2449
Comment:
|
2688
|
Deletions are marked like this. | Additions are marked like this. |
Line 13: | Line 13: |
=== Facilities === | ==== Facilities ==== |
Line 15: | Line 15: |
* Wipe ladders. | * Wipe ladders, assembly frame. |
Line 20: | Line 20: |
== Coming Weeks == | |
Line 21: | Line 22: |
== 2017-12-11 == * --(Double check prism heights.)-- * --(Do mirror gluing.)-- * Check mirror gluing. * Assemble SR2 IP. * --(Hassle Miyo-kun for pico driver.)-- * --(Set up for testing IP with pico driver.)-- * --(Make pico cable.)-- * Glue Misumi plug in movable mass (also glue remaining disks in IM flags). * Assemble IP. * Test IP picos. * --(Weigh BF.)-- * --(Find accessories.)-- * --(Do weighing.)-- * Find in-vac cables: * --(2 x Type 3-6m )-- * 1 x Type 3-2m * --(4)-- 3 x Type 4-1.5m * 5 x Type 1-2m * --(7 x Type 2-2m)-- * --(Set up SR2 rack)-- * --(Get ADC/DAC/DIO cards)-- * --(Get cables/cards for SR2)-- * --(Get BIO white cables x 10)-- * --(Hassle Miyakawa/Yamamoto to connect rack to DC power, Internet, etc.)-- * Get SR2 real-time model running (Yamamoto-san). * Do inventory of ballast masses. * Adjust verticality of assembly frame; center and immobilize optical table. * Find and attach feedthroughs. * --(Find circuit boards for geophones)-- (Okutomi-san says we have 5 free plus 5 tied up in his experiment till Feb-Mar 2018.) * --(Check if they have sockets soldered on.)-- (Yes.) * --(Check if they come with hex posts.)-- (Yes.) * Find out (from Takahashi-san) specifications for geophone pod items: * Screws for pod (cap-neck and neck-body). * Cu O-rings for pod (two sizes) * Viton O-ring for under geophone. * Screws for immobilizing geophone (M4?). * Screws for geophone to interface plate. * Screws for interface plate to PI. * Find or order geophone items. |
=== 2018-08-15 === ==== SR3 ==== * Controls work (Enzo and team). * Diagonalize OL (Terrence). * Do SF damper test (Hatoya-san). * Tune IP (Fujii-kun). === 2018-08-20 === ==== SR3 ==== * Hook LBB, add ballast mass. * Tune IP. ==== SR2 ==== * Adjust ballast/trim mass, with reserve for yaw stepper. * Cable/test PI items (LVDTs, steppers, geophones). * Set damper height. * Add arc weights, adjust IP. * Stage LBB damper rings in tank. ==== SRM ==== * Check gluing result - redo if necessary. * Assemble RM. * Add IM ballast masses (we forgot this before). * Get parts from AOL and set up new pitch-setting OL. * Hang metal mass. * Hang RM. ==== Software Etc ==== |
Line 65: | Line 54: |
* Hassle Miyo-kun for stepper drivers. * Install new jack receptacles (in SR3 area, second floor) on load gauge adapter (SR2 area, second floor). * Finish mass budget for SR2/SR3/SRM (Fabian) - mostly done. * Design final SF ballast masses (Fabian). * Get safety bars moved. * Get air hose connection moved. * Get geophone circuit boards from Okutomi-san. * |
=== Tunnel === * Rebuild PI #2 F0 for SRM. * Retrieve BNC-Lemo cable from Nakano-kun. * Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function. * Install, cable SR3 PI yaw stepper. * Correct flipped connections in SRM PI LVDTs. * Grab and configure a picomotor driver as SR2_BF 10.68.150.25. * Check SR2, SR3 TM coil gains for magnet polarity compensation. * Calibrate last six IM OSEMs. * Install geophone plates on PI #1 for SR2. * Rebuild filter in PI #2 for SRM. * Install clamps on PI #2 for SRM. * Install LBB blade units on PI #2 for SRM. * Install geophone plates on PI #2 for SRM. * Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2. === Mitaka or remotely === * Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually). * Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen. * Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?] * (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass. * Set up SR2 Guardian. * Install damping filters for SR2. * Review DAC channel requests. * Set up SR2 Guardian. * Install damping filters for SR2. * Split SRx real-time models? === Ordering === See ../WishList . |
VIS Type B SR Near Term To-Do List
Preparation for SR Installation
Every Week
Facilities
- Vacuum and roll floor.
- Wipe ladders, assembly frame.
- Tidy tools, parts.
Get stuff from ../WishList
Coming Weeks
2018-08-15
SR3
- Controls work (Enzo and team).
- Diagonalize OL (Terrence).
- Do SF damper test (Hatoya-san).
- Tune IP (Fujii-kun).
2018-08-20
SR3
- Hook LBB, add ballast mass.
- Tune IP.
SR2
- Adjust ballast/trim mass, with reserve for yaw stepper.
- Cable/test PI items (LVDTs, steppers, geophones).
- Set damper height.
- Add arc weights, adjust IP.
- Stage LBB damper rings in tank.
SRM
- Check gluing result - redo if necessary.
- Assemble RM.
- Add IM ballast masses (we forgot this before).
- Get parts from AOL and set up new pitch-setting OL.
- Hang metal mass.
- Hang RM.
Software Etc
SR Prep Tasks - To Be Scheduled
Tunnel
- Rebuild PI #2 F0 for SRM.
- Retrieve BNC-Lemo cable from Nakano-kun.
- Get at least one BIO Converter chassis fully connected (CONTEC BIO card, WD and stepper motor chassis) for implementation and test of stepper motor reset function.
- Install, cable SR3 PI yaw stepper.
- Correct flipped connections in SRM PI LVDTs.
- Grab and configure a picomotor driver as SR2_BF 10.68.150.25.
- Check SR2, SR3 TM coil gains for magnet polarity compensation.
- Calibrate last six IM OSEMs.
- Install geophone plates on PI #1 for SR2.
- Rebuild filter in PI #2 for SRM.
- Install clamps on PI #2 for SRM.
- Install LBB blade units on PI #2 for SRM.
- Install geophone plates on PI #2 for SRM.
- Replace chipped magnets (12x12x12 mm) in SR3 IP, H1 and H2.
Mitaka or remotely
- Write generic Type B Guardian; make BS and SR3 inherit from it; make analog WD optional for now (all suspensions will get them eventually).
- Create software stepper drivers for SR3 and SRM and link to them from STEP_MASTER.adl screen.
- Make three in-air stepper splitter cables for SR2, SR3 and SRM. [done?]
- (Continue to) soak the sapphire prisms off the dummy BS for reuse on the SRM metal mass.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Review DAC channel requests.
- Set up SR2 Guardian.
- Install damping filters for SR2.
- Split SRx real-time models?
Ordering
See ../WishList .