Line 7: Line 7:
== 2017-08-21 == == 2017-11-27 ==
 * Bring SR2 into tunnel.
 * Bring spare mirror box into tunnel.
 * Bring 6 L-brackets for chassis boxes into tunnel.
 * Bring cleaned parts from near ultrasonic cleaner into tunnel.
 * Move SR2 rack into position.
 * Set up SR2 rack
  * Add L-brackets to new whitening filter and two HPCDs (one in BS rack).
  * Get ADC/DAC/DIO cards.
  * Get cables/cards for SR2:
   * 5 DSub-37 cables (tent)
   * 5 DSub-15M to DSub-9M adapter cables (tent)
   * 2 DSub-9 FF gender benders (for LVDTs)
   * BNC-LEMO adapter (for LVDT sig gen)
  * Screw boxes into rack.
  * Update SR2 suspension items doc.
  * Run cables to assembly frame.
  * Find feedthroughs.
 * Transfer spare mirror to spare mirror box.
 * Transfer SR2 to good mirror box.
 * Find mirror gluing items:
  * Prism micrometer stages
  * Prism jigs
  * Lenses for inspecting scribe lines

== 2017-11-13 ==
 * Huge cleanup!
 * Find collet from maraging rod adapter.
 * Make notes on where ladder needs to go.
 * Take photos and make notes about where SR2 safety bars need to go (time permitting, also SR3).
 * Wrap and label BS parts.
 * Bring work table from PR2 area.
 * Bring racks from SRM area.
 * Look for needed screws, especially for IM.
 * Find mirror gluing items.
  * Prisms
  * Secondary prisms
  * Magnets
  * Magnet bases
  * Magnet jigs
  * Balance
  * Stirrers
  * Mixing dishes
  * EP30

VIS Type B SR To-Do List - Archived Items

SR To-Do Items

BS To-Do Items

2017-11-27

  • Bring SR2 into tunnel.
  • Bring spare mirror box into tunnel.
  • Bring 6 L-brackets for chassis boxes into tunnel.
  • Bring cleaned parts from near ultrasonic cleaner into tunnel.
  • Move SR2 rack into position.
  • Set up SR2 rack
    • Add L-brackets to new whitening filter and two HPCDs (one in BS rack).
    • Get ADC/DAC/DIO cards.
    • Get cables/cards for SR2:
      • 5 DSub-37 cables (tent)
      • 5 DSub-15M to DSub-9M adapter cables (tent)
      • 2 DSub-9 FF gender benders (for LVDTs)
      • BNC-LEMO adapter (for LVDT sig gen)
    • Screw boxes into rack.
    • Update SR2 suspension items doc.
    • Run cables to assembly frame.
    • Find feedthroughs.
  • Transfer spare mirror to spare mirror box.
  • Transfer SR2 to good mirror box.
  • Find mirror gluing items:
    • Prism micrometer stages
    • Prism jigs
    • Lenses for inspecting scribe lines

2017-11-13

  • Huge cleanup!
  • Find collet from maraging rod adapter.
  • Make notes on where ladder needs to go.
  • Take photos and make notes about where SR2 safety bars need to go (time permitting, also SR3).
  • Wrap and label BS parts.
  • Bring work table from PR2 area.
  • Bring racks from SRM area.
  • Look for needed screws, especially for IM.
  • Find mirror gluing items.
    • Prisms
    • Secondary prisms
    • Magnets
    • Magnet bases
    • Magnet jigs
    • Balance
    • Stirrers
    • Mixing dishes
    • EP30