[[KAGRA/Subgroups/VIS/TypeB/ToDoOldSR|Archived To-Do Items]]
Line 3: Line 4:
[[../ToDoOldSR|Archived To-Do Items]] [[#EveryWeek|Every Week]]
Line 5: Line 6:
[[#EveryWeek |Every Week]]

[[#ComingWeeks |Coming Weeks]]
[[#ComingWeeks|Coming Weeks]]
Line 18: Line 17:
 * Get stuff from [[../WishList]]  * Get stuff from ../WishList
Line 21: Line 20:
== 2017-08-28 ==
== 2017-11-13 ==
 * Find collet from maraging rod adapter.
 * Wrap and label BS parts.
 * Bring work table from PR2 area.
 * Bring racks from SRM area.
 * Take photos and make notes about where SR2 safety bars need to go (time permitting, also SR3).
 * Look for needed screws, especially for IM.
 * Bring SR2 into tunnel?
 * Find mirror gluing items.
  * Mirror
  * Mirror box
  * --(Prisms)--
  * Secondary prisms
  * Magnets
  * Magnet bases
  * Prism micrometer stages
  * --(Prism jigs)--
  * Magnet jigs
  * --(Balance)--
  * --(Stirrers)--
  * --(Mixing dishes)--
  * Lenses for inspecting scribe lines
  * Procedure document.
  * EP30
  * Glass beads
 * Rehearse mirror gluing.
Line 23: Line 49:
Line 27: Line 54:
 * Design SR assembly frame.
Line 29: Line 55:

Line 30: Line 58:
 * Bread boards for SR -> すぐ見積り依頼  * Bread boards for SR -> Orderd. delivery date:10/18-20
Line 33: Line 61:
 * PEEK collet for "Small hexagon"(cable clamp) -> すぐ見積り依頼  * PEEK collet for "Small hexagon"(cable clamp) -> need modification.
Line 37: Line 65:
  * Change the length -> すぐ見積り依頼   * Change the length -> Orderd. delivery date:10/
Line 42: Line 70:
  * Need to change the height
 * SR assembly frame -> 月曜日に見積り依頼
  * Need to change the height -> watiting second quote.
 * SR assembly frame -> Ordered. delivery date:9/27-29
Line 62: Line 90:
  * Need to check whether we can put a full ring into the chamber from the side flanges or not. -> 至急確認

  * Need to check whether we can put a full ring into the chamber from the side flanges or not. -> need modification

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-11-13

  • Find collet from maraging rod adapter.
  • Wrap and label BS parts.
  • Bring work table from PR2 area.
  • Bring racks from SRM area.
  • Take photos and make notes about where SR2 safety bars need to go (time permitting, also SR3).
  • Look for needed screws, especially for IM.
  • Bring SR2 into tunnel?
  • Find mirror gluing items.
    • Mirror
    • Mirror box
    • Prisms

    • Secondary prisms
    • Magnets
    • Magnet bases
    • Prism micrometer stages
    • Prism jigs

    • Magnet jigs
    • Balance

    • Stirrers

    • Mixing dishes

    • Lenses for inspecting scribe lines
    • Procedure document.
    • EP30
    • Glass beads
  • Rehearse mirror gluing.

SR Prep Tasks

Design/Purchasing

  • Do rough mass budget for SR2/SR3/SRM.
  • Design final SF ballast masses (Fabian).

Order now

  • Bread boards for SR -> Orderd. delivery date:10/18-20

  • Include installation work in the contract
  • Total budget = 5MJPY
  • PEEK collet for "Small hexagon"(cable clamp) -> need modification.

Need simple design changes

  • SUS wires(3 types) for the LBB
    • Change the length -> Orderd. delivery date:10/

  • Receptacles for Bread board damper
    • There is a mistake in the PROMEC drawing.
    • Hirata-san will make a new 2D drawing
  • IM wire clamps for SR
    • Need to change the height -> watiting second quote.

  • SR assembly frame -> Ordered. delivery date:9/27-29

    • Mark is checking the design from Fabian
    • We should order the parts necessary to modify the BS assembly frame to the SR2 assembly frame

Need Fabian's input

  • Cable clamps for BF,SF and PI -> 方式を決める

    • Design change for the PI clamps, because the SR PIs are NIKHEF ones.
  • Ballast masses for BF and SF
  • 製作に2週間程度
  • 10月頭にTop Filterの最適荷重を実測。それに合わせて発注。それまでにデザインは用意しておく。
    • 測定に必要な物品の準備 -> 月曜日に高橋さんと相談

Need more discussion/checks

  • Blade spring assembly for LBB
    • Check the load of the LBB and decide the design load of the springs
    • Correct the length
    • Scale the width of the current blades to design the new blades -> 高橋さんと相談

      • SR用LBBの重さを確認
  • Bread board damper rings
    • Need to check whether we can put a full ring into the chamber from the side flanges or not. -> need modification

Electronics

  • Get cables/cards for SR3:
    • 5 DSub-37 cables (tent)
    • 5 DSub-15M to DSub-9M adapter cables (tent)
    • 3 DIO cards (tent)
    • 2 DSub-9 FF gender benders (for LVDTs)
    • extra ADC card(s)?
    • extra DAC card(s)?
    • BNC-LEMO adapter (for LVDTs)
    • etc