Line 7: Line 7:
== 2017-11-27 == === 2018-08-27 ===
==== SR3 ====
 * Hook LBB.
 * Tune IP.

==== SR2 ====
 * Adjust ballast/trim mass, with reserve for yaw stepper.
 * Cable/test PI items (LVDTs, steppers, geophones; Kozu-kun++).
 * Set damper height.
 * Add arc weights, adjust IP.
 
==== SRM ====
 * Get feedthroughs.
 * Get arc weights.
 * Set up pitch-setting OL.

=== 2018-08-20 ===
==== SR3 ====
 * Continuation of damper test.

==== SR2 ====
 * Improve SF/... cabling.
 * Stage LBB damper rings in tank.
 
==== SRM ====
 * Check gluing result (success!).
 * Assemble RM.
 * Add IM ballast masses (we forgot this before).
 * Get parts from AOL and set up new pitch-setting OL.
 * Hang metal mass.
 * Hang RM.

=== 2018-08-15 ===
==== SR3 ====
 * Controls work (Enzo and team).
 * Diagonalize OL (Terrence).
 * Do SF damper test (Hatoya-san).

=== 2018-08-06 ===
==== SR3 ====
 * Align OSEMs and do final adjustment of pitch.
 * Do TFs.
 * Close control loops.
 * Set up final TILT OL.
==== SR2 ====
 * Fix alignment of Cu segments and damper ring.
 * Do height budget, decide keystone height.
 * Install SF cap masses with reserve for cables and yaw stepper.
 * Cabling.
==== SRM ====
 * Position, align and clean AF.
 * Install IM ring and IM.
 * Glue prisms and magnet standoffs.

=== 2018-07-30 ===
==== SR3 ====
 * Check pitch.
 * Set up new temporary OL with QBD and calibrate.
 * Run power to steppers and picos and test them.
 * Offload BF GAS LVDT offset.
 * Align IM OSEMs (we started this but screwed it up initially).
 * Debug stuck bit in BIO (it was a bad 37-pin gender changer).
==== SR2 ====
 * Fix SS alignment.
 * Check bounce frequency.
 * Install Cu segments and damper ring.

=== 2018-07-24 ===
==== SR3 ====
 * Remove tank lid leaving service ring.
 * Move feedthroughs.
 * Lay new cables.
 * Calibrate PI LVDT and FR actuation.
 * Remove safety bar and unlock suspension.
 * Remove First Contact.
 * Restore payload alignment, especially pitch.
 * Cable geophones.
==== SR2 ====
 * Add cable clamps to PI.
 * Crane in PI.
 * Change to stronger CuBe spring.
==== SRM ====
 * Do inventory of parts.

=== 2018-07-17 ===
==== Main Sequence ====
 * Find LBB damper rods and associated parts.
 * Check/restore verticality of security structure.
 * Set SF damper magnet ring height.
 * Check/correct IP LVDT polarities.
 * Calibrate IP FR sensing.
 * Set safety screw and safety nut on F0 keystone; remove Kapton tape.
 * Set up optical lever.
 * Check/restore alignment of payload, especially optic pitch.
 * Do token TFs (time permitting).
 * Lock F0 keystone.
 * Lock suspension laterally except for SF level.
 * Add IM-RM safety bar.
 * Disconnect all cables at inside of feedthroughs.
 * Remove top of tank (including service ring).
 * Set tank jacks to nominal height (50 mm).
 * Lift suspension.
 * Install LBB damper rods.
 * Crane suspension into tank.
 * Hook LBB damper rods.
 * Replace tank lid and service ring.

==== F0/LBB/Tank Stuff ====
 * Help Sato-san with swapping IP in PI #2.
 * Crane IP to second floor.
 
=== 2018-07-09 ===
 * Get studs for arc weights.
 * Get laser level, preferably the red Tajita one.
 * Finish in-vacuum cabling.
 * Correct flipped connections in SR3 PI LVDTs.
 * Tune PI LVDT driver box.
 * Plug in spare sat amps.
 * Install geophones.
 * Install arc weights.
 * Tune IP.
 * Make three in-air stepper splitter cables for SR2, SR3 and SRM.

==== F0/LBB Stuff ====
 * Clear space for PI #2 (SRM) work.

==== Software Etc ====
 * Check S-numbers of BS sat amps and SR sat amps returned to Mozumi, and update electronic items lists.
 * Review/improve macro file fixes for split models; write klog; submit changes to SVN.

=== 2018-07-02 ===
 * Decide whether to install ballast mass inside SF.
 * Install SF ballast mass inside or on top, less reserve for cables.
 * Route cables around SF up to flying saucer and PI.
 * Finalize SF trim mass.
 * Unclamp assembly frame at IM level.
 * Unlock and center IP.
 * Characterize more blades.
 * Build filter in PI #1 for SR2.

=== 2018-06-25 ===
 * Reconfigure top of AF.
 * Apply magnets to damper ring with template.
 * Put damper magnet ring on top of SF, with spacers to protect Cu segments.
 * Crane in SR3 PI, adding SS poles and damper ring rods.
 * Set up for tuning SR2 PI.
 * Hook SF and SF damper ring, adjust F0 compression, SF ballast.
 
=== 2018-06-18 ===
 * Tweak BF total trim masses.
 * Cable, test SF FR.
 * Replace ceramic thrust bearing in PI #3 with metal one (do PI #1 as well if time).
 * Install AC bandpass filters in SR3 WD filters.
 * Check coil filter gains for compensation of magnet polarities (confirm SR3 IM, set and confirm SR2 and SR3 TM).
 * Fix link to SUS_CUS_BSFM_BIO.adl in VIS_CUST_TYPEB_OVERALL.adl.
 * Rename VIS_CUST_BS_BIO.adl screen to VIS_CUST_TYPEB_BIO.adl and adjust links.
 * Fix hardwiring to BS in VIS_CUST_TYPEB_IP_WD_AC_BANDLIM.adl (ACC H2 and ACC H3 sections).
 * Fix broken CD State field in VIS_CUST_TYPEB_OVERALL.adl.

=== 2018-06-11 ===
==== Main Sequence ====
 * Debug stuff.
  * Finish debugging BS BIO.
  * Make SR3, SR2, SRM like BS.
  * Swap the LPCD to HPCD.
  * Fix IM coil gains to compensate magnet polarities.
 * Add Cu ring, cable clamps to SF cap.
 * Set up software pico drivers for SR3_IM and SR3_BF.
 * Install L-brackets on BF and SF rings.
 * Add extra spacers under SF to give more jack range.
 * Suspend BF/... section.
 * Adjust BF trim mass.
 * Route cables through SF-BF flying saucer up to bottom of SF.
 * Readjust BF trim mass.
 * Readjust payload.

==== Software ====
 * Fix white channels on BS screens (will probably be an issue for SRx models if/when split).

=== 2018-06-04 ===
==== Main Sequence ====
 * Cable and test BF cap picos.
 * Build up security structure to SF level.
 * Crane in SF and remove cap.
 * Hook BF.
 * Characterize final F0 blades.
 * Build F0 for PI #3.

=== 2018-05-28 ===
==== Main Sequence ====
 * Modify and clean Promec masses at Mitaka (making threaded holes unthreaded to allow stacking).
 * Test LVDT driver repaired by Tanaka-san.
 * Install internal ballast masses.
 * Install cap ballast masses.
 * Build LBB blade units.
 * Install LBB blade units in PIs #3 and #1.
 * Add cable clamps to PI #3.
 * Remove prototype blades from PI #3.
 * Install other half of SR3 LBB top ring.
 * Install maraging rod receptacles in SR3 LBB damper rings.
 * Install damping filters for IM OSEMs.
 * Finish four half-assembled geophones.

=== 2018-05-21 ===
==== Main Sequence ====
 * Cable and (re-)test TM OSEMs, IM picos, BF yaw pico, BF LVDT and FR.
 * Install IRM sides, and IM OSEMs.
 * Center IM OSEMs (in/out and laterally)
 * Route all cables to underneath BF.
 * Add BF internal ballast mass.
 * Add BF cap.
==== F0/LBB Stuff ====
 * Create LBB blade sets (if screws are available)
 * Install LBB blade sets on PIs #1 and #3 (if possible).
 * Install cable clamps on PIs #1 and #3.
 * Put LBB damper rings in SR3 tank.

== 2018-05-14 ==
=== Main Sequence ===
 * Crane in BF.
 * Add IRM top plate, maraging rod, flying saucer.
 * Suspend IM, check pitch, roll and vertical, adjust trim mass.
 * Final prep for F0 prototype blade test (5/14)
 * F0 prototype blade test with Takahashi-san (5/15 or TBD)
 * Characterize top filter prototype blades.
 * Decide final top filter blade parameters and order.
 * Characterize LBB blades.

=== 2018-05-07 ===
 * Rehang optic and RM.
 * Install lower section of SS.
 * Install IM-BF section of SS.
 * Prepare for IM/.. weighing.
 * Disassemble PI #3 in SRM area.
 * Prepare for F0 blade prototype characterization.
 * Get SRM mushroom installed.

=== 2018-04-23 ===
 * Get 8xM8x40 screws for feedthroughs.
 * Attach feedthroughs to AF.
 * Get LVDT driver with one good and one bad card for Tanaka-san.
 * Start SR3 Hang
  * Find wires, wire clamp items.
  * Install winch system.
  * Move KOACH filters, mirror box and table to near AF.
  * Hang optic.
  * Set up OL.
  * Set optic pitch.
 * Clean parts (cable clamp bases, etc, etc).

=== 2018-04-16 ===
 * Move SF and BF for SRM out of the way.
 * Check results of gluing.
 * Glue new metal prism on SR3 to replace one with failed bond.
 * Build 1xRM
 * Calibrate OSEMs.
 * Start SR3 Hang
  * Reset assembly frame crossbars to correct heights.
  * Center the optical table.
  * Align the assembly frame vertically.
  * Install IM ring and IM.
 * Find fourth feedthrough for SR2, 4 more for SR3.

=== 2018-04-09 ===
 * Glue prisms and magnet/standoff assemblies on SR3.
 * Glue ferromagnetic disks into IM flags (now have two sets of six, for SR3 and SRM).
 * Calibration of LVDT and FR for 2 BFs and 2 SFs.
 * Two IMs mostly built.

=== 2018-04-02 ===
 * Get SR3 model running.
 * Receive SR3, fix FC.
 * Make magnet-standoff assemblies (two sets, for SR3 and SRM).
 * Inventory of payload parts.
 * Finish mechanical adjustment of 2 BFs and 2 SFs.
 * Finish rack work (except for missing boxes).

=== 2018-03-26 ===
 * Tune one BF, rebuild one BF, test two SFs.
 * Do SR3 in-air cables.
 * Run power supply directly to SR3 (instead of via SR2).
 * SR2 TFs.

=== 2018-03-19 ===
 * Make one geophone pod, mostly finish 4 more.
 * Set dummy BS to soak.
 * Assemble 12 OSEMs.
 * Make pair of in-air pico cables (for SRM).

=== 2018-03-12 ===
 * (Close up BS tank.)
 * Add boxes to SR3/SRM racks.
 * Disassemble two BFs and characterize all SF BF blades.
 * Correct SF-BF yaw issue.
 * Send OSEM stuff to Mitaka.
 * Prepare for geophone assembly.
 * Pack, send off SF caps for remachining.


=== 2018-03-05 ===
 * (Remove the non-vacuum-compatible ballast mass from the BS tank.)
 * (Secure all the PR2 feedthrough connections with screws.)
 * Get empty rack for SRM.
 * Calibrate the SR2 SF LVDT sensing and actuation, and the FR.
 * Measure the bounce frequencies of the SF with and without the cap, and the bounce frequency of the BF.
 * Tried different SF caps.

=== 2018-02-26 ===
 * (Remove LBB temporary ballast masses from BS chamber.)
 * Route cables up to under SF.
 * Cable/test BF cap picos.

=== 2018-02-19 ===

 * Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
 * Claose BF, runs cables upwards.
 * Weigh/trim BF/... .
 * Build up AF and add SF.
 * Suspend BF.

=== 2018-02-13 ===
 * Build IRM around IM.
 * Cable/test/adjust IM OSEMs.
 * Send OSEM parts back to Mitaka so that Shoda-san can assemble them in Mitaka.
 * Test/calibrate BF FR.
 * Derive matrices.
 * Screen and model fixes.


=== 2018-02-05 ===
 * Empty out gowning cleanroom in prep for roof work.
 * Check PR3 area for Ø10x10 IM flag magnets.
 * Make in-air pico adapter cables.
 * Label in-air pico adapter cables.
 * Cable IM picos through to driver.
 * Cable BF LVDT through to driver.
 * Check LVDT resistances and inductances at various points from coils to rack.
 * Cable BF FR stepper through to driver.
 * Calibrate LVDT.
 * Test IM picos and BF yaw pico.
 * Install ballast mass in BF.
 * Remove stuff from changing area in preparation for installing SS sheet.


=== 2018-01-28 ===
 * Install IRM.
 * Adjust IM OSEMs.
 * Cable IM OSEMs.
 * Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
 * Install pre-calculated BF trim mass.
 * Lift

=== 2018-01-22 ===
 * —(Debug keystone issue.)—
 * Cable yaw pico and LVDT on new BF.
 * Calibrate LVDT on new BF.
 * Adjust IM/RM/SR total mass and pitch/roll balance.
 * Test IM picos.
 * Prepare SR3 area for PI test.
 * Check BF yaw pico.

=== 2018-01-15 ===
 * Set up SR2 rack
  * Get more 1-m power cables and connect up remaining boxes. (No orange ones left - used yellow temporarily.)
  * Run LAN and power cables for stepper drivers.
 * Cable RM OSEMs to rack.
 * Setup QPD and cable to rack.
 * Fix links to OPLEVINF filter screen from chain screen.
 * Initialize gains and matrix elements for SR2 OL.
 * Wash parts for flying saucers.
 * Test nuts for flying saucers.
 * Order more nuts for flying saucers.
 * Add DRIVEALIGN button to overview screen.
 * Check sizes and in-stock numbers of screws for geophones.
  * 20 x M8*35 (need 3*16=48)
  * 35 x M8*30 (need 3*8=24)
  * 4 x Viton disks (need 4)
  * 123 M8 washers (need 3*24=72)
 * Do TFs from RM OSEMS to OL pitch/roll.
 * Make IM OSEMs.
 * Install load gauge adapter.
 * Lift IM/RM/SR with LGA, check/adjust total mass and pitch/yaw balance.
 * Crane in BF.
 * Install BF-IRM rods and top plate of IRM.
 * Install BF-IM rod with flying saucer.
 * Hook IM.
 * Route cables via flying saucer up to under BF.

=== 2018-01-09 ===
 * Center IM.
 * Set up optical lever for leveling optic.
 * Hang optic.
 * Hang RM.
 * Install bottom section of SS.
 * Cable up OSEMs.
 * Do inventory of ballast masses.

=== 2017-12-25 ===
 * Recover from power outage.
 * Calibrate BF LVDT.
 * Route in-vac cabling for OSEMs.
 * Route in-vac cabling for steppers
 * Fix SR2 RTM.
 * Wipe/blow frame.
 * Drape clean bag.
 * Reinstall L-brackets
 * Crane in IM.
 * Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).

=== 2017-12-18 ===
 * Assemble SR2 IP.
  * Final assembly.
  * Test IP picos.
 * Assembly frame stuff:
  * Center and immobilize optical table.
  * Adjust verticality of assembly frame.
  * Remove internal crossbars for SF and BF.
  * Adjust external crossbar heights.
  * Install red bars and IM ring.
  * Ship L-brackets to Mitaka and remachine.

=== 2017-12-11 ===
 * Double check prism heights.
 * Do mirror gluing.
 * Check mirror gluing.
 * Hassle Miyo-kun for pico driver.
 * Set up for testing IP with pico driver.
 * Make pico cable.
 * Glue Misumi plug in movable mass (also glue remaining disks in IM flags).
 * Find BF accessories.
 * Weigh BF.
 * Find in-vac cables:
  * 2 x Type 3-6m
  * 4 3 x Type 4-1.5m
  * 7 x Type 2-2m
 * Set up SR2 rack
  * Get ADC/DAC/DIO cards
  * Get cables/cards for SR2
  * Get BIO white cables x 10
  * Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.
  * Get SR2 real-time model running (Yamamoto-san).
  * Move trolley system from SR3 to SR2.
 * Find and attach feedthroughs.
 * Find circuit boards for geophones (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.)
  * Check if they have sockets soldered on. (Yes.)
  * Check if they come with hex posts. (Yes.)

=== 2017-11-27 ===
Line 32: Line 479:
== 2017-11-13 == === 2017-11-13 ===

VIS Type B SR To-Do List - Archived Items

SR To-Do Items

BS To-Do Items

2018-08-27

SR3

  • Hook LBB.
  • Tune IP.

SR2

  • Adjust ballast/trim mass, with reserve for yaw stepper.
  • Cable/test PI items (LVDTs, steppers, geophones; Kozu-kun++).
  • Set damper height.
  • Add arc weights, adjust IP.

SRM

  • Get feedthroughs.
  • Get arc weights.
  • Set up pitch-setting OL.

2018-08-20

SR3

  • Continuation of damper test.

SR2

  • Improve SF/... cabling.
  • Stage LBB damper rings in tank.

SRM

  • Check gluing result (success!).
  • Assemble RM.
  • Add IM ballast masses (we forgot this before).
  • Get parts from AOL and set up new pitch-setting OL.
  • Hang metal mass.
  • Hang RM.

2018-08-15

SR3

  • Controls work (Enzo and team).
  • Diagonalize OL (Terrence).
  • Do SF damper test (Hatoya-san).

2018-08-06

SR3

  • Align OSEMs and do final adjustment of pitch.
  • Do TFs.
  • Close control loops.
  • Set up final TILT OL.

SR2

  • Fix alignment of Cu segments and damper ring.
  • Do height budget, decide keystone height.
  • Install SF cap masses with reserve for cables and yaw stepper.
  • Cabling.

SRM

  • Position, align and clean AF.
  • Install IM ring and IM.
  • Glue prisms and magnet standoffs.

2018-07-30

SR3

  • Check pitch.
  • Set up new temporary OL with QBD and calibrate.
  • Run power to steppers and picos and test them.
  • Offload BF GAS LVDT offset.
  • Align IM OSEMs (we started this but screwed it up initially).
  • Debug stuck bit in BIO (it was a bad 37-pin gender changer).

SR2

  • Fix SS alignment.
  • Check bounce frequency.
  • Install Cu segments and damper ring.

2018-07-24

SR3

  • Remove tank lid leaving service ring.
  • Move feedthroughs.
  • Lay new cables.
  • Calibrate PI LVDT and FR actuation.
  • Remove safety bar and unlock suspension.
  • Remove First Contact.
  • Restore payload alignment, especially pitch.
  • Cable geophones.

SR2

  • Add cable clamps to PI.
  • Crane in PI.
  • Change to stronger CuBe spring.

SRM

  • Do inventory of parts.

2018-07-17

Main Sequence

  • Find LBB damper rods and associated parts.
  • Check/restore verticality of security structure.
  • Set SF damper magnet ring height.
  • Check/correct IP LVDT polarities.
  • Calibrate IP FR sensing.
  • Set safety screw and safety nut on F0 keystone; remove Kapton tape.
  • Set up optical lever.
  • Check/restore alignment of payload, especially optic pitch.
  • Do token TFs (time permitting).
  • Lock F0 keystone.
  • Lock suspension laterally except for SF level.
  • Add IM-RM safety bar.
  • Disconnect all cables at inside of feedthroughs.
  • Remove top of tank (including service ring).
  • Set tank jacks to nominal height (50 mm).
  • Lift suspension.
  • Install LBB damper rods.
  • Crane suspension into tank.
  • Hook LBB damper rods.
  • Replace tank lid and service ring.

F0/LBB/Tank Stuff

  • Help Sato-san with swapping IP in PI #2.
  • Crane IP to second floor.

2018-07-09

  • Get studs for arc weights.
  • Get laser level, preferably the red Tajita one.
  • Finish in-vacuum cabling.
  • Correct flipped connections in SR3 PI LVDTs.
  • Tune PI LVDT driver box.
  • Plug in spare sat amps.
  • Install geophones.
  • Install arc weights.
  • Tune IP.
  • Make three in-air stepper splitter cables for SR2, SR3 and SRM.

F0/LBB Stuff

  • Clear space for PI #2 (SRM) work.

Software Etc

  • Check S-numbers of BS sat amps and SR sat amps returned to Mozumi, and update electronic items lists.
  • Review/improve macro file fixes for split models; write klog; submit changes to SVN.

2018-07-02

  • Decide whether to install ballast mass inside SF.
  • Install SF ballast mass inside or on top, less reserve for cables.
  • Route cables around SF up to flying saucer and PI.
  • Finalize SF trim mass.
  • Unclamp assembly frame at IM level.
  • Unlock and center IP.
  • Characterize more blades.
  • Build filter in PI #1 for SR2.

2018-06-25

  • Reconfigure top of AF.
  • Apply magnets to damper ring with template.
  • Put damper magnet ring on top of SF, with spacers to protect Cu segments.
  • Crane in SR3 PI, adding SS poles and damper ring rods.
  • Set up for tuning SR2 PI.
  • Hook SF and SF damper ring, adjust F0 compression, SF ballast.

2018-06-18

  • Tweak BF total trim masses.
  • Cable, test SF FR.
  • Replace ceramic thrust bearing in PI #3 with metal one (do PI #1 as well if time).
  • Install AC bandpass filters in SR3 WD filters.
  • Check coil filter gains for compensation of magnet polarities (confirm SR3 IM, set and confirm SR2 and SR3 TM).
  • Fix link to SUS_CUS_BSFM_BIO.adl in VIS_CUST_TYPEB_OVERALL.adl.
  • Rename VIS_CUST_BS_BIO.adl screen to VIS_CUST_TYPEB_BIO.adl and adjust links.
  • Fix hardwiring to BS in VIS_CUST_TYPEB_IP_WD_AC_BANDLIM.adl (ACC H2 and ACC H3 sections).
  • Fix broken CD State field in VIS_CUST_TYPEB_OVERALL.adl.

2018-06-11

Main Sequence

  • Debug stuff.
    • Finish debugging BS BIO.
    • Make SR3, SR2, SRM like BS.
    • Swap the LPCD to HPCD.
    • Fix IM coil gains to compensate magnet polarities.
  • Add Cu ring, cable clamps to SF cap.
  • Set up software pico drivers for SR3_IM and SR3_BF.
  • Install L-brackets on BF and SF rings.
  • Add extra spacers under SF to give more jack range.
  • Suspend BF/... section.
  • Adjust BF trim mass.
  • Route cables through SF-BF flying saucer up to bottom of SF.
  • Readjust BF trim mass.
  • Readjust payload.

Software

  • Fix white channels on BS screens (will probably be an issue for SRx models if/when split).

2018-06-04

Main Sequence

  • Cable and test BF cap picos.
  • Build up security structure to SF level.
  • Crane in SF and remove cap.
  • Hook BF.
  • Characterize final F0 blades.
  • Build F0 for PI #3.

2018-05-28

Main Sequence

  • Modify and clean Promec masses at Mitaka (making threaded holes unthreaded to allow stacking).
  • Test LVDT driver repaired by Tanaka-san.
  • Install internal ballast masses.
  • Install cap ballast masses.
  • Build LBB blade units.
  • Install LBB blade units in PIs #3 and #1.
  • Add cable clamps to PI #3.
  • Remove prototype blades from PI #3.
  • Install other half of SR3 LBB top ring.
  • Install maraging rod receptacles in SR3 LBB damper rings.
  • Install damping filters for IM OSEMs.
  • Finish four half-assembled geophones.

2018-05-21

Main Sequence

  • Cable and (re-)test TM OSEMs, IM picos, BF yaw pico, BF LVDT and FR.
  • Install IRM sides, and IM OSEMs.
  • Center IM OSEMs (in/out and laterally)
  • Route all cables to underneath BF.
  • Add BF internal ballast mass.
  • Add BF cap.

F0/LBB Stuff

  • Create LBB blade sets (if screws are available)
  • Install LBB blade sets on PIs #1 and #3 (if possible).
  • Install cable clamps on PIs #1 and #3.
  • Put LBB damper rings in SR3 tank.

2018-05-14

Main Sequence

  • Crane in BF.
  • Add IRM top plate, maraging rod, flying saucer.
  • Suspend IM, check pitch, roll and vertical, adjust trim mass.
  • Final prep for F0 prototype blade test (5/14)
  • F0 prototype blade test with Takahashi-san (5/15 or TBD)
  • Characterize top filter prototype blades.
  • Decide final top filter blade parameters and order.
  • Characterize LBB blades.

2018-05-07

  • Rehang optic and RM.
  • Install lower section of SS.
  • Install IM-BF section of SS.
  • Prepare for IM/.. weighing.
  • Disassemble PI #3 in SRM area.
  • Prepare for F0 blade prototype characterization.
  • Get SRM mushroom installed.

2018-04-23

  • Get 8xM8x40 screws for feedthroughs.
  • Attach feedthroughs to AF.
  • Get LVDT driver with one good and one bad card for Tanaka-san.
  • Start SR3 Hang
    • Find wires, wire clamp items.
    • Install winch system.
    • Move KOACH filters, mirror box and table to near AF.
    • Hang optic.
    • Set up OL.
    • Set optic pitch.
  • Clean parts (cable clamp bases, etc, etc).

2018-04-16

  • Move SF and BF for SRM out of the way.
  • Check results of gluing.
  • Glue new metal prism on SR3 to replace one with failed bond.
  • Build 1xRM
  • Calibrate OSEMs.
  • Start SR3 Hang
    • Reset assembly frame crossbars to correct heights.
    • Center the optical table.
    • Align the assembly frame vertically.
    • Install IM ring and IM.
  • Find fourth feedthrough for SR2, 4 more for SR3.

2018-04-09

  • Glue prisms and magnet/standoff assemblies on SR3.
  • Glue ferromagnetic disks into IM flags (now have two sets of six, for SR3 and SRM).
  • Calibration of LVDT and FR for 2 BFs and 2 SFs.
  • Two IMs mostly built.

2018-04-02

  • Get SR3 model running.
  • Receive SR3, fix FC.
  • Make magnet-standoff assemblies (two sets, for SR3 and SRM).
  • Inventory of payload parts.
  • Finish mechanical adjustment of 2 BFs and 2 SFs.
  • Finish rack work (except for missing boxes).

2018-03-26

  • Tune one BF, rebuild one BF, test two SFs.
  • Do SR3 in-air cables.
  • Run power supply directly to SR3 (instead of via SR2).
  • SR2 TFs.

2018-03-19

  • Make one geophone pod, mostly finish 4 more.
  • Set dummy BS to soak.
  • Assemble 12 OSEMs.
  • Make pair of in-air pico cables (for SRM).

2018-03-12

  • (Close up BS tank.)
  • Add boxes to SR3/SRM racks.
  • Disassemble two BFs and characterize all SF BF blades.
  • Correct SF-BF yaw issue.
  • Send OSEM stuff to Mitaka.
  • Prepare for geophone assembly.
  • Pack, send off SF caps for remachining.

2018-03-05

  • (Remove the non-vacuum-compatible ballast mass from the BS tank.)
  • (Secure all the PR2 feedthrough connections with screws.)
  • Get empty rack for SRM.
  • Calibrate the SR2 SF LVDT sensing and actuation, and the FR.
  • Measure the bounce frequencies of the SF with and without the cap, and the bounce frequency of the BF.
  • Tried different SF caps.

2018-02-26

  • (Remove LBB temporary ballast masses from BS chamber.)
  • Route cables up to under SF.
  • Cable/test BF cap picos.

2018-02-19

  • Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
  • Claose BF, runs cables upwards.
  • Weigh/trim BF/... .
  • Build up AF and add SF.
  • Suspend BF.

2018-02-13

  • Build IRM around IM.
  • Cable/test/adjust IM OSEMs.
  • Send OSEM parts back to Mitaka so that Shoda-san can assemble them in Mitaka.
  • Test/calibrate BF FR.
  • Derive matrices.
  • Screen and model fixes.

2018-02-05

  • Empty out gowning cleanroom in prep for roof work.
  • Check PR3 area for Ø10x10 IM flag magnets.
  • Make in-air pico adapter cables.
  • Label in-air pico adapter cables.
  • Cable IM picos through to driver.
  • Cable BF LVDT through to driver.
  • Check LVDT resistances and inductances at various points from coils to rack.
  • Cable BF FR stepper through to driver.
  • Calibrate LVDT.
  • Test IM picos and BF yaw pico.
  • Install ballast mass in BF.
  • Remove stuff from changing area in preparation for installing SS sheet.

2018-01-28

  • Install IRM.
  • Adjust IM OSEMs.
  • Cable IM OSEMs.
  • Do TFs from IM OSEMs to IM OSEMs, OL pitch/yaw.
  • Install pre-calculated BF trim mass.
  • Lift

2018-01-22

  • —(Debug keystone issue.)—
  • Cable yaw pico and LVDT on new BF.
  • Calibrate LVDT on new BF.
  • Adjust IM/RM/SR total mass and pitch/roll balance.
  • Test IM picos.
  • Prepare SR3 area for PI test.
  • Check BF yaw pico.

2018-01-15

  • Set up SR2 rack
    • Get more 1-m power cables and connect up remaining boxes. (No orange ones left - used yellow temporarily.)
    • Run LAN and power cables for stepper drivers.
  • Cable RM OSEMs to rack.
  • Setup QPD and cable to rack.
  • Fix links to OPLEVINF filter screen from chain screen.
  • Initialize gains and matrix elements for SR2 OL.
  • Wash parts for flying saucers.
  • Test nuts for flying saucers.
  • Order more nuts for flying saucers.
  • Add DRIVEALIGN button to overview screen.
  • Check sizes and in-stock numbers of screws for geophones.
    • 20 x M8*35 (need 3*16=48)
    • 35 x M8*30 (need 3*8=24)
    • 4 x Viton disks (need 4)
    • 123 M8 washers (need 3*24=72)
  • Do TFs from RM OSEMS to OL pitch/roll.
  • Make IM OSEMs.
  • Install load gauge adapter.
  • Lift IM/RM/SR with LGA, check/adjust total mass and pitch/yaw balance.
  • Crane in BF.
  • Install BF-IRM rods and top plate of IRM.
  • Install BF-IM rod with flying saucer.
  • Hook IM.
  • Route cables via flying saucer up to under BF.

2018-01-09

  • Center IM.
  • Set up optical lever for leveling optic.
  • Hang optic.
  • Hang RM.
  • Install bottom section of SS.
  • Cable up OSEMs.
  • Do inventory of ballast masses.

2017-12-25

  • Recover from power outage.
  • Calibrate BF LVDT.
  • Route in-vac cabling for OSEMs.
  • Route in-vac cabling for steppers
  • Fix SR2 RTM.
  • Wipe/blow frame.
  • Drape clean bag.
  • Reinstall L-brackets
  • Crane in IM.
  • Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).

2017-12-18

  • Assemble SR2 IP.
    • Final assembly.
    • Test IP picos.
  • Assembly frame stuff:
    • Center and immobilize optical table.
    • Adjust verticality of assembly frame.
    • Remove internal crossbars for SF and BF.
    • Adjust external crossbar heights.
    • Install red bars and IM ring.
    • Ship L-brackets to Mitaka and remachine.

2017-12-11

  • Double check prism heights.
  • Do mirror gluing.
  • Check mirror gluing.
  • Hassle Miyo-kun for pico driver.
  • Set up for testing IP with pico driver.
  • Make pico cable.
  • Glue Misumi plug in movable mass (also glue remaining disks in IM flags).
  • Find BF accessories.
  • Weigh BF.
  • Find in-vac cables:
    • 2 x Type 3-6m
    • 4 3 x Type 4-1.5m
    • 7 x Type 2-2m
  • Set up SR2 rack
    • Get ADC/DAC/DIO cards
    • Get cables/cards for SR2
    • Get BIO white cables x 10
    • Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.
    • Get SR2 real-time model running (Yamamoto-san).
    • Move trolley system from SR3 to SR2.
  • Find and attach feedthroughs.
  • Find circuit boards for geophones (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.)
    • Check if they have sockets soldered on. (Yes.)
    • Check if they come with hex posts. (Yes.)

2017-11-27

  • Bring SR2 into tunnel.
  • Bring spare mirror box into tunnel.
  • Bring 6 L-brackets for chassis boxes into tunnel.
  • Bring cleaned parts from near ultrasonic cleaner into tunnel.
  • Move SR2 rack into position.
  • Set up SR2 rack
    • Add L-brackets to new whitening filter and two HPCDs (one in BS rack).
    • Get ADC/DAC/DIO cards.
    • Get cables/cards for SR2:
      • 5 DSub-37 cables (tent)
      • 5 DSub-15M to DSub-9M adapter cables (tent)
      • 2 DSub-9 FF gender benders (for LVDTs)
      • BNC-LEMO adapter (for LVDT sig gen)
    • Screw boxes into rack.
    • Update SR2 suspension items doc.
    • Run cables to assembly frame.
    • Find feedthroughs.
  • Transfer spare mirror to spare mirror box.
  • Transfer SR2 to good mirror box.
  • Find mirror gluing items:
    • Prism micrometer stages
    • Prism jigs
    • Lenses for inspecting scribe lines

2017-11-13

  • Huge cleanup!
  • Find collet from maraging rod adapter.
  • Make notes on where ladder needs to go.
  • Take photos and make notes about where SR2 safety bars need to go (time permitting, also SR3).
  • Wrap and label BS parts.
  • Bring work table from PR2 area.
  • Bring racks from SRM area.
  • Look for needed screws, especially for IM.
  • Find mirror gluing items.
    • Prisms
    • Secondary prisms
    • Magnets
    • Magnet bases
    • Magnet jigs
    • Balance
    • Stirrers
    • Mixing dishes
    • EP30