VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2017-12-11
Double check prism heights.
Do mirror gluing.
- Check mirror gluing.
- Assemble SR2 IP.
- Set up for testing IP with BS pico driver.
- Make pico cable.
- Assemble IP.
- Test IP picos.
- Weigh BF.
- Find accessories.
- Do weighing.
- Find in-vac cables:
2 x Type 3-6m
- 1 x Type 3-2m
4 3 x Type 4-1.5m
- 5 x Type 1-2m
7 x Type 2-2m
- Set up SR2 rack
Get ADC/DAC/DIO cards
Get cables/cards for SR2
Get BIO white cables x 10
- Hassle Miyo-kun for pico and stepper drivers.
Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.
- Find and attach feedthroughs.
- Do inventory of ballast masses.
- Adjust verticality of assembly frame; center and immobilize optical table.
- Find circuit boards for geophones
- Check if they have sockets soldered on.
- Check if they come with hex posts.
- Find out (from Takahashi-san) specifications for geophone pod items:
- Screws for pod (cap-neck and neck-body).
- Cu O-rings for pod (two sizes)
- Hex posts and screws for circuit board (if needed).
- Sockets for circuit board (if needed).
- Viton O-ring for under geophone.
- Screws for immobilizing geophone (M4?).
- Screws for geophone to ingterface plate.
- Screws for interface plate to PI.
- Find or order geophone items.
SR Prep Tasks - To Be Scheduled
- Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
- Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
- Design final SF ballast masses (Fabian).
- Get safety bars moved.
- Get air hose connection moved.
Design/Purchasing
- Lots of stuff - see Hirata-san's spreadsheet.