2231
Comment:
|
2449
|
Deletions are marked like this. | Additions are marked like this. |
Line 26: | Line 26: |
* Set up for testing IP with BS pico driver. * Make pico cable. |
* --(Hassle Miyo-kun for pico driver.)-- * --(Set up for testing IP with pico driver.)-- * --(Make pico cable.)-- * Glue Misumi plug in movable mass (also glue remaining disks in IM flags). |
Line 30: | Line 32: |
* Weigh BF. * Find accessories. * Do weighing. |
* --(Weigh BF.)-- * --(Find accessories.)-- * --(Do weighing.)-- |
Line 34: | Line 36: |
* 2 x Type 3-6m | * --(2 x Type 3-6m )-- |
Line 36: | Line 38: |
* 4 x Type 4-1.5m | * --(4)-- 3 x Type 4-1.5m |
Line 38: | Line 40: |
* 7 x Type 2-2m * Set up SR2 rack |
* --(7 x Type 2-2m)-- * --(Set up SR2 rack)-- |
Line 43: | Line 45: |
* Hassle Miyo-kun for pico and stepper drivers. * Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc. * Find and attach feedthroughs. |
* --(Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.)-- * Get SR2 real-time model running (Yamamoto-san). |
Line 48: | Line 49: |
* Find circuit boards for geophones * Check if they have sockets soldered on. * Check if they come with hex posts. |
* Find and attach feedthroughs. * --(Find circuit boards for geophones)-- (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.) * --(Check if they have sockets soldered on.)-- (Yes.) * --(Check if they come with hex posts.)-- (Yes.) |
Line 54: | Line 56: |
* Hex posts and screws for circuit board (if needed). * Sockets for circuit board (if needed). |
|
Line 58: | Line 58: |
* Screws for geophone to ingterface plate. | * Screws for geophone to interface plate. |
Line 65: | Line 65: |
* Hassle Miyo-kun for stepper drivers. | |
Line 70: | Line 71: |
=== Design/Purchasing === * Lots of stuff - see Hirata-san's spreadsheet. |
* Get geophone circuit boards from Okutomi-san. * |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2017-12-11
Double check prism heights.
Do mirror gluing.
- Check mirror gluing.
- Assemble SR2 IP.
Hassle Miyo-kun for pico driver.
Set up for testing IP with pico driver.
Make pico cable.
- Glue Misumi plug in movable mass (also glue remaining disks in IM flags).
- Assemble IP.
- Test IP picos.
Weigh BF.
Find accessories.
Do weighing.
- Find in-vac cables:
2 x Type 3-6m
- 1 x Type 3-2m
4 3 x Type 4-1.5m
- 5 x Type 1-2m
7 x Type 2-2m
Set up SR2 rack
Get ADC/DAC/DIO cards
Get cables/cards for SR2
Get BIO white cables x 10
Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.
- Get SR2 real-time model running (Yamamoto-san).
- Do inventory of ballast masses.
- Adjust verticality of assembly frame; center and immobilize optical table.
- Find and attach feedthroughs.
Find circuit boards for geophones (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.)
Check if they have sockets soldered on. (Yes.)
Check if they come with hex posts. (Yes.)
- Find out (from Takahashi-san) specifications for geophone pod items:
- Screws for pod (cap-neck and neck-body).
- Cu O-rings for pod (two sizes)
- Viton O-ring for under geophone.
- Screws for immobilizing geophone (M4?).
- Screws for geophone to interface plate.
- Screws for interface plate to PI.
- Find or order geophone items.
SR Prep Tasks - To Be Scheduled
- Hassle Miyo-kun for stepper drivers.
- Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
- Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
- Design final SF ballast masses (Fabian).
- Get safety bars moved.
- Get air hose connection moved.
- Get geophone circuit boards from Okutomi-san.