Line 22: | Line 22: |
=== 2018-10-01 === ==== Etc ==== * Take SRM LVDT driver out of rack for Lucia. ==== SR2 ==== * --(Turn off KOACH filters in tank and see if BF keystone rises.)-- * --(Install shelves in small rack, and put sat amps, drivers, etc inside.)-- * --(Run power and network to pico drivers and steppers.)-- * --(Test picos.)-- * --(Test GAS steppers.)-- * --(Adjust pitch/roll of IM with picos.)-- * --(Offload BF GAS LVDT offset with FR stepper.)-- * Receive extra cables (Type 1 and 2). * Cable IP items: * Geophones * LVDTs * Steppers * Add arc weights and geophones. (Might have to reserve one geophone for Fujii-Fun - check.) * Test IP items. * Geophones * LVDTs * Steppers * Unlock and center IP. * More TFs. |
=== 2018-11-12 === ==== SRM ==== * LBB * Crane LBB ring sandwich to top of tank. * Set tank jacks to nominal height. * Main sequence * Do vertical height budget. * Cable/test IP LVDTs. * Cable/test IP FRs. * Unlock IP and center roughly. * Calibrate IP LVDTs. * Check/adjust alignment of SS. * Add arc weights and geophones (or extra mass equivalent to geophones). * Improve centering/tuning of IP and SS alignment. |
Line 46: | Line 37: |
==== SR2 (low priority) ==== * Set up OL pillar and shelf (with Akutsu-san). * Set up OL cabling. * Set up OL. === 2018-11-19 === |
|
Line 47: | Line 44: |
* --(Add TM OSEM cables.)-- * --(Set TM pitch and tighten clamps.)-- * Set RM pitch and tighten clamps. * Remove winch system and restore items removed from top of IM. * Add and adjust position of jacks at top level. * Suspend and weigh IM/... section. * Add BF crossbars to AF. * Build up SS to BF level. * Suspend IM/... section and adjust ballast/trim masses. * Install feedthroughs on AF (3 available; need to get a 4th). * Arrange power to SRM rack and get it running. * Check the IRIG-B 9999xx fix has been applied (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=6031||6031]]). |
* Make new geophones. * Cable/test geophones. * Disconnect cables. * Remove crossbars. * Crane suspension into tank. |
Line 60: | Line 50: |
==== SR3 ==== * ''Don't even '''think''' about doing anything with SR3.'' |
==== SR2 (not so low priority) ==== * Set up OL pillar and shelf (with Akutsu-san). * Set up OL cabling. * Set up OL. * Add more arc weights and tweak IP centering. * Replace two borrowed geophones. * Remove tape, writing etc on PI and PI items. * Add new feedthrough to lower part of tank (with Izumi-san-tachi). * Install cable for MIF pico on LBB (with Izumi-san-tachi). * Add ballast mass to LBB. * Install manual yaw adjuster. * Get top plate reduced? |
Line 68: | Line 67: |
* Add SR3 LBB ballast mass. * Install SR3 LEN OL. * Rebuild PI #2 F0 for SRM. * Retrieve BNC-Lemo cable from Nakano-kun. |
* Check which LVDT cards are in which boxes. |
Line 73: | Line 69: |
* Install, cable SR3 PI yaw stepper. | * Install, cable PI yaw steppers. |
Line 75: | Line 71: |
* Grab and configure a picomotor driver as SR2_BF 10.68.150.25. | |
Line 77: | Line 72: |
* Rebuild filter in PI #2 for SRM. * Clean/Replace yoke in PI #2 for SRM. * Install clamps on PI #2 for SRM. * Install LBB blade units on PI #2 for SRM. * Install geophone plates on PI #2 for SRM. |
|
Line 89: | Line 79: |
* Set up SR2 Guardian. |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders, assembly frame.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-11-12
SRM
- LBB
- Crane LBB ring sandwich to top of tank.
- Set tank jacks to nominal height.
- Main sequence
- Do vertical height budget.
- Cable/test IP LVDTs.
- Cable/test IP FRs.
- Unlock IP and center roughly.
- Calibrate IP LVDTs.
- Check/adjust alignment of SS.
- Add arc weights and geophones (or extra mass equivalent to geophones).
- Improve centering/tuning of IP and SS alignment.
SR2 (low priority)
- Set up OL pillar and shelf (with Akutsu-san).
- Set up OL cabling.
- Set up OL.
2018-11-19
SRM
- Make new geophones.
- Cable/test geophones.
- Disconnect cables.
- Remove crossbars.
- Crane suspension into tank.
SR2 (not so low priority)
- Set up OL pillar and shelf (with Akutsu-san).
- Set up OL cabling.
- Set up OL.
- Add more arc weights and tweak IP centering.
- Replace two borrowed geophones.
- Remove tape, writing etc on PI and PI items.
- Add new feedthrough to lower part of tank (with Izumi-san-tachi).
- Install cable for MIF pico on LBB (with Izumi-san-tachi).
- Add ballast mass to LBB.
- Install manual yaw adjuster.
- Get top plate reduced?
SR Prep Tasks - To Be Scheduled
Tunnel
- Check which LVDT cards are in which boxes.
- Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
- Install, cable PI yaw steppers.
- Correct flipped connections in SRM PI LVDTs.
- Check SR2, SR3 TM coil gains for magnet polarity compensation.
- Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.
Mitaka or remotely
- Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
- Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Install damping filters for SR2.
- Review DAC channel requests.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Split SRx real-time models?
Ordering
See ../WishList .