== 2017-04-24 ==

=== Continue PI Prep ===
 * Install LLB blades.
 * Install LLB blade units in PI.

=== Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry) ===
 * Crane in PI.
 * Connect up SF/... .
 * Measure overweight if any.
 
=== Electronics (mostly Enzo, Mark) ===
 * Update E1503600 with DIO card for HPCDs, etc, etc.
 * Decide final length for BS OSEM cables (Enzo, Mark, Fabian)

== Real-time and SUMCON models (mostly Perry, Mark) ==
 * Understand/document/debug Kokeyama-san's DIO stuff.
 * Measure LPCD and HPCD output filter response.
 * Design and install software compensation filters for LPCD and HPCD output filters.

VIS Type B To-Do List - Archived Items

../ToDo

2017-04-24

Continue PI Prep

  • Install LLB blades.
  • Install LLB blade units in PI.

Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)

  • Crane in PI.
  • Connect up SF/... .
  • Measure overweight if any.

Electronics (mostly Enzo, Mark)

  • Update E1503600 with DIO card for HPCDs, etc, etc.
  • Decide final length for BS OSEM cables (Enzo, Mark, Fabian)

Real-time and SUMCON models (mostly Perry, Mark)

  • Understand/document/debug Kokeyama-san's DIO stuff.
  • Measure LPCD and HPCD output filter response.
  • Design and install software compensation filters for LPCD and HPCD output filters.

2017-04-17

SF/BF/...

  • Trim BF to correct pitch/roll.
  • Install temporary ballast mass in SF.
  • Lift SF/BF/... and check SF pitch/roll balance and overall weight.

Continue PI Prep

  • Finish reattaching repaired LVDT coil(s) and redoing connectors with correct gender.
  • Install fishing rod.
  • Enlarge ring of crane adapter.
  • Find table, weights, etc for use with LBB blade bending jigs.
  • Set up LBB blade tensioning jig.

Hanging BF/IRM/IM/RM/BS (mostly Mark, Fabian, Perry)

  • Test SF fishing rod stepper.
  • Debug TM-H4.

Electronics (mostly Enzo, Mark)

  • Work with Miyo-kun to get pico drivers added to BS rack and screens
  • Update E1503600 with DIO card for HPCDs, etc, etc.
  • Decide final length for BS OSEM cables (Enzo, Mark, Fabian)
  • Make table of ADC/DAC assignments and check for consistency with D1503600 and k1visbs (Enzo, Mark)

2017-04-03

PI Move

  • General prep
    • Decide if air shower needs to be moved.
    • Triple-check dimensions around second-floor parking spot for PI; decide best place for pallet.
    • Check for obstacles along path around -X side of cleanbooth.
    • Find/clean Saito-sensei's PI lifting adapter and any needed fasteners.
    • Check both crane remote controls (clean and dirty) are charged.
  • Prepare PI for moving.
    • Remove accelerometers and store safely.
    • Remove large weights. (How? With forklift at last minute? Where to?)
    • Remove arc weights (move some to second floor, wrap rest for storage).
    • Attach lifting plates.
    • Wrap with clingwrap, cover with spare cleanbag.
    • Remove old cabling from PI to rack.
  • Prepare second floor for receiving PI.
    • Clean and clingwrap pallet.
    • Find metal plates and/or duckboards for on top of pallets.
    • Move BS cables on -Y side of tank off top of beam.
    • Find shims (about 75 mm high) to put on beam where cables were, to help support pallet.
  • Clear path to remove PI with forklift.
    • Move any obstacles identified previously.
    • Shutdown BS/PR2 racks and move electrical cables.
    • Move any stored items on -Y side of portable cleanroom.
    • Move portable cleanroom towards -Y.
    • Move worktables from next to BS/PR2 racks.
  • Move PI
    • Disconnect fan cables, curtain (Miyoki-san).
    • Unzip ceiling panel.
    • Crane pallet into cleanbooth.
    • Lay foil on pallet.
    • Forklift PI to -X,+Y corner of cleanbooth
    • Crane PI into clean booth.
  • Cleanup
    • Zip up ceiling panel.
    • Reconnect fan cables, curtain (Miyoki-san).
    • Replace tables near BS/PR2 racks
    • Move portable cleanroom back to original spot.
    • Re-lay electrical cables.
    • Power up racks.

Electronics (mostly Enzo, Mark)

  • Make more anti-feedthrough adapters.

Real-time and SUMCON models (mostly Perry, Mark)

  • Reroute in-vacuum cables up to SF level; add in-vacuum extension cables if necessary.
  • Get Perry (and Enzo) set up with SUMCON.
  • Update SUMCON model of full BS.
  • Do cut-down SUMCON model of just payload hanging from fixed BS.
  • Compare measured TFs to cut-down model(s).