Line 2: Line 2:
[[KAGRA/Subgroups/VIS/TypeB/ToDoOldSR|Archived To-Do Items]]
Line 3: Line 4:
[[../ToDoOldSR|Archived To-Do Items]] [[#EveryWeek|Every Week]]
Line 5: Line 6:
[[#EveryWeek |Every Week]]

[[#ComingWeeks |Coming Weeks]]
[[#ComingWeeks|Coming Weeks]]
Line 18: Line 17:
 * Get stuff from [[../WishList]]  * Get stuff from ../WishList
Line 21: Line 20:
Line 29: Line 29:
Line 30: Line 31:
 * Bread boards for SR -> すぐ見積り依頼  * Bread boards for SR -> Orderd. delivery date:10/18-20
Line 33: Line 34:
 * PEEK collet for "Small hexagon"(cable clamp) -> すぐ見積り依頼  * PEEK collet for "Small hexagon"(cable clamp) -> need modification.
Line 37: Line 38:
  * Change the length -> すぐ見積り依頼   * Change the length -> Orderd. delivery date:10/
Line 42: Line 43:
  * Need to change the height
 * SR assembly frame -> 月曜日に見積り依頼
  * Need to change the height -> watiting second quote.
 * SR assembly frame -> Ordered. delivery date:9/27-29
Line 62: Line 63:
  * Need to check whether we can put a full ring into the chamber from the side flanges or not. -> 至急確認

  * Need to check whether we can put a full ring into the chamber from the side flanges or not. -> need modification

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-08-28

SR Prep Tasks

Design/Purchasing

  • Do rough mass budget for SR2/SR3/SRM.
  • Design SR assembly frame.
  • Design final SF ballast masses (Fabian).

Order now

  • Bread boards for SR -> Orderd. delivery date:10/18-20

  • Include installation work in the contract
  • Total budget = 5MJPY
  • PEEK collet for "Small hexagon"(cable clamp) -> need modification.

Need simple design changes

  • SUS wires(3 types) for the LBB
    • Change the length -> Orderd. delivery date:10/

  • Receptacles for Bread board damper
    • There is a mistake in the PROMEC drawing.
    • Hirata-san will make a new 2D drawing
  • IM wire clamps for SR
    • Need to change the height -> watiting second quote.

  • SR assembly frame -> Ordered. delivery date:9/27-29

    • Mark is checking the design from Fabian
    • We should order the parts necessary to modify the BS assembly frame to the SR2 assembly frame

Need Fabian's input

  • Cable clamps for BF,SF and PI -> 方式を決める

    • Design change for the PI clamps, because the SR PIs are NIKHEF ones.
  • Ballast masses for BF and SF
  • 製作に2週間程度
  • 10月頭にTop Filterの最適荷重を実測。それに合わせて発注。それまでにデザインは用意しておく。
    • 測定に必要な物品の準備 -> 月曜日に高橋さんと相談

Need more discussion/checks

  • Blade spring assembly for LBB
    • Check the load of the LBB and decide the design load of the springs
    • Correct the length
    • Scale the width of the current blades to design the new blades -> 高橋さんと相談

      • SR用LBBの重さを確認
  • Bread board damper rings
    • Need to check whether we can put a full ring into the chamber from the side flanges or not. -> need modification

Electronics

  • Get cables/cards for SR3:
    • 5 DSub-37 cables (tent)
    • 5 DSub-15M to DSub-9M adapter cables (tent)
    • 3 DIO cards (tent)
    • 2 DSub-9 FF gender benders (for LVDTs)
    • extra ADC card(s)?
    • extra DAC card(s)?
    • BNC-LEMO adapter (for LVDTs)
    • etc