall weight.

Continue PI Prep

  • Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender.
  • Install fishing rod.
  • Enlarge ring of crane adapter.
  • Find table, weights, etc for use with LBB blade bending jigs.
  • Set up LBB blade tensioning jig.

Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)

  • Test SF fishing rod stepper.
  • Debug TM-H4.

Electronics (mostly Enzo, Mark)

  • Work with Miyo-kun to get pico drivers added to BS rack and screens
  • Update E1503600 with DIO card for HPCDs, etc, etc.
  • Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)

2017-04-03

PI Move

  • General prep
    • Decide if air shower needs to be moved.
    • Triple-check dimensions around second-floor parking spot for PI; decide best place for pallet.
    • Check for obstacles along path around -X side of cleanbooth.
    • Find/clean Saito-sensei's PI lifting adapter and any needed fasteners.
    • Check both crane remote controls (clean and dirty) are charged.
  • Prepare PI for moving.
    • Remove accelerometers and store safely.
    • Remove large weights. (How? With forklift at last minute? Where to?)
    • Remove arc weights (move some to second floor, wrap rest for storage).
    • Attach lifting plates.
    • Wrap with clingwrap, cover with spare cleanbag.
    • Remove old cabling from PI to rack.
  • Prepare second floor for receiving PI.
    • Clean and clingwrap pallet.
    • Find metal plates and/or duckboards for on top of pallets.
    • Move BS cables on -Y side of tank off top of beam.
    • Find shims (about 75 mm high) to put on beam where cables were, to help support pallet.
  • Clear path to remove PI with forklift.
    • Move any obstacles identified previously.
    • Shutdown BS/PR2 racks and move electrical cables.
    • Move any stored items on -Y side of portable cleanroom.
    • Move portable cleanroom towards -Y.
    • Move worktables from next to BS/PR2 racks.
  • Move PI
    • Disconnect fan cables, curtain (Miyoki-san).
    • Unzip ceiling panel.
    • Crane pallet into cleanbooth.
    • Lay foil on pallet.
    • Forklift PI to -X,+Y corner of cleanbooth
    • Crane PI into clean booth.
  • Cleanup
    • Zip up ceiling panel.
    • Reconnect fan cables, curtain (Miyoki-san).
    • Replace tables near BS/PR2 racks
    • Move portable cleanroom back to original spot.
    • Re-lay electrical cables.
    • Power up racks.

Electronics (mostly Enzo, Mark)

  • Make more anti-feedthrough adapters.

Real-time and SUMCON models (mostly Perry, Mark)

  • Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
  • Get Perry (and Enzo) set up with SUMCON.
  • Update SUMCON model of full BS.
  • Do cut-down SUMCON model of just payload hanging from fixed BS.
  • Compare measured TFs to cut-down model(s).