Differences between revisions 20 and 22 (spanning 2 versions)
Revision 20 as of 2017-12-15 09:30:14
Size: 2449
Editor: MarkBarton
Comment:
Revision 22 as of 2017-12-18 08:46:29
Size: 1817
Editor: MarkBarton
Comment:
Deletions are marked like this. Additions are marked like this.
Line 22: Line 22:
 * --(Double check prism heights.)--
 * --(Do mirror gluing.)--
 * Check mirror gluing.
Line 26: Line 23:
  * --(Hassle Miyo-kun for pico driver.)--
  * --(Set up for testing IP with pico driver.)--
  * --(Make pico cable.)--
  * Glue Misumi plug in movable mass (also glue remaining disks in IM flags).
  * Assemble IP.
  * Final assembly.
Line 32: Line 25:
 * --(Weigh BF.)--
  * --(Find accessories.)--
  * --(Do weighing.)--
Line 36: Line 26:
  * --(2 x Type 3-6m )--
Line 38: Line 27:
  * --(4)-- 3 x Type 4-1.5m
Line 40: Line 28:
  * --(7 x Type 2-2m)--
 * --(Set up SR2 rack)--
  * --(Get ADC/DAC/DIO cards)--
  * --(Get cables/cards for SR2)--
  * --(Get BIO white cables x 10)--
  * --(Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.)--
  * Get SR2 real-time model running (Yamamoto-san).
 * Set up SR2 rack
  * Get more 1-m power cables and connect up remaining boxes.
  * Run LAN and power cables for stepper drivers.
  * Debug SR2 real-time model (Yamamoto-san).
Line 49: Line 34:
 * Find and attach feedthroughs.
 * --(Find circuit boards for geophones)-- (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.)
  * --(Check if they have sockets soldered on.)-- (Yes.)
  * --(Check if they come with hex posts.)-- (Yes.)
Line 61: Line 42:
 * Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
 * Review Shoda-san's Guardian.
 * Review DIO stuff.
 * Review SR2 model (especially screens, macro text file).
 * Review DAC channel requests.
Line 65: Line 51:
 * Get geophone circuit boards from Okutomi-san.
 * Find fourth feedthrough
Line 66: Line 54:
 * Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
Line 71: Line 58:
 * Get geophone circuit boards from Okutomi-san.
 *

VIS Type B SR Near Term To-Do List

Archived To-Do Items

Every Week

Coming Weeks

Preparation for SR Installation

Every Week

Facilities

  • Vacuum and roll floor.
  • Wipe ladders.
  • Tidy tools, parts.
  • Get stuff from ../WishList

2017-12-11

  • Assemble SR2 IP.
    • Final assembly.
    • Test IP picos.
  • Find in-vac cables:
    • 1 x Type 3-2m
    • 5 x Type 1-2m
  • Set up SR2 rack
    • Get more 1-m power cables and connect up remaining boxes.
    • Run LAN and power cables for stepper drivers.
    • Debug SR2 real-time model (Yamamoto-san).
  • Do inventory of ballast masses.
  • Adjust verticality of assembly frame; center and immobilize optical table.
  • Find out (from Takahashi-san) specifications for geophone pod items:
    • Screws for pod (cap-neck and neck-body).
    • Cu O-rings for pod (two sizes)
    • Viton O-ring for under geophone.
    • Screws for immobilizing geophone (M4?).
    • Screws for geophone to interface plate.
    • Screws for interface plate to PI.
  • Find or order geophone items.
  • Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor).
  • Review Shoda-san's Guardian.
  • Review DIO stuff.
  • Review SR2 model (especially screens, macro text file).
  • Review DAC channel requests.

SR Prep Tasks - To Be Scheduled

  • Get geophone circuit boards from Okutomi-san.
  • Find fourth feedthrough
  • Hassle Miyo-kun for stepper drivers.
  • Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done.
  • Design final SF ballast masses (Fabian).
  • Get safety bars moved.
  • Get air hose connection moved.