Differences between revisions 17 and 48 (spanning 31 versions)
Revision 17 as of 2017-12-13 14:24:42
Size: 2231
Editor: EnzoTapia
Comment:
Revision 48 as of 2018-04-15 18:17:02
Size: 1679
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
== 2017-12-11 ==
 * --(Double check prism heights.)--
 * --(Do mirror gluing.)--
 * Check mirror gluing.
 * Assemble SR2 IP.
  * Set up for testing IP with BS pico driver.
  * Make pico cable.
  * Assemble IP.
  * Test IP picos.
 * Weigh BF.
  * Find accessories.
  * Do weighing.
 * Find in-vac cables:
  * 2 x Type 3-6m
  * 1 x Type 3-2m
  * 4 x Type 4-1.5m
  * 5 x Type 1-2m
  * 7 x Type 2-2m
 * Set up SR2 rack
  * --(Get ADC/DAC/DIO cards)--
  * --(Get cables/cards for SR2)--
  * --(Get BIO white cables x 10)--
  * Hassle Miyo-kun for pico and stepper drivers.
  * Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.
  * Find and attach feedthroughs.
 * Do inventory of ballast masses.
 * Adjust verticality of assembly frame; center and immobilize optical table.
 * Find circuit boards for geophones
  * Check if they have sockets soldered on.
  * Check if they come with hex posts.
 * Find out (from Takahashi-san) specifications for geophone pod items:
  * Screws for pod (cap-neck and neck-body).
  * Cu O-rings for pod (two sizes)
  * Hex posts and screws for circuit board (if needed).
  * Sockets for circuit board (if needed).
  * Viton O-ring for under geophone.
  * Screws for immobilizing geophone (M4?).
  * Screws for geophone to ingterface plate.
  * Screws for interface plate to PI.
 * Find or order geophone items.
==== Plan for week of 4/16 ====
 * Move SF and BF for SRM out of the way.
 * Check results of gluing.
 * Build 1xRM
 * Calibrate OSEMs.
 * Start SR3 Hang
  * Reset assembly frame crossbars to correct heights.
  * Center the optical table.
  * Align the assembly frame vertically.
  * Install IM ring and IM.
  * Hang optic.
  * Hang RM.
  * Cable RM OSEMs.

==== Plan for week of 4/23 ====
 * Clean parts (cable clamp bases, etc, etc; Hirata-san).
 * Observe KAGRA Phase 1 operations, assist if problems arise.
 * Continue SR3 hang.
Line 65: Line 43:
 * Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).  * Review Shoda-san's Guardian.
 * Review DIO stuff.
 * Review DAC channel requests.
 * Find out (from Takahashi-san) specifications for geophone pod items:
  * Screws for pod (cap-neck and neck-body).
  * Screws for geophone to interface plate.
  * Screws for interface plate to PI.
 * Find or order geophone items.
 * Get geophone circuit boards from Okutomi-san.
 * Find fourth feedthrough
Line 70: Line 57:

=== Design/Purchasing ===
 * Lots of stuff - see Hirata-san's spreadsheet.
 * Glue SR3.
 * Disassemble two top filters.
 * Rebuild three top filters.

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

Plan for week of 4/16

  • Move SF and BF for SRM out of the way.
  • Check results of gluing.
  • Build 1xRM
  • Calibrate OSEMs.
  • Start SR3 Hang
    • Reset assembly frame crossbars to correct heights.
    • Center the optical table.
    • Align the assembly frame vertically.
    • Install IM ring and IM.
    • Hang optic.
    • Hang RM.
    • Cable RM OSEMs.

Plan for week of 4/23

  • Clean parts (cable clamp bases, etc, etc; Hirata-san).
  • Observe KAGRA Phase 1 operations, assist if problems arise.
  • Continue SR3 hang.

SR Prep Tasks - To Be Scheduled

  • Review Shoda-san's Guardian.
  • Review DIO stuff.
  • Review DAC channel requests.
  • Find out (from Takahashi-san) specifications for geophone pod items:
    • Screws for pod (cap-neck and neck-body).
    • Screws for geophone to interface plate.
    • Screws for interface plate to PI.
  • Find or order geophone items.
  • Get geophone circuit boards from Okutomi-san.
  • Find fourth feedthrough
  • Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
  • Design final SF ballast masses (Fabian).
  • Get safety bars moved.
  • Get air hose connection moved.
  • Glue SR3.
  • Disassemble two top filters.
  • Rebuild three top filters.

KAGRA/Subgroups/VIS/TypeB/ToDoSR (last edited 2019-01-04 15:25:56 by MarkBarton)