=== 2018-11-05 ===
==== SRM (top priority) ====
 * Etc
  * --(Solder more cables.)--
  * --(Ultrasonically clean more cables.)--
  * --(Work out optimum LPCD output resistance; get one box modified.)--
  * Work out how to change LPCD watchdog threshold; get one box modified.
 * LBB
  * --(Lay out LBB damper ring pieces near tank.)--
  * Put magnets on LBB magnet ring.
  * Move KOACH filters
  * Put LBB damper rings in tank.
  * Set tank jacks to nominal height.
 * Main sequence
  * --(Run DC power and network to SRM_IP stepper driver.)--
  * --(Add all steppers and picos to driver list and MEDM screens.)--
  * --(Prepare SF magnet ring.)--
  * --(Install #353 poles)--
  * --(Move NB-03 jacks down; disassemble top of AF.)--
  * --(Crane PI into AF.)--
  * --(Install F0-SF rod (#331) and flying saucer.)--
  * --(Route SF/... cables up to underside of F0.)--
  * --(Install weaker CuBe spring.)--
  * --(Add SF trim mass to leave 1.2 kg margin.)--
  * --(Tweak BF trim mass to compensate for new cables.)--
  * --(Measure bounce frequencies.)--
  * Do vertical height budget.
  
==== SR2 (low priority) ====
 * --(Unclamp LBB ring sandwich.)--
 * --(Set LBB receptacles to CAD positions.)--
 * --(Remove spacers; get LBB hanging.)--
=== 2018-12-10 ===
==== SRM high priority ====
 * Get LBB damper rods ready.
 * Do final check of optic pitch and suspension health.
 * Lock suspension everywhere except SF level.
 * Install IM-RM safety bar.
 * Remove arc weights and geophones.
 * Blow dust off with airgun.
 * Remove all pink tape, Kapton tape and writing on items.
 * Disconnect cables.
 * Remove tank lid + service ring.
 * Crane suspension into tank, adding LBB damper rods and hooking LBB damper.
 * Add tank lid + service ring.
 * Put safety tape and/or crossbars on assembly frame.

==== SR3 ====
 * Install/test new yaw mechanism.
 * Adjust height.
 * Realign OL.

==== SR2 ====
 * Install/test new yaw adjuster.
 * Adjust height.
 * Get top plate reduced?
 * Set up OL cabling.
Line 55: Line 48:
 * Remove tape, writing etc on PI and PI items.
Line 56: Line 50:
=== 2018-11-12 === === 2018-12-17 ===
Line 58: Line 52:
 * Main sequence
  * Cable/test IP LVDTs.
  * Cable/test IP FRs.
  * Unlock IP and center roughly.
  * Calibrate IP LVDTs.
  * Check/adjust alignment of SS.
  * Add arc weights and geophones (or extra mass equivalent to geophones).
  * Cable/test geophones.
  * Improve centering/tuning of IP and SS alignment.
 * Remove tank lid without service ring.
 * Remove First Contact.
 * Remove safety bar.
 * Unlock suspension (except for IP) and check alignment.
 * Move feedthroughs and in-air cabling over.
 * Test all electronics, starting with payload items.
 * Install/test new yaw mechanism.
 * Adjust height.
 * Check/adjust optic pitch; release LED to SR2.
 * Install Enomoto-kun's beam target plate (if available).
 * Install extension cord for pico drivers.
 * Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
 * Find one geophone cable ordered for SRM but missing.
 * Rearrange miswired geophone cable.
 * Rebuild defective geophone cable.
 * Seal geophones.
 * Install geophones and arc weights.
 * Center IP.

==== SR2 ====
 * Add new feedthrough to lower part of tank (with Izumi-san-tachi)?
 * Install cable for MIF pico on LBB (with Izumi-san-tachi)?
 * Add ballast mass to LBB.
Line 72: Line 80:
  * Check which LVDT cards are in which boxes.  * Check which LVDT cards are in which boxes.
Line 74: Line 82:
 * Install, cable PI yaw steppers.
 * Correct flipped connections in SRM PI LVDTs.
Line 81: Line 87:
 * Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
 * Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
Line 84: Line 88:
 * Set up SR2 Guardian.
Line 87: Line 90:
 * Set up SR2 Guardian.
 * Install damping filters for SR2.

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders, assembly frame.
  • Tidy tools, parts.
  • Get stuff from ../WishList

Coming Weeks

2018-12-10

SRM high priority

  • Get LBB damper rods ready.
  • Do final check of optic pitch and suspension health.
  • Lock suspension everywhere except SF level.
  • Install IM-RM safety bar.
  • Remove arc weights and geophones.
  • Blow dust off with airgun.
  • Remove all pink tape, Kapton tape and writing on items.
  • Disconnect cables.
  • Remove tank lid + service ring.
  • Crane suspension into tank, adding LBB damper rods and hooking LBB damper.
  • Add tank lid + service ring.
  • Put safety tape and/or crossbars on assembly frame.

SR3

  • Install/test new yaw mechanism.
  • Adjust height.
  • Realign OL.

SR2

  • Install/test new yaw adjuster.
  • Adjust height.
  • Get top plate reduced?
  • Set up OL cabling.
  • Set up OL.
  • Remove tape, writing etc on PI and PI items.

2018-12-17

SRM

  • Remove tank lid without service ring.
  • Remove First Contact.
  • Remove safety bar.
  • Unlock suspension (except for IP) and check alignment.
  • Move feedthroughs and in-air cabling over.
  • Test all electronics, starting with payload items.
  • Install/test new yaw mechanism.
  • Adjust height.
  • Check/adjust optic pitch; release LED to SR2.
  • Install Enomoto-kun's beam target plate (if available).
  • Install extension cord for pico drivers.
  • Find two geophone cables used by Okutomi-san. (I looked in the second floor EXV room but didn't find them - Mark.)
  • Find one geophone cable ordered for SRM but missing.
  • Rearrange miswired geophone cable.
  • Rebuild defective geophone cable.
  • Seal geophones.
  • Install geophones and arc weights.
  • Center IP.

SR2

  • Add new feedthrough to lower part of tank (with Izumi-san-tachi)?
  • Install cable for MIF pico on LBB (with Izumi-san-tachi)?
  • Add ballast mass to LBB.

SR Prep Tasks - To Be Scheduled

Tunnel

  • Check which LVDT cards are in which boxes.
  • Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
  • Check SR2, SR3 TM coil gains for magnet polarity compensation.
  • Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

Mitaka or remotely

  • Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
  • (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
  • Install damping filters for SR2.
  • Review DAC channel requests.
  • Split SRx real-time models?

Ordering