2259
Comment:
|
1697
|
Deletions are marked like this. | Additions are marked like this. |
Line 21: | Line 21: |
== 2017-12-11 == * --(Double check prism heights.)-- * --(Do mirror gluing.)-- * Check mirror gluing. * Assemble SR2 IP. * Set up for testing IP with BS pico driver. * Make pico cable. * Assemble IP. * Test IP picos. * Weigh BF. * Find accessories. * Do weighing. |
== 2018-01-09 == * Center IM. * Set up optical lever for leveling optic. * Hang optic. * Hang RM. * Cable up OSEMs. |
Line 34: | Line 29: |
* --(2 x Type 3-6m )-- | |
Line 36: | Line 30: |
* --(4)-- 3 x Type 4-1.5m | |
Line 38: | Line 31: |
* --(7 x Type 2-2m)-- | |
Line 40: | Line 32: |
* --(Get ADC/DAC/DIO cards)-- * --(Get cables/cards for SR2)-- * --(Get BIO white cables x 10)-- * Hassle Miyo-kun for pico and stepper drivers. * --(Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.)-- * Find and attach feedthroughs. |
* Get more 1-m power cables and connect up remaining boxes. * Run LAN and power cables for stepper drivers. |
Line 47: | Line 35: |
* Adjust verticality of assembly frame; center and immobilize optical table. * Find circuit boards for geophones * Check if they have sockets soldered on. * Check if they come with hex posts. * Find out (from Takahashi-san) specifications for geophone pod items: * Screws for pod (cap-neck and neck-body). * Cu O-rings for pod (two sizes) * Hex posts and screws for circuit board (if needed). * Sockets for circuit board (if needed). * Viton O-ring for under geophone. * Screws for immobilizing geophone (M4?). * Screws for geophone to ingterface plate. * Screws for interface plate to PI. * Find or order geophone items. |
* Review Shoda-san's Guardian. * Decide if we're really going to renumber IP channels. * Review DIO stuff. * Review SR2 model (especially screens, macro text file). * Review DAC channel requests. |
Line 65: | Line 44: |
* Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor). | * Find out (from Takahashi-san) specifications for geophone pod items: * Screws for pod (cap-neck and neck-body). * --(Cu O-rings for pod (two sizes).)-- * Viton O-ring for under geophone. * Screws for immobilizing geophone (M4?). * Screws for geophone to interface plate. * Screws for interface plate to PI. * Find or order geophone items. * Get geophone circuit boards from Okutomi-san. * Find fourth feedthrough * Hassle Miyo-kun for stepper drivers. |
Line 70: | Line 59: |
=== Design/Purchasing === * Lots of stuff - see Hirata-san's spreadsheet. |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders.
- Tidy tools, parts.
Get stuff from ../WishList
2018-01-09
- Center IM.
- Set up optical lever for leveling optic.
- Hang optic.
- Hang RM.
- Cable up OSEMs.
- Find in-vac cables:
- 1 x Type 3-2m
- 5 x Type 1-2m
- Set up SR2 rack
- Get more 1-m power cables and connect up remaining boxes.
- Run LAN and power cables for stepper drivers.
- Do inventory of ballast masses.
- Review Shoda-san's Guardian.
- Decide if we're really going to renumber IP channels.
- Review DIO stuff.
- Review SR2 model (especially screens, macro text file).
- Review DAC channel requests.
SR Prep Tasks - To Be Scheduled
- Find out (from Takahashi-san) specifications for geophone pod items:
- Screws for pod (cap-neck and neck-body).
Cu O-rings for pod (two sizes).
- Viton O-ring for under geophone.
- Screws for immobilizing geophone (M4?).
- Screws for geophone to interface plate.
- Screws for interface plate to PI.
- Find or order geophone items.
- Get geophone circuit boards from Okutomi-san.
- Find fourth feedthrough
- Hassle Miyo-kun for stepper drivers.
- Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
- Design final SF ballast masses (Fabian).
- Get safety bars moved.
- Get air hose connection moved.