Differences between revisions 110 and 113 (spanning 3 versions)
Revision 110 as of 2018-10-06 21:01:38
Size: 3260
Editor: MarkBarton
Comment:
Revision 113 as of 2018-10-22 10:11:23
Size: 3003
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
=== 2018-10-07 ===
==== Etc ====
 *
=== 2018-10-22 ===
Line 26: Line 24:
 * Get DC power supplies and cable from Shimoda-San and take into the tunnel.
 * Arrange power to SRM rack and get it running.
 * Check the IRIG-B 9999xx fix has been applied (klog [[http://klog.icrr.u-tokyo.ac.jp/osl/index.php?r=6031||6031]]).
 * Cable and test BF LVDT and FR.
 * Double-check level of BF (with bubble level).
 * Set up OL to target optic.
 * Tweak pitch of IM with picos.
 * Install IRM side panels with OSEMs.
 * Adjust OSEMs laterally and in/out.
 * Install calculated ballast mass.
 * Weigh BF/... section and adjust trim mass to fix pitch/roll.
 * Anchor cables to BF cap.
 * Rebuild PI #2 F0 for SRM.
 * Replace yoke in F0.
 * Install clamps on PI .
 * Install LBB blade units on PI.
 * Install geophone plates on PI.
 * Main sequence
  * Adjust H2 and H3 OSEMs laterally and in/out.
  * Weigh BF/... section and adjust trim mass to fix pitch/roll.
  * Anchor cables to BF cap.
  * Install SF crossbars.
  * Build up SS to SF ring.
  * Bring in SF.
  * Hook BF/... .
 * PI
  * Choose and install CuBe spring.?
  * Replace yoke in F0.?
  * Install LBB blade units on PI.?
  * Install geophone plates on PI.?
 * Electronics
  * Scavenge HPCDs from SR2 and SR3.
  * Organize to get LPCDs modified.
Line 46: Line 42:
 * Receive extra cables (Type 1 and 2).
 * Cable IP items:
  * Geophones
  * LVDTs
  * Steppers
 * Add arc weights and geophones. (Might have to reserve one geophone for Fujii-Fun - check.)
 * Test IP items.
  * Geophones
  * LVDTs
  * Steppers
 * Unlock and center IP.
 * More TFs.
 * More TFs
 * Add more arc weights?
 * Do control filter design and installation.
 * Do measurement of yaw torque required for F0 yaw adjustment.
 * Gather items for SR2 OL.
Line 59: Line 48:
==== SR3 ====
 * Realign TILT OL.
 * Align LEN OL.
 * Diagonalize/calibrate LEN OL.

=== 2018-10-14 ===
Line 66: Line 49:
 *
==== SRM (top priority) ====
 * Install SF crossbars.
 * Build up SS to SF ring.
 * Bring in SF.
 * Hook
 * Tidy up:
  * Gather all PR/SR gluing tools and clean/label/organize them.
  * Move safety bar stuff to portable cleanroom between SR2 and SR3.
  * Clear space under SR3 stairs.
  * Etc, etc, etc.
 * Monitor AF disassembly.
 * Get SR2 optical table moved to SR3 area (under stairs).
 * Move cables; set up for geophone testing.
 * Make more feedthrough adaptors.

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders, assembly frame.
  • Tidy tools, parts.
  • Get stuff from ../WishList

Coming Weeks

2018-10-22

SRM (top priority)

  • Main sequence
    • Adjust H2 and H3 OSEMs laterally and in/out.
    • Weigh BF/... section and adjust trim mass to fix pitch/roll.
    • Anchor cables to BF cap.
    • Install SF crossbars.
    • Build up SS to SF ring.
    • Bring in SF.
    • Hook BF/... .
  • PI
    • Choose and install CuBe spring.?

    • Replace yoke in F0.?
    • Install LBB blade units on PI.?
    • Install geophone plates on PI.?
  • Electronics
    • Scavenge HPCDs from SR2 and SR3.
    • Organize to get LPCDs modified.

SR2 (low priority)

  • More TFs
  • Add more arc weights?
  • Do control filter design and installation.
  • Do measurement of yaw torque required for F0 yaw adjustment.
  • Gather items for SR2 OL.

Etc

  • Tidy up:
    • Gather all PR/SR gluing tools and clean/label/organize them.
    • Move safety bar stuff to portable cleanroom between SR2 and SR3.
    • Clear space under SR3 stairs.
    • Etc, etc, etc.
  • Monitor AF disassembly.
  • Get SR2 optical table moved to SR3 area (under stairs).
  • Move cables; set up for geophone testing.
  • Make more feedthrough adaptors.

SR Prep Tasks - To Be Scheduled

Tunnel

  • Add SR3 LBB ballast mass.
  • Install SR3 LEN OL.
  • Retrieve BNC-Lemo cable from Nakano-kun.
  • Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
  • Install, cable SR3 PI yaw stepper.
  • Correct flipped connections in SRM PI LVDTs.
  • Check SR2, SR3 TM coil gains for magnet polarity compensation.
  • Clean/Replace yoke in PI #2 for SRM.
  • Install clamps on PI #2 for SRM.
  • Install LBB blade units on PI #2 for SRM.
  • Install geophone plates on PI #2 for SRM.
  • Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

Mitaka or remotely

  • Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
  • Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
  • Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
  • (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
  • Set up SR2 Guardian.
  • Install damping filters for SR2.
  • Review DAC channel requests.
  • Set up SR2 Guardian.
  • Install damping filters for SR2.
  • Split SRx real-time models?

Ordering

See ../WishList .

KAGRA/Subgroups/VIS/TypeB/ToDoSR (last edited 2019-01-04 15:25:56 by MarkBarton)