Line 24: | Line 24: |
* Take SRM LVDT driver out of rack for Lucia. | |
Line 26: | Line 26: |
* Move unused beams and other clutter from -Y side of SR2 tank (second floor). * Open tank and move feedthroughs. * Reconnect in-vacuum cables. * Move in-air cables, with priority on IM OSEMs, then IM picos and BF/SF GAS and FRs. * Remove IM-RM safety bar. * Unlock and realign SF/... section. * Add arc weights and geophones. |
* Turn off KOACH filters in tank and see if BF keystone rises. * Install shelves in small rack, and put sat amps, drivers, etc inside. * Run power and network to pico drivers and steppers. * Test picos and steppers. * Adjust pitch/roll of IM with picos. * Offload BF GAS LVDT offset with FR stepper. * Add arc weights and geophones. (Might have to reserve one geophone for Fujii-Fun - check.) * Cable geophones. (Might have to reserve one cable for Fujii-kun - check.) |
Line 34: | Line 35: |
* More TFs. |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders, assembly frame.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-09-25
Etc
- Take SRM LVDT driver out of rack for Lucia.
SR2
- Turn off KOACH filters in tank and see if BF keystone rises.
- Install shelves in small rack, and put sat amps, drivers, etc inside.
- Run power and network to pico drivers and steppers.
- Test picos and steppers.
- Adjust pitch/roll of IM with picos.
- Offload BF GAS LVDT offset with FR stepper.
- Add arc weights and geophones. (Might have to reserve one geophone for Fujii-Fun - check.)
- Cable geophones. (Might have to reserve one cable for Fujii-kun - check.)
- Unlock and center IP.
- More TFs.
SRM
- Add TM OSEM cables.
- Set TM pitch and tighten clamps.
- Set RM pitch and tighten clamps.
- Remove winch system and restore items removed from top of IM.
- Suspend and weigh IM/... section.
- Add BF crossbars to SS.
- Build up SS to BF level.
- Suspend IM/... section and adjust ballast/trim masses.
- Install feedthroughs on AF (3 available; need to get a 4th).
- Arrange power to SRM rack and get it running.
Check the IRIG-B 9999xx fix has been applied (klog http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=6031).
SR3
Don't even think about doing anything with SR3.
SR Prep Tasks - To Be Scheduled
Tunnel
- Add SR3 LBB ballast mass.
- Install SR3 LEN OL.
- Rebuild PI #2 F0 for SRM.
- Retrieve BNC-Lemo cable from Nakano-kun.
- Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
- Install, cable SR3 PI yaw stepper.
- Correct flipped connections in SRM PI LVDTs.
- Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
- Check SR2, SR3 TM coil gains for magnet polarity compensation.
- Rebuild filter in PI #2 for SRM.
- Clean/Replace yoke in PI #2 for SRM.
- Install clamps on PI #2 for SRM.
- Install LBB blade units on PI #2 for SRM.
- Install geophone plates on PI #2 for SRM.
- Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.
Mitaka or remotely
- Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
- Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Review DAC channel requests.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Split SRx real-time models?
Ordering
See ../WishList .