Line 2: Line 2:
[[KAGRA/Subgroups/VIS/TypeB/ToDoOldSR|Archived To-Do Items]]
Line 4: Line 3:
[[#EveryWeek|Every Week]] This list has been merged into the common Type B list: [[../ToDo]].
Line 6: Line 5:
[[#ComingWeeks|Coming Weeks]]

[[#SRPrepTasks|Preparation for SR Installation]]

<<Anchor(EveryWeek)>>

== Every Week ==
=== Facilities ===
 * Vacuum and roll floor.
 * Wipe ladders.
 * Tidy tools, parts.
 * Get stuff from ../WishList

<<Anchor(ComingWeeks)>>

== 2017-12-11 ==
 * Double check prism heights.
 * Do mirror gluing.
 * Assemble SR2 IP.
  * Set up for testing IP with BS pico driver.
  * Make pico cable.
  * Assemble IP.
  * Test IP picos.
 * Weigh BF.
  * Find accessories.
  * Do weighing.
 * Find in-vac cables:
  * 2 x Type 3-6m
  * 1 x Type 3-2m
  * 4 x Type 4-1.5m
  * 5 x Type 1-2m
  * 7 x Type 2-2m
 * Set up SR2 rack
  * Get ADC/DAC/DIO cards. (Done?)
  * Hassle Miyo-kun for pico and stepper drivers.
  * Get Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.
  * Get cables/cards for SR2. (Done?)
  * Find and attach feedthroughs.
 * Adjust verticality of assembly frame; center and immobilize optical table.

<<Anchor(SRPrepTasks)>>

== SR Prep Tasks - To Be Scheduled ==
 * Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
 * Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
 * Design final SF ballast masses (Fabian).
 * Get safety bars moved.
 * Get air hose connection moved.

=== Design/Purchasing ===
 * Lots of stuff - see Hirata-san's spreadsheet.

==== Order now ====
 * Bread boards for SR -> Orderd. delivery date:10/18-20
 * Include installation work in the contract
 * Total budget = 5MJPY
 * PEEK collet for "Small hexagon"(cable clamp) -> need modification.

==== Need simple design changes ====
 * Receptacles for Bread board damper
  * There is a mistake in the PROMEC drawing.
  * Hirata-san will make a new 2D drawing
 * IM wire clamps for SR
  * Need to change the height -> watiting second quote.

==== Need Fabian's input ====
 * Cable clamps for BF,SF and PI -> 方式を決める
  * Design change for the PI clamps, because the SR PIs are NIKHEF ones.
 * Ballast masses for BF and SF
 * 製作に2週間程度
 * 10月頭にTop Filterの最適荷重を実測。それに合わせて発注。それまでにデザインは用意しておく。
  * 測定に必要な物品の準備 -> 月曜日に高橋さんと相談

==== Need more discussion/checks ====
 * Blade spring assembly for LBB
  * Check the load of the LBB and decide the design load of the springs
  * Correct the length
  * Scale the width of the current blades to design the new blades -> 高橋さんと相談
   * SR用LBBの重さを確認
 * Bread board damper rings
  * Need to check whether we can put a full ring into the chamber from the side flanges or not. -> need modification

=== Electronics ===
[[KAGRA/Subgroups/VIS/TypeB/ToDoOldSR|Archived SR To-Do Items]]

VIS Type B SR Near Term To-Do List

This list has been merged into the common Type B list: ../ToDo.

Archived SR To-Do Items

KAGRA/Subgroups/VIS/TypeB/ToDoSR (last edited 2019-01-04 15:25:56 by MarkBarton)