== 2017-08-21 == | == 2018-02-05 == * Check PR3 area for Ø10x10 IM flag magnets. * Make in-air pico adapter cables. * Label in-air pico adapter cables. * Cable IM picos through to driver. * Cable BF LVDT through to driver. * Check LVDT resistances and inductances at various points from coils to rack. * Cable BF FR stepper through to driver. * Calibrate LVDT. * Test IM picos and BF yaw pico. * Install ballast mass in BF. * Remove stuff from changing area in preparation for installing SS sheet. == 2018-01-28 == * Install IRM. * Adjust IM OSEMs. * Cable IM OSEMs. * Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw. * Install pre-calculated BF trim mass. * Lift == 2018-01-22 == * —(Debug keystone issue.)— * Cable yaw pico and LVDT on new BF. * Calibrate LVDT on new BF. * Adjust IM/RM/SR total mass and pitch/roll balance. * Test IM picos. * Prepare SR3 area for PI test. * Check BF yaw pico. == 2018-01-15 == * Set up SR2 rack * --(Get more 1-m power cables and connect up remaining boxes.)-- (No orange ones left - used yellow temporarily.) * Run LAN and power cables for stepper drivers. * --(Cable RM OSEMs to rack.)-- * --(Setup QPD and cable to rack.)-- * --(Fix links to OPLEVINF filter screen from chain screen.)-- * --(Initialize gains and matrix elements for SR2 OL.)-- * --(Wash parts for flying saucers.)-- * --(Test nuts for flying saucers.)-- * Order more nuts for flying saucers. * Add DRIVEALIGN button to overview screen. * --(Check sizes and in-stock numbers of screws for geophones.)-- * 20 x M8*35 (need 3*16=48) * 35 x M8*30 (need 3*8=24) * 4 x Viton disks (need 4) * 123 M8 washers (need 3*24=72) * --(Do TFs from RM OSEMS to OL pitch/roll.)-- * --(Make IM OSEMs.)-- * --(Install load gauge adapter.)-- * --(Lift IM/RM/SR with LGA, check/adjust total mass and pitch/yaw balance.)-- * --(Crane in BF.)-- * --(Install BF-IRM rods and top plate of IRM.)-- * --(Install BF-IM rod with flying saucer.)-- * --(Hook IM.)-- * --(Route cables via flying saucer up to under BF.)-- == 2018-01-09 == * Center IM. * Set up optical lever for leveling optic. * Hang optic. * Hang RM. * Install bottom section of SS. * Cable up OSEMs. * Do inventory of ballast masses. == 2017-12-25 == * Recover from power outage. * Calibrate BF LVDT. * Route in-vac cabling for OSEMs. * Route in-vac cabling for steppers * Fix SR2 RTM. * Wipe/blow frame. * Drape clean bag. * Reinstall L-brackets * Crane in IM. * Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor). == 2017-12-18 == * Assemble SR2 IP. * Final assembly. * Test IP picos. * Assembly frame stuff: * Center and immobilize optical table. * Adjust verticality of assembly frame. * Remove internal crossbars for SF and BF. * Adjust external crossbar heights. * Install red bars and IM ring. * Ship L-brackets to Mitaka and remachine. == 2017-12-11 == * Double check prism heights. * Do mirror gluing. * Check mirror gluing. * Hassle Miyo-kun for pico driver. * Set up for testing IP with pico driver. * Make pico cable. * Glue Misumi plug in movable mass (also glue remaining disks in IM flags). * Find BF accessories. * Weigh BF. * Find in-vac cables: * 2 x Type 3-6m * 4 3 x Type 4-1.5m * 7 x Type 2-2m * Set up SR2 rack * Get ADC/DAC/DIO cards * Get cables/cards for SR2 * Get BIO white cables x 10 * Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc. * Get SR2 real-time model running (Yamamoto-san). * Move trolley system from SR3 to SR2. * Find and attach feedthroughs. * Find circuit boards for geophones (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.) * Check if they have sockets soldered on. (Yes.) * Check if they come with hex posts. (Yes.) == 2017-11-27 == * Bring SR2 into tunnel. * Bring spare mirror box into tunnel. * Bring 6 L-brackets for chassis boxes into tunnel. * Bring cleaned parts from near ultrasonic cleaner into tunnel. * Move SR2 rack into position. * Set up SR2 rack * Add L-brackets to new whitening filter and two HPCDs (one in BS rack). * Get ADC/DAC/DIO cards. * Get cables/cards for SR2: * 5 DSub-37 cables (tent) * 5 DSub-15M to DSub-9M adapter cables (tent) * 2 DSub-9 FF gender benders (for LVDTs) * BNC-LEMO adapter (for LVDT sig gen) * Screw boxes into rack. * Update SR2 suspension items doc. * Run cables to assembly frame. * Find feedthroughs. * Transfer spare mirror to spare mirror box. * Transfer SR2 to good mirror box. * Find mirror gluing items: * Prism micrometer stages * Prism jigs * Lenses for inspecting scribe lines == 2017-11-13 == * Huge cleanup! * Find collet from maraging rod adapter. * Make notes on where ladder needs to go. * Take photos and make notes about where SR2 safety bars need to go (time permitting, also SR3). * Wrap and label BS parts. * Bring work table from PR2 area. * Bring racks from SRM area. * Look for needed screws, especially for IM. * Find mirror gluing items. * Prisms * Secondary prisms * Magnets * Magnet bases * Magnet jigs * Balance * Stirrers * Mixing dishes * EP30 |
VIS Type B SR To-Do List - Archived Items
2018-02-05
- Check PR3 area for Ø10x10 IM flag magnets.
- Make in-air pico adapter cables.
- Label in-air pico adapter cables.
- Cable IM picos through to driver.
- Cable BF LVDT through to driver.
- Check LVDT resistances and inductances at various points from coils to rack.
- Cable BF FR stepper through to driver.
- Calibrate LVDT.
- Test IM picos and BF yaw pico.
- Install ballast mass in BF.
- Remove stuff from changing area in preparation for installing SS sheet.
2018-01-28
- Install IRM.
- Adjust IM OSEMs.
- Cable IM OSEMs.
- Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
- Install pre-calculated BF trim mass.
- Lift
2018-01-22
- —(Debug keystone issue.)—
- Cable yaw pico and LVDT on new BF.
- Calibrate LVDT on new BF.
- Adjust IM/RM/SR total mass and pitch/roll balance.
- Test IM picos.
- Prepare SR3 area for PI test.
- Check BF yaw pico.
2018-01-15
- Set up SR2 rack
Get more 1-m power cables and connect up remaining boxes. (No orange ones left - used yellow temporarily.)
- Run LAN and power cables for stepper drivers.
Cable RM OSEMs to rack.
Setup QPD and cable to rack.
Fix links to OPLEVINF filter screen from chain screen.
Initialize gains and matrix elements for SR2 OL.
Wash parts for flying saucers.
Test nuts for flying saucers.
- Order more nuts for flying saucers.
- Add DRIVEALIGN button to overview screen.
Check sizes and in-stock numbers of screws for geophones.
- 20 x M8*35 (need 3*16=48)
- 35 x M8*30 (need 3*8=24)
- 4 x Viton disks (need 4)
- 123 M8 washers (need 3*24=72)
Do TFs from RM OSEMS to OL pitch/roll.
Make IM OSEMs.
Install load gauge adapter.
Lift IM/RM/SR with LGA, check/adjust total mass and pitch/yaw balance.
Crane in BF.
Install BF-IRM rods and top plate of IRM.
Install BF-IM rod with flying saucer.
Hook IM.
Route cables via flying saucer up to under BF.
2018-01-09
- Center IM.
- Set up optical lever for leveling optic.
- Hang optic.
- Hang RM.
- Install bottom section of SS.
- Cable up OSEMs.
- Do inventory of ballast masses.
2017-12-25
- Recover from power outage.
- Calibrate BF LVDT.
- Route in-vac cabling for OSEMs.
- Route in-vac cabling for steppers
- Fix SR2 RTM.
- Wipe/blow frame.
- Drape clean bag.
- Reinstall L-brackets
- Crane in IM.
- Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
2017-12-18
- Assemble SR2 IP.
- Final assembly.
- Test IP picos.
- Assembly frame stuff:
- Center and immobilize optical table.
- Adjust verticality of assembly frame.
- Remove internal crossbars for SF and BF.
- Adjust external crossbar heights.
- Install red bars and IM ring.
- Ship L-brackets to Mitaka and remachine.
2017-12-11
- Double check prism heights.
- Do mirror gluing.
- Check mirror gluing.
- Hassle Miyo-kun for pico driver.
- Set up for testing IP with pico driver.
- Make pico cable.
- Glue Misumi plug in movable mass (also glue remaining disks in IM flags).
- Find BF accessories.
- Weigh BF.
- Find in-vac cables:
- 2 x Type 3-6m
- 4 3 x Type 4-1.5m
- 7 x Type 2-2m
- Set up SR2 rack
- Get ADC/DAC/DIO cards
- Get cables/cards for SR2
- Get BIO white cables x 10
- Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.
- Get SR2 real-time model running (Yamamoto-san).
- Move trolley system from SR3 to SR2.
- Find and attach feedthroughs.
- Find circuit boards for geophones (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.)
- Check if they have sockets soldered on. (Yes.)
- Check if they come with hex posts. (Yes.)
2017-11-27
- Bring SR2 into tunnel.
- Bring spare mirror box into tunnel.
- Bring 6 L-brackets for chassis boxes into tunnel.
- Bring cleaned parts from near ultrasonic cleaner into tunnel.
- Move SR2 rack into position.
- Set up SR2 rack
- Add L-brackets to new whitening filter and two HPCDs (one in BS rack).
- Get ADC/DAC/DIO cards.
- Get cables/cards for SR2:
- 5 DSub-37 cables (tent)
- 5 DSub-15M to DSub-9M adapter cables (tent)
- 2 DSub-9 FF gender benders (for LVDTs)
- BNC-LEMO adapter (for LVDT sig gen)
- Screw boxes into rack.
- Update SR2 suspension items doc.
- Run cables to assembly frame.
- Find feedthroughs.
- Transfer spare mirror to spare mirror box.
- Transfer SR2 to good mirror box.
- Find mirror gluing items:
- Prism micrometer stages
- Prism jigs
- Lenses for inspecting scribe lines
2017-11-13
- Huge cleanup!
- Find collet from maraging rod adapter.
- Make notes on where ladder needs to go.
- Take photos and make notes about where SR2 safety bars need to go (time permitting, also SR3).
- Wrap and label BS parts.
- Bring work table from PR2 area.
- Bring racks from SRM area.
- Look for needed screws, especially for IM.
- Find mirror gluing items.
- Prisms
- Secondary prisms
- Magnets
- Magnet bases
- Magnet jigs
- Balance
- Stirrers
- Mixing dishes
- EP30