Differences between revisions 14 and 15
Revision 14 as of 2018-02-13 14:47:17
Size: 5386
Editor: MarkBarton
Comment:
Revision 15 as of 2018-04-15 19:15:32
Size: 7496
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
== 2018-04-09 ==
 * Glue prisms and magnet/standoff assemblies on SR3.
 * Glue ferromagnetic disks into IM flags (now have two sets of six, for SR3 and SRM).
 * Calibration of LVDT and FR for 2 BFs and 2 SFs.
 * Two IMs mostly built.

== 2018-04-02 ==
 * Get SR3 model running.
 * Receive SR3, fix FC.
 * Make magnet-standoff assemblies (two sets, for SR3 and SRM).
 * Inventory of payload parts.
 * Finish mechanical adjustment of 2 BFs and 2 SFs.
 * Finish rack work (except for missing boxes).

== 2018-03-26 ==
 * Tune one BF, rebuild one BF, test two SFs.
 * Do SR3 in-air cables.
 * Run power supply directly to SR3 (instead of via SR2).
 * SR2 TFs.

== 2018-03-19 ==
 * Make one geophone pod, mostly finish 4 more.
 * Set dummy BS to soak.
 * Assemble 12 OSEMs.
 * Make pair of in-air pico cables (for SRM).

== 2018-03-12 ==
 * (Close up BS tank.)
 * Add boxes to SR3/SRM racks.
 * Disassemble two BFs and characterize all SF BF blades.
 * Correct SF-BF yaw issue.
 * Send OSEM stuff to Mitaka.
 * Prepare for geophone assembly.
 * Pack, send off SF caps for remachining.


== 2018-03-05 ==
 * (Remove the non-vacuum-compatible ballast mass from the BS tank.)
 * (Secure all the PR2 feedthrough connections with screws.)
 * Get empty rack for SRM.
 * Calibrate the SR2 SF LVDT sensing and actuation, and the FR.
 * Measure the bounce frequencies of the SF with and without the cap, and the bounce frequency of the BF.
 * Tried different SF caps.

== 2018-02-26 ==
 * (Remove LBB temporary ballast masses from BS chamber.)
 * Route cables up to under SF.
 * Cable/test BF cap picos.

== 2018-02-19 ==

 * Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
 * Claose BF, runs cables upwards.
 * Weigh/trim BF/... .
 * Build up AF and add SF.
 * Suspend BF.

== 2018-02-13 ==
 * Build IRM around IM.
 * Cable/test/adjust IM OSEMs.
 * Send OSEM parts back to Mitaka so that Shoda-san can assemble them in Mitaka.
 * Test/calibrate BF FR.
 * Derive matrices.
 * Screen and model fixes.

Line 8: Line 74:
 * Empty out gowning cleanroom in prep for roof work.

VIS Type B SR To-Do List - Archived Items

SR To-Do Items

BS To-Do Items

2018-04-09

  • Glue prisms and magnet/standoff assemblies on SR3.
  • Glue ferromagnetic disks into IM flags (now have two sets of six, for SR3 and SRM).
  • Calibration of LVDT and FR for 2 BFs and 2 SFs.
  • Two IMs mostly built.

2018-04-02

  • Get SR3 model running.
  • Receive SR3, fix FC.
  • Make magnet-standoff assemblies (two sets, for SR3 and SRM).
  • Inventory of payload parts.
  • Finish mechanical adjustment of 2 BFs and 2 SFs.
  • Finish rack work (except for missing boxes).

2018-03-26

  • Tune one BF, rebuild one BF, test two SFs.
  • Do SR3 in-air cables.
  • Run power supply directly to SR3 (instead of via SR2).
  • SR2 TFs.

2018-03-19

  • Make one geophone pod, mostly finish 4 more.
  • Set dummy BS to soak.
  • Assemble 12 OSEMs.
  • Make pair of in-air pico cables (for SRM).

2018-03-12

  • (Close up BS tank.)
  • Add boxes to SR3/SRM racks.
  • Disassemble two BFs and characterize all SF BF blades.
  • Correct SF-BF yaw issue.
  • Send OSEM stuff to Mitaka.
  • Prepare for geophone assembly.
  • Pack, send off SF caps for remachining.

2018-03-05

  • (Remove the non-vacuum-compatible ballast mass from the BS tank.)
  • (Secure all the PR2 feedthrough connections with screws.)
  • Get empty rack for SRM.
  • Calibrate the SR2 SF LVDT sensing and actuation, and the FR.
  • Measure the bounce frequencies of the SF with and without the cap, and the bounce frequency of the BF.
  • Tried different SF caps.

2018-02-26

  • (Remove LBB temporary ballast masses from BS chamber.)
  • Route cables up to under SF.
  • Cable/test BF cap picos.

2018-02-19

  • Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
  • Claose BF, runs cables upwards.
  • Weigh/trim BF/... .
  • Build up AF and add SF.
  • Suspend BF.

2018-02-13

  • Build IRM around IM.
  • Cable/test/adjust IM OSEMs.
  • Send OSEM parts back to Mitaka so that Shoda-san can assemble them in Mitaka.
  • Test/calibrate BF FR.
  • Derive matrices.
  • Screen and model fixes.

2018-02-05

  • Empty out gowning cleanroom in prep for roof work.
  • Check PR3 area for Ø10x10 IM flag magnets.
  • Make in-air pico adapter cables.
  • Label in-air pico adapter cables.
  • Cable IM picos through to driver.
  • Cable BF LVDT through to driver.
  • Check LVDT resistances and inductances at various points from coils to rack.
  • Cable BF FR stepper through to driver.
  • Calibrate LVDT.
  • Test IM picos and BF yaw pico.
  • Install ballast mass in BF.
  • Remove stuff from changing area in preparation for installing SS sheet.

2018-01-28

  • Install IRM.
  • Adjust IM OSEMs.
  • Cable IM OSEMs.
  • Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
  • Install pre-calculated BF trim mass.
  • Lift

2018-01-22

  • —(Debug keystone issue.)—
  • Cable yaw pico and LVDT on new BF.
  • Calibrate LVDT on new BF.
  • Adjust IM/RM/SR total mass and pitch/roll balance.
  • Test IM picos.
  • Prepare SR3 area for PI test.
  • Check BF yaw pico.

2018-01-15

  • Set up SR2 rack
    • Get more 1-m power cables and connect up remaining boxes. (No orange ones left - used yellow temporarily.)
    • Run LAN and power cables for stepper drivers.
  • Cable RM OSEMs to rack.
  • Setup QPD and cable to rack.
  • Fix links to OPLEVINF filter screen from chain screen.
  • Initialize gains and matrix elements for SR2 OL.
  • Wash parts for flying saucers.
  • Test nuts for flying saucers.
  • Order more nuts for flying saucers.
  • Add DRIVEALIGN button to overview screen.
  • Check sizes and in-stock numbers of screws for geophones.
    • 20 x M8*35 (need 3*16=48)
    • 35 x M8*30 (need 3*8=24)
    • 4 x Viton disks (need 4)
    • 123 M8 washers (need 3*24=72)
  • Do TFs from RM OSEMS to OL pitch/roll.
  • Make IM OSEMs.
  • Install load gauge adapter.
  • Lift IM/RM/SR with LGA, check/adjust total mass and pitch/yaw balance.
  • Crane in BF.
  • Install BF-IRM rods and top plate of IRM.
  • Install BF-IM rod with flying saucer.
  • Hook IM.
  • Route cables via flying saucer up to under BF.

2018-01-09

  • Center IM.
  • Set up optical lever for leveling optic.
  • Hang optic.
  • Hang RM.
  • Install bottom section of SS.
  • Cable up OSEMs.
  • Do inventory of ballast masses.

2017-12-25

  • Recover from power outage.
  • Calibrate BF LVDT.
  • Route in-vac cabling for OSEMs.
  • Route in-vac cabling for steppers
  • Fix SR2 RTM.
  • Wipe/blow frame.
  • Drape clean bag.
  • Reinstall L-brackets
  • Crane in IM.
  • Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).

2017-12-18

  • Assemble SR2 IP.
    • Final assembly.
    • Test IP picos.
  • Assembly frame stuff:
    • Center and immobilize optical table.
    • Adjust verticality of assembly frame.
    • Remove internal crossbars for SF and BF.
    • Adjust external crossbar heights.
    • Install red bars and IM ring.
    • Ship L-brackets to Mitaka and remachine.

2017-12-11

  • Double check prism heights.
  • Do mirror gluing.
  • Check mirror gluing.
  • Hassle Miyo-kun for pico driver.
  • Set up for testing IP with pico driver.
  • Make pico cable.
  • Glue Misumi plug in movable mass (also glue remaining disks in IM flags).
  • Find BF accessories.
  • Weigh BF.
  • Find in-vac cables:
    • 2 x Type 3-6m
    • 4 3 x Type 4-1.5m
    • 7 x Type 2-2m
  • Set up SR2 rack
    • Get ADC/DAC/DIO cards
    • Get cables/cards for SR2
    • Get BIO white cables x 10
    • Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.
    • Get SR2 real-time model running (Yamamoto-san).
    • Move trolley system from SR3 to SR2.
  • Find and attach feedthroughs.
  • Find circuit boards for geophones (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.)
    • Check if they have sockets soldered on. (Yes.)
    • Check if they come with hex posts. (Yes.)

2017-11-27

  • Bring SR2 into tunnel.
  • Bring spare mirror box into tunnel.
  • Bring 6 L-brackets for chassis boxes into tunnel.
  • Bring cleaned parts from near ultrasonic cleaner into tunnel.
  • Move SR2 rack into position.
  • Set up SR2 rack
    • Add L-brackets to new whitening filter and two HPCDs (one in BS rack).
    • Get ADC/DAC/DIO cards.
    • Get cables/cards for SR2:
      • 5 DSub-37 cables (tent)
      • 5 DSub-15M to DSub-9M adapter cables (tent)
      • 2 DSub-9 FF gender benders (for LVDTs)
      • BNC-LEMO adapter (for LVDT sig gen)
    • Screw boxes into rack.
    • Update SR2 suspension items doc.
    • Run cables to assembly frame.
    • Find feedthroughs.
  • Transfer spare mirror to spare mirror box.
  • Transfer SR2 to good mirror box.
  • Find mirror gluing items:
    • Prism micrometer stages
    • Prism jigs
    • Lenses for inspecting scribe lines

2017-11-13

  • Huge cleanup!
  • Find collet from maraging rod adapter.
  • Make notes on where ladder needs to go.
  • Take photos and make notes about where SR2 safety bars need to go (time permitting, also SR3).
  • Wrap and label BS parts.
  • Bring work table from PR2 area.
  • Bring racks from SRM area.
  • Look for needed screws, especially for IM.
  • Find mirror gluing items.
    • Prisms
    • Secondary prisms
    • Magnets
    • Magnet bases
    • Magnet jigs
    • Balance
    • Stirrers
    • Mixing dishes
    • EP30

KAGRA/Subgroups/VIS/TypeB/ToDoOldSR (last edited 2019-01-04 15:39:49 by MarkBarton)