Differences between revisions 3 and 4
Revision 3 as of 2017-08-28 08:08:04
Size: 131
Editor: MarkBarton
Comment:
Revision 4 as of 2017-11-17 11:24:26
Size: 646
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
== 2017-08-21 == == 2017-11-13 ==
 * Huge cleanup!
 * Find collet from maraging rod adapter.
 * Make notes on where ladder needs to go.
 * Take photos and make notes about where SR2 safety bars need to go (time permitting, also SR3).
 * Wrap and label BS parts.
 * Bring work table from PR2 area.
 * Bring racks from SRM area.
 * Look for needed screws, especially for IM.
 * Find mirror gluing items.
  * Prisms
  * Secondary prisms
  * Magnets
  * Magnet bases
  * Magnet jigs
  * Balance
  * Stirrers
  * Mixing dishes
  * EP30

VIS Type B SR To-Do List - Archived Items

SR To-Do Items

BS To-Do Items

2017-11-13

  • Huge cleanup!
  • Find collet from maraging rod adapter.
  • Make notes on where ladder needs to go.
  • Take photos and make notes about where SR2 safety bars need to go (time permitting, also SR3).
  • Wrap and label BS parts.
  • Bring work table from PR2 area.
  • Bring racks from SRM area.
  • Look for needed screws, especially for IM.
  • Find mirror gluing items.
    • Prisms
    • Secondary prisms
    • Magnets
    • Magnet bases
    • Magnet jigs
    • Balance
    • Stirrers
    • Mixing dishes
    • EP30

KAGRA/Subgroups/VIS/TypeB/ToDoOldSR (last edited 2019-01-04 15:39:49 by MarkBarton)