Differences between revisions 128 and 132 (spanning 4 versions)
Revision 128 as of 2018-11-24 17:48:40
Size: 2753
Editor: MarkBarton
Comment:
Revision 132 as of 2019-01-04 15:25:56
Size: 178
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
[[KAGRA/Subgroups/VIS/TypeB/ToDoOldSR|Archived To-Do Items]]
Line 4: Line 3:
[[#EveryWeek|Every Week]] This list has been merged into the common Type B list: [[../ToDo]].
Line 6: Line 5:
[[#ComingWeeks|Coming Weeks]]

[[#SRPrepTasks|Preparation for SR Installation]]

<<Anchor(EveryWeek)>>

== Every Week ==
==== Facilities ====
 * Vacuum and roll floor.
 * Wipe ladders, assembly frame.
 * Tidy tools, parts.
 * Get stuff from ../WishList

<<Anchor(ComingWeeks)>>
== Coming Weeks ==

=== 2018-11-26 ===
==== SR3 ====
 * Install extension cord for OL.

==== SRM ====
 * Clear space for SRM swap.
 * Ultrasonically clean metal parts associated with new SRM (except for solblack-coated ones) and tools.
 * Install IM-IRM safety bar.
 * Swap SRM glass mass.
 * Seal geophones.
 * Find two geophone cables used by Okutomi-san.
 * Rewire one geophone cable correctly.
 * Add extra ≈1 kg to SF cap and adjust tilt.
 * Center and fasten F0 yoke.
 * Calibrate F0 GAS LVDT.
 * Add arc weights and geophones.
 * Test geophones.
 * Improve centering/tuning of IP and SS alignment.
 * Disconnect cables.
 * Remove crossbars.
 * Crane suspension into tank.

==== SR2 (not so low priority) ====
 * Run extension cord for OL.
 * Set up OL cabling.
 * Set up OL.
 * Add more arc weights and tweak IP centering.
 * Replace two borrowed geophones.
 * Remove tape, writing etc on PI and PI items.
 * Add new feedthrough to lower part of tank (with Izumi-san-tachi).
 * Install cable for MIF pico on LBB (with Izumi-san-tachi).
 * Add ballast mass to LBB.
 * Install manual yaw adjuster.
 * Get top plate reduced?

<<Anchor(SRPrepTasks)>>

== SR Prep Tasks - To Be Scheduled ==
=== Tunnel ===
  * Check which LVDT cards are in which boxes.
 * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
 * Install, cable PI yaw steppers.
 * Correct flipped connections in SRM PI LVDTs.
 * Check SR2, SR3 TM coil gains for magnet polarity compensation.
 * Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.

=== Mitaka or remotely ===
 * Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
 * Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
 * Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
 * (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
 * Install damping filters for SR2.
 * Review DAC channel requests.
 * Set up SR2 Guardian.
 * Install damping filters for SR2.
 * Split SRx real-time models?

=== Ordering ===
See ../WishList .
[[KAGRA/Subgroups/VIS/TypeB/ToDoOldSR|Archived SR To-Do Items]]

VIS Type B SR Near Term To-Do List

This list has been merged into the common Type B list: ../ToDo.

Archived SR To-Do Items

KAGRA/Subgroups/VIS/TypeB/ToDoSR (last edited 2019-01-04 15:25:56 by MarkBarton)